Advanced Search

column
Single-phase Distribution Transformers
Xu Dongliang, Hu Xiaokui, Zhang Yong, Ling Zhiying
2011(6): 5-6. DOI: 10.13882/j.cnki.ncdqh.2011.06.008
Abstract PDF
Regulating Management for Distribution Transformer Tappings
Wang Jifeng, Yu Xiaomu, Zhai Xiaofan, Wang Duanfeng
2011(6): 7-9. DOI: 10.13882/j.cnki.ncdqh.2011.06.009
Abstract PDF
Administrator of Three-phase Load Unbalance for Distribution Transformer
Li Haifeng, Zhan Tao, Wu Xuanguang, Xia Ming, Wang Weilin, Yu Xinghuo
2011(6): 10-12. DOI: 10.13882/j.cnki.ncdqh.2011.06.010
Abstract PDF
Using Innovation to Advance Development, to Achieve Benefit from Management
Li Yi, Shi Haoshan
2011(6): 13-14. DOI: 10.13882/j.cnki.ncdqh.2011.06.003
Abstract PDF
Integral Management System for Dispatch Production
Du Jianxiang, Feng Zhigang, Zhang Haibo
2011(6): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.06.011
Abstract PDF
High Level Applicable Software for Automatization of Belonging to County Level
Bu Luming
2011(6): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.06.012
Abstract PDF
Fast Treatment After Main Iron of Plug-in Type Foundation is Bended
Zhang Jiali
2011(6): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.06.013
Abstract PDF
Working Platform Design of Noumenon Turning Over for Amorphous Alloy Transformer
Feng Jun, Pang Jun, Wan Guoming
2011(6): 20-21. DOI: 10.13882/j.cnki.ncdqh.2011.06.014
Abstract PDF
Engineering Construction of Upgrade Reconstruction for Rural Village Power Network in Lingbao County
Li Yangjun
2011(6): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.06.004
Abstract PDF
Planning and Practice of Power Distribution Network in He County
Zhang Jun
2011(6): 23-24. DOI: 10.13882/j.cnki.ncdqh.2011.06.015
Abstract PDF
Preventive Lightning Protection of 35 kV Zhong-Ma Line
Liu Rujing
2011(6): 25-26. DOI: 10.13882/j.cnki.ncdqh.2011.06.016
Abstract PDF
Measures Preventive Conductor Breakage Due to Lightning Stroke for Insulated Conductors of Overhead Power Distribution Lines
Wang Xiaofeng, Zhou Wenjun, Yu Jianhui
2011(6): 27-28. DOI: 10.13882/j.cnki.ncdqh.2011.06.017
Abstract PDF
Preventive Lightning Measures of Automatic Equipment for Rural Village Substations
Jiang Tao
2011(6): 29-30. DOI: 10.13882/j.cnki.ncdqh.2011.06.018
Abstract PDF
Main Transformer Tripping Fault Due to 35 kV Line Accident
Wu Jianlin
2011(6): 32-33. DOI: 10.13882/j.cnki.ncdqh.2011.06.020
Abstract PDF
Fast Diagnosis and Search of Tripping Fault for Transmission Lines
Wang Shujun, Ji Ning
2011(6): 34-35. DOI: 10.13882/j.cnki.ncdqh.2011.06.021
Abstract PDF
110 kV Substation Outage Fault Under Special Operating Mode
Dai Shaoyong, Zhang Yan, Zhou Lifang
2011(6): 36-37. DOI: 10.13882/j.cnki.ncdqh.2011.06.022
Abstract PDF
Misoperation of Optical Fiber Differential Remote Tripping Protection for 110 kV Lines
Han Shu
2011(6): 38-39. DOI: 10.13882/j.cnki.ncdqh.2011.06.023
Abstract PDF
Power Communication Scheme of Charging Station for Electro-mobile
Wang Zhijin
2011(6): 40-41. DOI: 10.13882/j.cnki.ncdqh.2011.06.025
Abstract PDF
Application of Video System in Intellectualizing Substation
Zhu Bo, Wang Lu
2011(6): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.06.026
Abstract PDF
Hierarchic and Classified Monitoring of Supervisory Control Information in Substation Backstage
Zhang Jinrong, Liu XizoXu, Tuo Guoyuan, Li Pengxiang, Zhao Mingyi
2011(6): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.06.027
Abstract PDF
Table Back-up System Based on Network Storage Technology
Guan Yafei
2011(6): 46-46. DOI: 10.13882/j.cnki.ncdqh.2011.06.005
Abstract PDF
Intelligent Management System of LV Collecting Fee Network Edition in Advance
Xuan Manyu
2011(6): 47-48. DOI: 10.13882/j.cnki.ncdqh.2011.06.006
Abstract PDF
Reducing UT Clamp Stolen Rate of 35 kV Line Guy Wire
Wu Wei, Huang Pengli, He Ming
2011(6): 49-50. DOI: 10.13882/j.cnki.ncdqh.2011.06.028
Abstract PDF
Application of QC Activity in Installing Engineering for Substation
Zhang Baoze
2011(6): 50-51. DOI: 10.13882/j.cnki.ncdqh.2011.06.029
Abstract PDF
A New Move to Resolve Overhead Insulated Conductor Lightning Stroke Fault
Zhang Jianli
2011(6): 52-53. DOI: 10.13882/j.cnki.ncdqh.2011.06.030
Abstract PDF
Cable Type Wind Power Generation Equipment
Sun Hexin
2011(6): 54-55. DOI: 10.13882/j.cnki.ncdqh.2011.06.031
Abstract PDF
Float Sheave Sea Wave Power Generation Technology
Qu Yanming
2011(6): 56-57. DOI: 10.13882/j.cnki.ncdqh.2011.06.001
Abstract PDF
Improvement of Blocking Relationship Between 10 kV Main Switch and Isolating Trolley
Zhao Fei
2011(6): 57-58. DOI: 10.13882/j.cnki.ncdqh.2011.06.032
Abstract PDF
Case of Series Reactor Burning for 10 kV Capacitor
Li Miaolin
2011(6): 59-60. DOI: 10.13882/j.cnki.ncdqh.2011.06.033
Abstract PDF
Protective Switch with Obvious Breaking Point for Transformers
Huang Guohua
2011(6): 60-61. DOI: 10.13882/j.cnki.ncdqh.2011.06.034
Abstract PDF
Superficial Analysis of Designing Main Point for Complete Equipment
Li Zhen, Guo Yanru
2011(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2011.06.035
Abstract PDF
Superficial Analysis of Practical Method for Power Consumption Quantity Calculation in Region
Niu Ruiqing
2011(6): 63-63. DOI: 10.13882/j.cnki.ncdqh.2011.06.007
Abstract PDF
Correctly Knowing Importance of Vacuity Detection for Vacuum Switch
Chen Yongwang
2011(6): 64-64. DOI: 10.13882/j.cnki.ncdqh.2011.06.036
Abstract PDF