Integrated Plan Meticulous Management Research Explored Based on Big Data Suited to Electric Power Enterprises
Xie Yingjie, Xia Xiang, Fang Jianliang, Gao Qiang
2018(6): 5-9. DOI: 10.13882/j.cnki.ncdqh.2018.06.001
Abstract PDF
Analysis and Application of Equipment Monitoring Big Data Based on Supporting System of Intelligent Power Network Regulating and Control Technology
Tong Cunzhi, Wu Jiang, Zhan Wenda, Gao Qiang
2018(6): 10-13. DOI: 10.13882/j.cnki.ncdqh.2018.06.002
Abstract PDF
Administering and Control Tactics According to L.V. Three-phase Load Unbalance in Reversing Switch
Zhu Chengyu, Jin Weiqiang, Gu Peisheng, Zhang Guodong
2018(6): 14-16. DOI: 10.13882/j.cnki.ncdqh.2018.06.003
Abstract PDF
Planning Method and Applied Research of County Town Area Based on Target Network Frame for Power Distribution Network
Zen Hepu, Fan Hu, Ouyang Guang
2018(6): 17-20. DOI: 10.13882/j.cnki.ncdqh.2018.06.004
Abstract PDF
Reconstruction Scheme of D.C. System Suited to 110 kV Substations with No Break Electric Power Supply
Hu Dongyuan
2018(6): 21-22. DOI: 10.13882/j.cnki.ncdqh.2018.06.005
Abstract PDF
On-line Monitoring and Example Analysis of Fault Diagnosis Suited to Electric Power Primary Equipment
Xie Jianhua
2018(6): 23-24. DOI: 10.13882/j.cnki.ncdqh.2018.06.006
Abstract PDF
Analysis and Counter-measures Concerned in Difficult Point of H.V. Dielectric Loss Testing in 500 kV High-voltage Bushing
Zhang Yun
2018(6): 25-27. DOI: 10.13882/j.cnki.ncdqh.2018.06.007
Abstract PDF
Research and Application of Feed line Automation of 10 kV Distributing Lines
Chen Feiyu, Ou Fanghao
2018(6): 28-32. DOI: 10.13882/j.cnki.ncdqh.2018.06.008
Abstract PDF
Tripping Analysis and Counter-measure in 10 kV Rural Power Network Lines
Song Lie
2018(6): 33-35. DOI: 10.13882/j.cnki.ncdqh.2018.06.009
Abstract PDF
Fault Feature Analysis of 10 kV Power Distributing Networks in Beijing Outer Suburbs Area
Lu Yunhe
2018(6): 36-38. DOI: 10.13882/j.cnki.ncdqh.2018.06.010
Abstract PDF
Automatic Checkout System Used for Impedance Based on GPRS LV Power Line Carrier
Luo Shigang, Wang Linxin, Zhang Yonghong, Yu Xiangqian, Yang Peng
2018(6): 39-41. DOI: 10.13882/j.cnki.ncdqh.2018.06.011
Abstract PDF
Commissioning Scheme Suited to 220 kV Intelligent Substation Extended Engineering
Zheng Pai, Liu Chaohui, Liu Qingfu
2018(6): 42-43. DOI: 10.13882/j.cnki.ncdqh.2018.06.012
Abstract PDF
Application of Fast and Intelligent Fault Location System in Fault Search Suited to Mountain Area
Ding Zhengsheng, Jiang Yubo, Peng Kun
2018(6): 44-45. DOI: 10.13882/j.cnki.ncdqh.2018.06.013
Abstract PDF
To Increase Operating Reliability of Automatic System Suited to Dispatching
Jiao Huixia
2018(6): 46-48. DOI: 10.13882/j.cnki.ncdqh.2018.06.014
Abstract PDF
Multi-platform Interconnection Used for Exactly Infrared Temperature Measurement
Li Zhangcheng
2018(6): 49-50. DOI: 10.13882/j.cnki.ncdqh.2018.06.015
Abstract PDF
Infrared Auxiliary Make Policy System Suited to Power Distributing Line State Repair
Yu Yong, Ruan Haohao
2018(6): 51-52. DOI: 10.13882/j.cnki.ncdqh.2018.06.016
Abstract PDF
Reduction of Secondary Design Drawing Expended Time in 110 kV Intelligent Substations
Yang Jichao, Zhang Hui, Xu Qun, Li Jiahui, Chen Shen, Liu Ziliang, Li Feng, Wang Yu
2018(6): 53-54. DOI: 10.13882/j.cnki.ncdqh.2018.06.017
Abstract PDF
Increment of Covered Rate of Customer Cost Control for Special Transformer Customers
Zhao Kai, Shi Baoyao
2018(6): 55-56. DOI: 10.13882/j.cnki.ncdqh.2018.06.018
Abstract PDF
Reduction Related to Fault Outage Frequency for 10 kV Lines
Chen Youshuang, Chen Fuliang, Cai Zixuan
2018(6): 57-58. DOI: 10.13882/j.cnki.ncdqh.2018.06.019
Abstract PDF
Construction Related to Distributed Photovoltaic Power Generation Project in Roof
Huang Kun,
2018(6): 59-61. DOI: 10.13882/j.cnki.ncdqh.2018.06.020
Abstract PDF
Hydrogen Energy Storage Technology and Its Application in Regenerative Energy Resources Power Generation Storage
Tang Shasha
2018(6): 62-64. DOI: 10.13882/j.cnki.ncdqh.2018.06.021
Abstract PDF
Influence of Distributed Photovoltaic Power Generation Networking on Power Energy Quality in Power Distributing Networks
Shi Shuaibin
2018(6): 65-68. DOI: 10.13882/j.cnki.ncdqh.2018.06.022
Abstract PDF
Energy Storage Motors Fault in 10 kV Vacuum Circuit Breakers
Liu Gang, Jiao Guangxu, Yang Xiaoshuai, Guo Hongmei
2018(6): 69-70. DOI: 10.13882/j.cnki.ncdqh.2018.06.023
Abstract PDF
Development of Lifting Device Used for New Type Poles and Cross-arms
Xu Bing, Wang Yuren
2018(6): 71-73. DOI: 10.13882/j.cnki.ncdqh.2018.06.024
Abstract PDF
Overhead Insulation Distribution Line Load Materials Lightning Protection Applications
, ,
2018(6): 74-76. DOI: 10.13882/j.cnki.ncdqh.2018.06.025
Abstract PDF
Management and Applied Counter-measure Related to Electric Power Metering Technology
Dong Mingming
2018(6): 77-77. DOI: 10.13882/j.cnki.ncdqh.2018.06.026
Abstract PDF
The Impact of Small Hydropower Network on the Loss of Distribution Network and Its Solutions
Huang Xiqin
2018(6): 78-78. DOI: 10.13882/j.cnki.ncdqh.2018.06.027
Abstract PDF
Power Measurement Standardization Management Model
Liu Huaiyuan
2018(6): 79-79. DOI: 10.13882/j.cnki.ncdqh.2018.06.028
Abstract PDF