Advanced Search
Liu Changlin. Construction Technique Related to Concrete Fire Wall and Main Transformer Foundation in Qhuishui 220 kV Substation[J]. RURAL ELECTRIFICATION, 2013, (10): 19-21. DOI: 10.13882/j.cnki.ncdqh.2013.10.010
Citation: Liu Changlin. Construction Technique Related to Concrete Fire Wall and Main Transformer Foundation in Qhuishui 220 kV Substation[J]. RURAL ELECTRIFICATION, 2013, (10): 19-21. DOI: 10.13882/j.cnki.ncdqh.2013.10.010

Construction Technique Related to Concrete Fire Wall and Main Transformer Foundation in Qhuishui 220 kV Substation

  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return