Advanced Search

column
Exploration and Analysis of Unified Data Collecting Implement in Power Distribution Network Belong to County Level
Wang Yinzhong
2017(1): 5-7. DOI: 10.13882/j.cnki.ncdqh.2017.01.001
Abstract PDF
Typical Wiring Form and Adaptability for H.V. Power Distribution Network
Wang Yinzhong
2017(1): 8-9. DOI: 10.13882/j.cnki.ncdqh.2017.01.002
Abstract PDF
Optimization Design of Narrow Pylons for Four-circuit Circuits of 110 kV Transmission Line
Shen Moqun, Liu Hui, Tu Weiming
2017(1): 10-11. DOI: 10.13882/j.cnki.ncdqh.2017.01.003
Abstract PDF
Comparison and Selection of Power Distribution Network Frame Intellectualization Plans in City Based on LCC
Liu Bei
2017(1): 12-13. DOI: 10.13882/j.cnki.ncdqh.2017.01.004
Abstract PDF
Researches of EMC Creeping Test for Intelligent Watt-hour Meter
Yin Bo, Liu Li, Wang Jiahan, Liu Zhenbo, Li Dewei, Wang Jun, Li Xiran
2017(1): 14-15. DOI: 10.13882/j.cnki.ncdqh.2017.01.005
Abstract PDF
Talking of Application and Reliability Management Related to Intelligent Residual Current Operating Protectors
Yu Zhaozhong, Zhao Qiming, Li Te, Huang Xiang
2017(1): 16-17. DOI: 10.13882/j.cnki.ncdqh.2017.01.006
Abstract PDF
Application Related to Flexible Graphite Flat Earthing Body in Reducing Earthing Resistance for Poles and Towers
Guo Peng, Wang Changji, Li Xuhui, Wang Xipeng, Yang Xia
2017(1): 18-19. DOI: 10.13882/j.cnki.ncdqh.2017.01.007
Abstract PDF
Fault of Elbow Cable Termination in 10 kV Pole-mounted Transformers
Yu Le
2017(1): 20-20. DOI: 10.13882/j.cnki.ncdqh.2017.01.008
Abstract PDF
Reason Analysis Related to Cable Burning for 10 kV Power Capacitors
Liu Yadong, Zhang Lianqi, Wang Hengchao
2017(1): 21-21. DOI: 10.13882/j.cnki.ncdqh.2017.01.009
Abstract PDF
A fault Analyses of Main Transformer Outage Due to Line Fault
Chu Yanling, Gao Ming, Wang Jianjie, Zhang Jingping, Pan Jiale
2017(1): 22-23. DOI: 10.13882/j.cnki.ncdqh.2017.01.010
Abstract PDF
Reason Analysis and Counter-measure Related to A 10 kV Wall Bushing Burning Fault
Wang Ziqun, Wang Peng
2017(1): 24-24. DOI: 10.13882/j.cnki.ncdqh.2017.01.011
Abstract PDF
Managerial System of Operation and Maintenance for Electric Power Metering Device Based on Moving Job Termination
He Xiaojun, Liu Qingqing
2017(1): 25-26. DOI: 10.13882/j.cnki.ncdqh.2017.01.012
Abstract PDF
Development and Utilization in Energy Management Practice for Electric Power Metering Management System
Yu Liqun
2017(1): 27-28. DOI: 10.13882/j.cnki.ncdqh.2017.01.013
Abstract PDF
Ventilating and Dehumidifying System with Preventive Dewing for Electric Switch Cabinet
Wang Yansheng, Gu Bochao
2017(1): 29-30. DOI: 10.13882/j.cnki.ncdqh.2017.01.014
Abstract PDF
Dispatching Phone Recovery System Construction Based on Information WAN
Wen Tao
2017(1): 31-32. DOI: 10.13882/j.cnki.ncdqh.2017.01.015
Abstract PDF
Planning and Operating Optimization for Low-carbon Power System
Zhou Ming
2017(1): 33-34. DOI: 10.13882/j.cnki.ncdqh.2017.01.016
Abstract PDF
Application Related to Soft Exchange Technology in Power System Automation
Xing Dacheng
2017(1): 35-36. DOI: 10.13882/j.cnki.ncdqh.2017.01.017
Abstract PDF
A Home Electric Boiler Heating Facility
Chen Youshuang, Chen Fuliang, Tang Qi
2017(1): 37-37. DOI: 10.13882/j.cnki.ncdqh.2017.01.018
Abstract PDF
Crooked Device Used for Cable Head of Switch Cabinets for Incoming and Outing Lines
Liu Chunhui
2017(1): 38-38. DOI: 10.13882/j.cnki.ncdqh.2017.01.019
Abstract PDF
To Shorten Replaced Time for Guide Shaft in Pushcart Switch
Wang Lizhi, Li Dong, Song Wei, He Donglang
2017(1): 39-39. DOI: 10.13882/j.cnki.ncdqh.2017.01.020
Abstract PDF
Repair Tactics for Power Network Considered Micro-electric Power Network Switching In
Jin Yao, Zhang Miaomiao, Hu Qinghu
2017(1): 40-41. DOI: 10.13882/j.cnki.ncdqh.2017.01.021
Abstract PDF
Influence of Small Water Power Plant Synchronizing and Closing on County Level Power Network
Shao Xingzhi, Li Yun, Guo Sizhe
2017(1): 42-45. DOI: 10.13882/j.cnki.ncdqh.2017.01.022
Abstract PDF
Simulation Modeling and Characteristics Analysis of Typical Distributed Generation
Jing Jiangping, Dai Xingyu, Zhu Wentao, Che Ze, Shi Weicheng, Li Yang
2017(1): 46-48. DOI: 10.13882/j.cnki.ncdqh.2017.01.023
Abstract PDF
Heating Analysis of Reduced Parallel Groove Clamp and Engineering Administering
Wang Bo, Li Zichuan
2017(1): 49-51. DOI: 10.13882/j.cnki.ncdqh.2017.01.024
Abstract PDF
In the Home Cabinet Current Transformer Lifting Device
Yan Liwei, Wang Zhenkun, Tu Yongwei, Yao Haiyan, Hu Xiaoqin
2017(1): 52-54. DOI: 10.13882/j.cnki.ncdqh.2017.01.025
Abstract PDF
Design and Research of Intelligent Kilo-watt-hour Meter with Anti-remote Control Stealing Electric Energy Based on Infrared Checkout
Ren Ling, Chen Jianpeng
2017(1): 55-57. DOI: 10.13882/j.cnki.ncdqh.2017.01.026
Abstract PDF
Common Problems in Earthing Design for Hydroelectric Generating Plant
Li Ping
2017(1): 59-59. DOI: 10.13882/j.cnki.ncdqh.2017.01.028
Abstract PDF
Critical Technology and Problem in Cable Laying Out for Power Transformation and Distribution Engineering
Lin Qiyuan
2017(1): 60-60. DOI: 10.13882/j.cnki.ncdqh.2017.01.029
Abstract PDF
Solved Tactics Related to Switching in Impulse Tripping Problem for Large Capacity Transformers
Sui Dongyang, ,
2017(1): 61-61. DOI: 10.13882/j.cnki.ncdqh.2017.01.030
Abstract PDF