Zhang Weidong, Leng Zhijie, Wang Gang. To Reduce Rejection Operation Rate of Telemetry and Telecontrol in 35 kV Substations[J]. RURAL ELECTRIFICATION, 2014, (2): 48-48. DOI: 10.13882/j.cnki.ncdqh.2014.02.026
Citation:
|
Zhang Weidong, Leng Zhijie, Wang Gang. To Reduce Rejection Operation Rate of Telemetry and Telecontrol in 35 kV Substations[J]. RURAL ELECTRIFICATION, 2014, (2): 48-48. DOI: 10.13882/j.cnki.ncdqh.2014.02.026
|
Zhang Weidong, Leng Zhijie, Wang Gang. To Reduce Rejection Operation Rate of Telemetry and Telecontrol in 35 kV Substations[J]. RURAL ELECTRIFICATION, 2014, (2): 48-48. DOI: 10.13882/j.cnki.ncdqh.2014.02.026
Citation:
|
Zhang Weidong, Leng Zhijie, Wang Gang. To Reduce Rejection Operation Rate of Telemetry and Telecontrol in 35 kV Substations[J]. RURAL ELECTRIFICATION, 2014, (2): 48-48. DOI: 10.13882/j.cnki.ncdqh.2014.02.026
|