Du Jianxiang, Feng Zhigang, Zhang Haibo. Integral Management System for Dispatch Production[J]. RURAL ELECTRIFICATION, 2011, (6): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.06.011
Citation:
|
Du Jianxiang, Feng Zhigang, Zhang Haibo. Integral Management System for Dispatch Production[J]. RURAL ELECTRIFICATION, 2011, (6): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.06.011
|
Du Jianxiang, Feng Zhigang, Zhang Haibo. Integral Management System for Dispatch Production[J]. RURAL ELECTRIFICATION, 2011, (6): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.06.011
Citation:
|
Du Jianxiang, Feng Zhigang, Zhang Haibo. Integral Management System for Dispatch Production[J]. RURAL ELECTRIFICATION, 2011, (6): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.06.011
|