Advanced Search
CAO Yue, MA Jingyi. Shorten the Connecting and Disconnecting Wires Hours in Substation Relay Protection Verification[J]. RURAL ELECTRIFICATION, 2022, (1): 57-59. DOI: 10.13882/j.cnki.ncdqh.2022.01.017
Citation: CAO Yue, MA Jingyi. Shorten the Connecting and Disconnecting Wires Hours in Substation Relay Protection Verification[J]. RURAL ELECTRIFICATION, 2022, (1): 57-59. DOI: 10.13882/j.cnki.ncdqh.2022.01.017

Shorten the Connecting and Disconnecting Wires Hours in Substation Relay Protection Verification

More Information
  • Received Date: June 19, 2021
  • Relay protection verification is a kind of routine work including first verification, regular verification, additional verification and changing settings erc.All these verifications need to connect and disconnect wires. Relay protection verification needs poweroff and the verification hours relate to poweroff hours.ensuring poweron on time, improving the power supply reliability and making the business environment batter, new verification wire disc and box are made.Using these new tools, the verification hours are shortened, the potential risks are reduced.It's worth to spread widely.

  • Related Articles

    [1]TONG Nian, WU Zhikun, XIAO Wei, MA Shentong, SHEN Run. Analysis of Relay Protection for Distribution Networks in Small Resistance Grounded Substations[J]. RURAL ELECTRIFICATION, 2025, (5): 61-64. DOI: 10.13882/j.cnki.ncdqh.2407A056
    [2]GUO Zhongya, JIA Shenyu. Exploration on the Innovative Mode of Maintenance and Management of Relay Protection Equipment in Power System[J]. RURAL ELECTRIFICATION, 2025, (3): 37-39. DOI: 10.13882/j.cnki.ncdqh.2410A056
    [3]ZHANG Qiuyi, LI Mengna, HU Heng. Impact of New Energy Power Plant Connection on Power Grid Relay Protection[J]. RURAL ELECTRIFICATION, 2024, (1): 41-44. DOI: 10.13882/j.cnki.ncdqh.2024.01.011
    [4]ZHANG Xiang, LI Huiyong. Analysis of Two Cases of Relay Protection Missetting Resulting in Mistrip Accidents[J]. RURAL ELECTRIFICATION, 2023, (11): 39-40. DOI: 10.13882/j.cnki.ncdqh.2023.11.013
    [5]XIAN Jingjing. Analysis of Grounding Technology for Secondary System of Substation Relay Protection[J]. RURAL ELECTRIFICATION, 2023, (10): 24-26, 84. DOI: 10.13882/j.cnki.ncdqh.2023.10.007
    [6]FANG Yudong, CHEN Weihua, WU Jian, YE Renjie. Reflections on Relay Protection During "303" Power Outage in Taiwan, Province[J]. RURAL ELECTRIFICATION, 2023, (6): 13-17. DOI: 10.13882/j.cnki.ncdqh.2023.06.004
    [7]GAO Chao. Typical Experience of Relay Protection Setting Calculation in 35 kV Substation[J]. RURAL ELECTRIFICATION, 2023, (1): 93-95. DOI: 10.13882/j.cnki.ncdqh.2023.01.026
    [8]CHEN Zhixian. Discussion on Renovation Scheme Based on Time Limit Coordination of Relay Protection Operation of Small Hydro-station[J]. RURAL ELECTRIFICATION, 2022, (10): 75-78. DOI: 10.13882/j.cnki.ncdqh.2022.10.020
    [9]LI Xianjun, FANG Yong, LI Guangda. Research on Main Connection and Relay Protection Configuration of Distributed Synchronous Condenser in New Energy Station[J]. RURAL ELECTRIFICATION, 2022, (9): 63-67. DOI: 10.13882/j.cnki.ncdqh.2022.09.018
    [10]YUE Lianxing, WANG Jinping. Research on Fault Treatment of Distribution Network with the Cooperation of Relay Protection and Distribution Automation[J]. RURAL ELECTRIFICATION, 2022, (5): 26-27. DOI: 10.13882/j.cnki.ncdqh.2022.05.006

Catalog

    Article views (2) PDF downloads (1) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return