Research Concerned to Risk Probability for Transmission Lines
Jin Yao, Hu Qinghu, Su Guoqing
2017(7): 5-6. DOI: 10.13882/j.cnki.ncdqh.2017.07.001
Abstract PDF
Structure Related Advanced Nature Target System in Intelligent Substations
Liu Yueqi, Wu Shuyuan, Jin Yao
2017(7): 7-8. DOI: 10.13882/j.cnki.ncdqh.2017.07.002
Abstract PDF
Application of SVR Line Automatic Voltage Regulator in 10 kV Line Low Voltage Administering
Xie Zongxi, Zhang Ting
2017(7): 9-10. DOI: 10.13882/j.cnki.ncdqh.2017.07.003
Abstract PDF
Mode Selection of Across Constructing Based on AHP Method
Gao Miao
2017(7): 11-12. DOI: 10.13882/j.cnki.ncdqh.2017.07.004
Abstract PDF
Application of Typical Constructing Mode Based on Feeder Automatic in Zhangjiajie Power Distribution Networks
Zhang Zhizhong, Huang Donghai, Peng Jianning
2017(7): 13-15. DOI: 10.13882/j.cnki.ncdqh.2017.07.005
Abstract PDF
Technology and Tactics of Different Preventing Lightning Tripping for 220 kV Transmission Lines in Yueyang Area
Song Xianyong
2017(7): 16-18. DOI: 10.13882/j.cnki.ncdqh.2017.07.006
Abstract PDF
Technical Analysis Related to 10 kV H.V. Power Cables Fault in Cities
Li Long, Zhao Jianbo
2017(7): 19-20. DOI: 10.13882/j.cnki.ncdqh.2017.07.007
Abstract PDF
Research and Application of Victor Concentrated Measuring Method for Bus-bar Differential Protection
Liu Chuncheng, Yuan Cunchao, Wang Li
2017(7): 21-22. DOI: 10.13882/j.cnki.ncdqh.2017.07.008
Abstract PDF
Economic Operation Analysis and Measures Related to Regional Distribution Networks
Xu Jianhua
2017(7): 23-25. DOI: 10.13882/j.cnki.ncdqh.2017.07.009
Abstract PDF
Analysis and Treatment of A Circuit Breaker Exploding Fault for 10 kV Main Transformers
Liu Gang, Yang Xiaoshuai, Jiao Guangxu
2017(7): 26-27. DOI: 10.13882/j.cnki.ncdqh.2017.07.010
Abstract PDF
Operating Fault and Treatment in 10 kV Power Distribution Network Dispatching
Li Xiao, Ji Liangzhou
2017(7): 28-29. DOI: 10.13882/j.cnki.ncdqh.2017.07.011
Abstract PDF
Protective Device Arrangement Used for Main Transformer Neutral in 110 kV End Substations
Qu Yajun, Su Jian
2017(7): 30-31. DOI: 10.13882/j.cnki.ncdqh.2017.07.012
Abstract PDF
A Voltage Off-limit Event Analyses in 10 kV Bus in Substation
Dong Jinyang
2017(7): 32-32. DOI: 10.13882/j.cnki.ncdqh.2017.07.013
Abstract PDF
Reason Analyses of Switch-cabinet Burning for 10 kV Outgoing Line in 110 kV Substations
Hu Dongyuan
2017(7): 33-34. DOI: 10.13882/j.cnki.ncdqh.2017.07.014
Abstract PDF
Design of Portable Hand-held Terminal Used for RMU
Liu Tengfei, Wang Leike, Fan Xiaolong, Meng Yufei
2017(7): 35-36. DOI: 10.13882/j.cnki.ncdqh.2017.07.015
Abstract PDF
Measurement System Suited to Intelligent Warehouse Storage
Zheng Kaizeng
2017(7): 37-38. DOI: 10.13882/j.cnki.ncdqh.2017.07.016
Abstract PDF
Preventive Incorrect Operating Method for Remote Control Based on OPEN3000 System
Du Li, Song Mingmin, Zhu Jianrong, Du Liang, Wang Yonggang, Wang Rong
2017(7): 39-40. DOI: 10.13882/j.cnki.ncdqh.2017.07.017
Abstract PDF
Meticulous Information Measurement Systems Based on Moving Interconnection Used for Operation and Maintenance in Substations
Wang Haiou, Bai Jinquan, Chen Xingxiao, Yang Yi
2017(7): 41-42. DOI: 10.13882/j.cnki.ncdqh.2017.07.018
Abstract PDF
Design and Application of Automatic Management System Used for Compensation Degree in 66 kV Systems
Yuan Ye, Qu Chao, Kang Jie
2017(7): 43-44. DOI: 10.13882/j.cnki.ncdqh.2017.07.019
Abstract PDF
Enhancement Related to Correct rate of Metering Abnormal Alarming Data
Xu Yuting, Pan Leiluo, Shen Liuhuan, Shen Qian
2017(7): 45-45. DOI: 10.13882/j.cnki.ncdqh.2017.07.020
Abstract PDF
Reduction Related to Time of Switching Load Operation in 35 kV Substations
Li Xiaona, Li Jingyu
2017(7): 46-46. DOI: 10.13882/j.cnki.ncdqh.2017.07.021
Abstract PDF
To Reduce Frequency of Defect Occurrence for 35 kV Circuit Breakers
Zhang Zongshu, Li Xiaodong, Wang Qing
2017(7): 47-48. DOI: 10.13882/j.cnki.ncdqh.2017.07.022
Abstract PDF
To Reduce Fault Rate of Data Transmission Channel in Operating Team
Yu Guoying, Hu Xin, Bai Junguang, Li Quan
2017(7): 49-50. DOI: 10.13882/j.cnki.ncdqh.2017.07.023
Abstract PDF
Assessment Analysis Related to Admit Ability for Wind Power Plant
Zhang Hong, Zhu Bo
2017(7): 51-52. DOI: 10.13882/j.cnki.ncdqh.2017.07.024
Abstract PDF
Economic Dispatching Operation Related to Micro-power Network in Few Days Ago
Yin Shengli, Song Wei
2017(7): 53-54. DOI: 10.13882/j.cnki.ncdqh.2017.07.025
Abstract PDF
Lift Device Used for SF6 Cylinder in Storey
Li Weili
2017(7): 55-55. DOI: 10.13882/j.cnki.ncdqh.2017.07.026
Abstract PDF
Maintenance Tool Used for 35 kV Arc-extinguishing Tubes
Zeng Guang, Yu Jiangshan, Huang Congmei, Yu Shuliang, Wang Yang, Yu Chengjiang, Tao Shan, Xiao Bensheng
2017(7): 56-57. DOI: 10.13882/j.cnki.ncdqh.2017.07.027
Abstract PDF
New type Earthing Wire Device
Sui Dongyang, Wang Peng, Yang Shuang
2017(7): 58-58. DOI: 10.13882/j.cnki.ncdqh.2017.07.028
Abstract PDF
Cap Type Enclosed Box Used for Down Lead-in Bushing for OPGW
Zheng Weijun, Xu Hui, Zhao Jun
2017(7): 59-59. DOI: 10.13882/j.cnki.ncdqh.2017.07.029
Abstract PDF
Fault and Preventive Measures Suited to Power Cables
Zhang Xin, Liu Xusheng, Ding Baoshuai, Tang Zhenwei, Xuan Keyu, Eang Jingjing
2017(7): 60-60. DOI: 10.13882/j.cnki.ncdqh.2017.07.030
Abstract PDF
An Audio-visual Numbering Method to Prevent "Five Preventive" Lock be Wrong Laid Up
Shi Weizhao, Song Yang, Li Juan
2017(7): 61-61. DOI: 10.13882/j.cnki.ncdqh.2017.07.031
Abstract PDF
Investigation Related to Relaying Protection Arrangement in Intelligent Substations
Ge Yinglan
2017(7): 62-62. DOI: 10.13882/j.cnki.ncdqh.2017.07.032