Advanced Search

column
Reconstruction Schemes for Power Distribution System Automatic Network
Jiang Guorui, Li Yulong, Du Kai, Zhang Changsheng
2016(9): 5-8. DOI: 10.13882/j.cnki.ncdqh.2016.09.001
Abstract PDF
New Type Fault Location System for Power Distribution Lines
Li Yulong, Jiang Guorui, Zhang Changsheng, Dong Huaqiang
2016(9): 9-10. DOI: 10.13882/j.cnki.ncdqh.2016.09.002
Abstract PDF
GIS Have Application in Power Distribution Management
Zhang Jin, Li Yulong, Li Yubin, Ma Qian
2016(9): 11-13. DOI: 10.13882/j.cnki.ncdqh.2016.09.003
Abstract PDF
Evaluation and Outlook of Intelligent Substation Construction in Yichang
He Lianbin, Yang Lingxi, Zhou Wei, Peng Haiyan
2016(9): 14-16. DOI: 10.13882/j.cnki.ncdqh.2016.09.004
Abstract PDF
Construction Mode Related to New Type and Intelligent Power Distribution Desk Power Supply Area
Wang Li, Wang Jinli, Jiang Fuxiu
2016(9): 17-19. DOI: 10.13882/j.cnki.ncdqh.2016.09.005
Abstract PDF
pplicable Research of Ultrasonic Location Technology in Fault of Field Voltage Withstand Test for GIS
Yan Dong, Chu Jinliang, Shao Xianjun
2016(9): 20-22. DOI: 10.13882/j.cnki.ncdqh.2016.09.006
Abstract PDF
Mounted Quality Problem Analysis of Bushing Type Current Transformer Used for Main Transformer
Xiao Cheng
2016(9): 23-24. DOI: 10.13882/j.cnki.ncdqh.2016.09.007
Abstract PDF
Defect and Maintenance Related to Equipment Clamps in Substations
Liu Gang, Yang Xiaoshua, Jiao Guangxu
2016(9): 25-26. DOI: 10.13882/j.cnki.ncdqh.2016.09.008
Abstract PDF
Fault Analysis and Measure of Treatment for Operation and Maintenance in Intelligent Substation
Liu Zengjin, Zhao Dawei, Du Heng
2016(9): 27-29. DOI: 10.13882/j.cnki.ncdqh.2016.09.009
Abstract PDF
An Lncorrect Operation Analysis of High Back-up Protection Used for 35 kV Transformers
Dong Jinyang, Zhang Zhiqiang, Fan Yu, Zhang Yanping
2016(9): 30-31. DOI: 10.13882/j.cnki.ncdqh.2016.09.010
Abstract PDF
Reason Analysis and Preventive Counter Measure of Earthing Transformer Protection Incorrect Operation
Lin Huixin, Li Wencheng
2016(9): 32-33. DOI: 10.13882/j.cnki.ncdqh.2016.09.011
Abstract PDF
Reason Analysis and Preventive Measure of Conductor Fall Away From Dead-end Clamp in 110 kV Overhead Lines
Wang Bangle, Chen Yan, Wang Jun, Liu Feng, Xu Chuanbai
2016(9): 34-35. DOI: 10.13882/j.cnki.ncdqh.2016.09.012
Abstract PDF
Analyses and Diagnoses for 110 kV Capacitive Voltage Transformer Abnormality
Ke Zhuliang, Wang Yunlong, Wang Junxing
2016(9): 36-37. DOI: 10.13882/j.cnki.ncdqh.2016.09.013
Abstract PDF
On-1ine Monitoring System for Iron Core Earthing Current of Transformer Based on GPRS
Wang Haiou, Bai Jinquan, Chen Qunfeng, Chang Yongsheng
2016(9): 38-40. DOI: 10.13882/j.cnki.ncdqh.2016.09.014
Abstract PDF
Practice and Extension Related to ‘‘Straight Barge Electricity’’ of CSG Ⅱ Marketing Management System
Wu Yi
2016(9): 41-41. DOI: 10.13882/j.cnki.ncdqh.2016.09.015
Abstract PDF
Application Concerned to Intelligent Technology in Electrical Energy Metering
Ma Hongyan, Fu Xingwan, Hou Jiangtao
2016(9): 42-43. DOI: 10.13882/j.cnki.ncdqh.2016.09.016
Abstract PDF
Terminal System of On-1ine Monitoring Used for Drop Type Fuse Link for 10 kV Lines
Zhao Chunlin, Jiang Yucheng, Gao Jianning
2016(9): 44-46. DOI: 10.13882/j.cnki.ncdqh.2016.09.017
Abstract PDF
Application Related to Visualizing Technology in Power Dispatching Automatic System
Du Bin
2016(9): 47-48. DOI: 10.13882/j.cnki.ncdqh.2016.09.018
Abstract PDF
Intelligent Broadcast System for Power Supply Service Based on Internet Platform
Yan Tingxue
2016(9): 49-50. DOI: 10.13882/j.cnki.ncdqh.2016.09.019
Abstract PDF
To Increase Collecting Success Rate of LV Copying kWh Meter Reading in Rural Village
Chen Yang, Xu Hualei
2016(9): 51-51. DOI: 10.13882/j.cnki.ncdqh.2016.09.020
Abstract PDF
Increment Related to One-shot Notifying Rate for Business Expansion
Wang Zhichao, Liu Tao
2016(9): 52-52. DOI: 10.13882/j.cnki.ncdqh.2016.09.021
Abstract PDF
Distributed Shunt DC Power Source System
Fan Jie, Sun Yonghua
2016(9): 53-54. DOI: 10.13882/j.cnki.ncdqh.2016.09.022
Abstract PDF
Distributed Power Source Synchronizing and Switching on Power Network and Related to Region Power Network Influence
Qi Zhanyu, Zhuang Yuan, Wang Bo
2016(9): 55-56. DOI: 10.13882/j.cnki.ncdqh.2016.09.023
Abstract PDF
Improvement of Secondary Design Defect of Reserve Power Source Automatic Connection Device for Incoming Line
Huang Jianzhong
2016(9): 57-59. DOI: 10.13882/j.cnki.ncdqh.2016.09.024
Abstract PDF
Design Scheme of Reserve Power Source Automatic Connection Device in Substation with Four Power Source Incoming Lines
Lu Chanyu
2016(9): 60-60. DOI: 10.13882/j.cnki.ncdqh.2016.09.025
Abstract PDF
A Few Ideas Related to Relaying Protection Reconstruction, Regulation and Testing in 35 kV Substations
Li Junqi
2016(9): 61-61. DOI: 10.13882/j.cnki.ncdqh.2016.09.026
Abstract PDF
Realized Mode of Safe Risk and Active Safe Prevention Used for Power Secondary System
Li Chengxun, Jia Mingfeng, Tian Chengliang
2016(9): 62-62. DOI: 10.13882/j.cnki.ncdqh.2016.09.027
Abstract PDF