Li Zheng, Li Lixin, Wang Shuo, Chen Lei, Zhang Ying. To Increase Medium-long Term Power Load Level Prediction[J]. RURAL ELECTRIFICATION, 2013, (5): 16-18. DOI: 10.13882/j.cnki.ncdqh.2013.05.016
Citation:
|
Li Zheng, Li Lixin, Wang Shuo, Chen Lei, Zhang Ying. To Increase Medium-long Term Power Load Level Prediction[J]. RURAL ELECTRIFICATION, 2013, (5): 16-18. DOI: 10.13882/j.cnki.ncdqh.2013.05.016
|
Li Zheng, Li Lixin, Wang Shuo, Chen Lei, Zhang Ying. To Increase Medium-long Term Power Load Level Prediction[J]. RURAL ELECTRIFICATION, 2013, (5): 16-18. DOI: 10.13882/j.cnki.ncdqh.2013.05.016
Citation:
|
Li Zheng, Li Lixin, Wang Shuo, Chen Lei, Zhang Ying. To Increase Medium-long Term Power Load Level Prediction[J]. RURAL ELECTRIFICATION, 2013, (5): 16-18. DOI: 10.13882/j.cnki.ncdqh.2013.05.016
|