Advanced Search

column
Typical Mode Researches of Intelligent Power Distribution Desk Area
Xie Guangzhi, Dong Huaqiang, Jiang Guirui, Du Kai, Gao Jing
2017(4): 5-6. DOI: 10.13882/j.cnki.ncdqh.2017.04.001
Abstract PDF
Applied Research Related to Intelligently Regulating and Compensating Power Capacitor Bank Suited to Power Distribution Networks
Xie Guangzhi, Zhang Jie, Xiao Guangling, Hao Lili
2017(4): 7-8. DOI: 10.13882/j.cnki.ncdqh.2017.04.002
Abstract PDF
Interrelated Nature Analysis of Load Due to Lowing Temperature in Power Network in Summer Based on Linear Regression and Atmospheric Temperature
Ge Fenglei
2017(4): 9-11. DOI: 10.13882/j.cnki.ncdqh.2017.04.003
Abstract PDF
Emulation of Extending Black Start Based on PSCAD Software
Xu Yan, Yang Xu, Hai Xiaotao
2017(4): 12-14. DOI: 10.13882/j.cnki.ncdqh.2017.04.004
Abstract PDF
DSTATCOM Application
Xiao Yan, Cai Xiaopeng, Fang Weihua, Chen Buxing
2017(4): 15-16. DOI: 10.13882/j.cnki.ncdqh.2017.04.005
Abstract PDF
Research of Conncting Mathod with No Dropping for Breaked Insulated Conductor
Xie Tongfu, Jin Xin
2017(4): 17-18. DOI: 10.13882/j.cnki.ncdqh.2017.04.006
Abstract PDF
Operating Analysis of Transmission Line Located in Goaf in Yulin Power Network
Guo Liang, Lu Anping
2017(4): 19-20. DOI: 10.13882/j.cnki.ncdqh.2017.04.007
Abstract PDF
Parameter Design Related to 35 kV AC XLPE Cable Changed to 3 Poles DC Operation
Yu Jingzhe
2017(4): 21-22. DOI: 10.13882/j.cnki.ncdqh.2017.04.008
Abstract PDF
Example Removed Fault in Intelligent Central Signaling Device
Xu Jidong, Hou Yanpeng, Wang Jiankun
2017(4): 23-24. DOI: 10.13882/j.cnki.ncdqh.2017.04.009
Abstract PDF
Existed Hidden Trouble and Improved Measure in Main Transformer with "Small Different Protection" and Inner Bridging Connection
Wang Munan, Huang Jun, Li Peipei
2017(4): 25-27. DOI: 10.13882/j.cnki.ncdqh.2017.04.010
Abstract PDF
Diagnostic Application of TEA and AE Methods Suited to Metal – Enclosed Switch Cabinets in Electrified Operation
Wang Xuejin, Cai Jianhui, Liu Chong, Huang Jilai
2017(4): 28-28. DOI: 10.13882/j.cnki.ncdqh.2017.04.011
Abstract PDF
Partial Discharge Fault of Insulator Discovered with Infrared and Ultraviolet Jointly Checking
Jin Yao, Wang Zhaoyang, Chen Xiaofang, Hu Qinghu
2017(4): 29-29. DOI: 10.13882/j.cnki.ncdqh.2017.04.012
Abstract PDF
Research Related to Communication Transmission Network Structure Belonging to Provincial Level in "Thirteenth Five-year Plan" for Hubei Province Electric Power
Chen Jingjia, Zhang Mingzhao, Xiang Hui
2017(4): 30-32. DOI: 10.13882/j.cnki.ncdqh.2017.04.013
Abstract PDF
Calibration System of Automation Assembly Line for Intelligent Watt-hour Meters
Wang Ke, Sun Lina, Liu Chen, Hang Hongjun, Zeng Huiming
2017(4): 33-34. DOI: 10.13882/j.cnki.ncdqh.2017.04.014
Abstract PDF
Research of on Duty Management System in Electric Power Network Enterprises
Xue Zhiqiang, Liu Xing
2017(4): 35-36. DOI: 10.13882/j.cnki.ncdqh.2017.04.015
Abstract PDF
Thorough Inquiry and Application Related to Intelligent Business Hall System in Electric Power Systems
Gong Fangwei, Hu Xingang, Liu Jingang, Lv Hong, Luo Bing, Li Qiang
2017(4): 37-39. DOI: 10.13882/j.cnki.ncdqh.2017.04.016
Abstract PDF
Applied Analysis Related to Intelligent Five Preventive Measures in Wulanchabu Electric Power Network
Hu Huaiwei
2017(4): 40-41. DOI: 10.13882/j.cnki.ncdqh.2017.04.017
Abstract PDF
Optimization and Raise of Operating Efficiency and Accuracy of Marking Discernment Suited for Electric Power Network Equipment State
Zhang Ning, Li Weixun
2017(4): 43-44. DOI: 10.13882/j.cnki.ncdqh.2017.04.019
Abstract PDF
Installing Technique of L.V. Service Lines and House Lead-in Lines Used in Rural Village
Liu Chang
2017(4): 45-47. DOI: 10.13882/j.cnki.ncdqh.2017.04.020
Abstract PDF
Influence of Fouling on Photovoltaic Power Generation
Pei Na
2017(4): 48-49. DOI: 10.13882/j.cnki.ncdqh.2017.04.021
Abstract PDF
Reactive Power Optimization of Electric Power System Included wind Power Generation Based on Particle Group Algorithm
Pu Heng
2017(4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2017.04.022
Abstract PDF
Application of Temperature Indicator Used for Cable-head in RMU
Chen Yinfeng
2017(4): 52-53. DOI: 10.13882/j.cnki.ncdqh.2017.04.023
Abstract PDF
Alarming Device for Power Source Fault Checking Used for Dispatching Automation Equipment
Liu Hui
2017(4): 54-55. DOI: 10.13882/j.cnki.ncdqh.2017.04.024
Abstract PDF
Development Related to A Drop-out Fuse with Double-fuse-element arc-extinguishing Tube
Wang Zhongyang
2017(4): 56-57. DOI: 10.13882/j.cnki.ncdqh.2017.04.025
Abstract PDF
Development and Application of an Installing Tool Suited to Disconnecting Switch Mechanism
Wu Wei
2017(4): 58-59. DOI: 10.13882/j.cnki.ncdqh.2017.04.026
Abstract PDF
Existed Problem and Counter-measure Related to Metering Property Management in Electric Power Enterprise
Dong Mingming
2017(4): 60-60. DOI: 10.13882/j.cnki.ncdqh.2017.04.027
Abstract PDF
Electric Power Equipment State Repair Faced to Object Internet Technology
Liu Qingqing, Zhai Yingzi
2017(4): 61-62. DOI: 10.13882/j.cnki.ncdqh.2017.04.028
Abstract PDF
Technical Treatment and Preventive and Control Measures for 10 kV Power Distribution Network Operation Fault
Guo Yu
2017(4): 62-62. DOI: 10.13882/j.cnki.ncdqh.2017.04.029
Abstract PDF