Hu Yin. Backup Protection Operation Resulted from Switch Open Phase in Transformer L.V. Side[J]. RURAL ELECTRIFICATION, 2015, (5): 20-20. DOI: 10.13882/j.cnki.ncdqh.2015.05.006