Advanced Search

column
Research and Analysis of Latent Load Prediction in Rural Village Power Network
He Moling, Chen Ludong
2019(5): 5-9. DOI: 10.13882/j.cnki.ncdqh.2019.05.001
Abstract PDF
Approaching of Planning Administering Measures Related to“Low Voltage Problem in Rural LV Power Distribution Networks”
Chen Ludong, He Moling
2019(5): 10-13. DOI: 10.13882/j.cnki.ncdqh.2019.05.002
Abstract PDF
Safe Management and Control Measures in Field in Large-scale Extension Project for 500 kV Substations
Wang Di, Han Yu, Xiong Jian, Zhan Xiaoyou, Qi Mao
2019(5): 14-16. DOI: 10.13882/j.cnki.ncdqh.2019.05.003
Abstract PDF
Research of Optimized Model Related to Repair Scheme in Power Distribution Networks
Liu Zhen, Bai Lu, Tang Xuesong, He Xi, Yang Xuan, Qiu Jianping
2019(5): 17-20. DOI: 10.13882/j.cnki.ncdqh.2019.05.004
Abstract PDF
Research of Large-scale and Dispersed Air Conditioner Participated Ordered Peak Clipping in Power Networks
Cai Xiao
2019(5): 21-24. DOI: 10.13882/j.cnki.ncdqh.2019.05.005
Abstract PDF
Research and Application Driving out Birds of any Kind Device with Automatic Measuring and Controlling Functions Based on Doppler Effect Principle
Ji Ruiqi, Dong Huizhou
2019(5): 25-28. DOI: 10.13882/j.cnki.ncdqh.2019.05.006
Abstract PDF
Research and Application of Integrated Checking Method Related to Lightning Arrester Fault
Wang Weiping
2019(5): 29-31. DOI: 10.13882/j.cnki.ncdqh.2019.05.007
Abstract PDF
Effective Measure Related to Reduce Air Humidity in Long Gang RMU Cabinet Inside
Liu Jun, Yu Jiangshan, Yu Shuliang, Wang Yang, Yu Chengjiang
2019(5): 32-33. DOI: 10.13882/j.cnki.ncdqh.2019.05.008
Abstract PDF
Application of Insulating Bar Working Method in Charged Power Distribution Networks
Li Jianwei, Du Jian
2019(5): 34-36. DOI: 10.13882/j.cnki.ncdqh.2019.05.009
Abstract PDF
Reason Analysis and Preventive Measure Related to Twice Tripping at Same Time due to Lightning Stroke in 110 kV Double Circuit Lines on Same Tower
Wang Minghua, Zhang Zhang Guofeng, Liu Jianjun
2019(5): 37-39. DOI: 10.13882/j.cnki.ncdqh.2019.05.010
Abstract PDF
Case Analysis Related to Fault Diagnosis Treatment for a 35 kV Main Transformer Core Multipoint Earthing
Kong Jian, Xie Xin, Qu Qiang, Xue Li
2019(5): 40-42. DOI: 10.13882/j.cnki.ncdqh.2019.05.011
Abstract PDF
Fault Analysis and Countermeasures for a 10 kV Electric Power Distribution Line
Hou Yuanwen, Zhang Qingfeng, Zhu MingJia, Liu Xiangdong, Wei Ning
2019(5): 43-44. DOI: 10.13882/j.cnki.ncdqh.2019.05.012
Abstract PDF
A Case Analysis of Relaying Protection Fault in 35 kV Substations
Wei Junrong, Lv Jiangbo, Qi Anxin
2019(5): 45-46. DOI: 10.13882/j.cnki.ncdqh.2019.05.013
Abstract PDF
Reason Analysis and Improvement Proposition of All no Voltage in a 110 kV Substation in Urban Area
Yang Ling, Huang Gang, Deng Demao, Xiang Yang
2019(5): 47-48. DOI: 10.13882/j.cnki.ncdqh.2019.05.014
Abstract PDF
Applied Practice Related to Answered and Transcribed System of Regulation and Control Telephone with Manual Intelligence
Wu Chang, Liu Yibin, Li Zhen, Mao Wenjie, Yang Xiangming, Xie Yongsheng
2019(5): 49-50. DOI: 10.13882/j.cnki.ncdqh.2019.05.015
Abstract PDF
Analysis of Intelligent Retrofit of Auxiliary Equipment of Hydropower Station
Zhang Yan
2019(5): 51-53. DOI: 10.13882/j.cnki.ncdqh.2019.05.016
Abstract PDF
Development of a Wireless Construction Process Monitoring System Suited to HV Overhead lines
He Yuan, Zhai Dandan
2019(5): 54-58. DOI: 10.13882/j.cnki.ncdqh.2019.05.017
Abstract PDF
Reduction of Consumed Time Used for Wire Selection in Small Current Grounding Device Commissioning
Zhang Hui, Yang Jichao
2019(5): 59-60. DOI: 10.13882/j.cnki.ncdqh.2019.05.018
Abstract PDF
Development of Alarm Device Related to Metering Voltage Disappearance in Substations
Yang Dehao
2019(5): 61-62. DOI: 10.13882/j.cnki.ncdqh.2019.05.019
Abstract PDF
Coupling Agent Automatic Conveying Device of Porcelain Bottle Ultrasound Flaw Detection and Testing System
Yu Weicheng, Wu Wangye
2019(5): 63-64. DOI: 10.13882/j.cnki.ncdqh.2019.05.020
Abstract PDF
Artificial Researches of Flywheel Energy Storage System
Zhang Lei, Wang Shaokun, Gan Shilin, Yang Wenjian, Li Renwei, Li Hai
2019(5): 65-69. DOI: 10.13882/j.cnki.ncdqh.2019.05.021
Abstract PDF
Construction and Management of Operating Maintenance Related to Photovoltaic Intelligent Power Station
Dong Guofei
2019(5): 70-71. DOI: 10.13882/j.cnki.ncdqh.2019.05.022
Abstract PDF
Research and Application of a 10 kV Trolley Switch with Intelligent in Position Device in Substations
Wang Jiancheng, Gan Yucheng, Wang Zezhou, Xie Junmin
2019(5): 72-74. DOI: 10.13882/j.cnki.ncdqh.2019.05.023
Abstract PDF
Location and Treatment of Big Attenuation Point in Fiber Optic Cable Lines
He Zhouyuan
2019(5): 75-75. DOI: 10.13882/j.cnki.ncdqh.2019.05.024
Abstract PDF
Maintenance and Fault Treatment Related to Public Lighting Transformers
Li Tie
2019(5): 76-76. DOI: 10.13882/j.cnki.ncdqh.2019.05.025
Abstract PDF
Safety Tactics Suited to Co-operated Management Platform
Ge Quanzhi
2019(5): 77-77. DOI: 10.13882/j.cnki.ncdqh.2019.05.026
Abstract PDF
Application of cable duct construction technology in electric power engineering
Zhang Liang
2019(5): 78-79. DOI: 10.13882/j.cnki.ncdqh.2019.05.027
Abstract PDF