Wang Wenlin. To Reduce Carrying Out Delay Rate of Power Dispatching Operating Tickets[J]. RURAL ELECTRIFICATION, 2015, (4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2015.04.021
Citation:
|
Wang Wenlin. To Reduce Carrying Out Delay Rate of Power Dispatching Operating Tickets[J]. RURAL ELECTRIFICATION, 2015, (4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2015.04.021
|
Wang Wenlin. To Reduce Carrying Out Delay Rate of Power Dispatching Operating Tickets[J]. RURAL ELECTRIFICATION, 2015, (4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2015.04.021
Citation:
|
Wang Wenlin. To Reduce Carrying Out Delay Rate of Power Dispatching Operating Tickets[J]. RURAL ELECTRIFICATION, 2015, (4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2015.04.021
|