Advanced Search

column
Caught Hold of Opportunity Again Combated with Peak
Wu Xuefeng
2016(6): 5-6. DOI: 10.13882/j.cnki.ncdqh.2016.06.001
Abstract
Analysis and Increased Measure of Reliability of Control Circuit Relay and Component of High Voltage Circuit Breaker
Wang Geng, Li Tieling
2016(6): 7-9. DOI: 10.13882/j.cnki.ncdqh.2016.06.002
Abstract PDF
Trial-Manufacture Research and Application of Monitoring/Far-End Checking and Testing Equipment Faced to Intelligent
Li Tieling
2016(6): 10-11. DOI: 10.13882/j.cnki.ncdqh.2016.06.003
Abstract PDF
Integrated Evaluation Related to Electric Energy Quality in Power Systems
Lu Jun, Huo Yaxin, Zhang Teng
2016(6): 12-13. DOI: 10.13882/j.cnki.ncdqh.2016.06.004
Abstract PDF
Automation Design Related to Electric Secondary Equipment in Substation
Gan Jingfu, Li Naixin, Zhao Fuwang, Yao Qinghua, Chen Weili
2016(6): 14-15. DOI: 10.13882/j.cnki.ncdqh.2016.06.005
Abstract PDF
Distribution Network Planning and Optimized Operation According to Distributed Power Supply Coming in
Zeng Changjie
2016(6): 16-17. DOI: 10.13882/j.cnki.ncdqh.2016.006.006
Abstract PDF
Working Method of Reversed Pressure Connection for Strain Clamp Used in Large Cross Section Conductors
Xu An, Zhang Jianfei
2016(6): 18-19. DOI: 10.13882/j.cnki.ncdqh.2016.06.007
Abstract PDF
Technical Research of Design and Double Protection Used for 220 kV Overhead Transmission Lines
Zhang Rui
2016(6): 20-21. DOI: 10.13882/j.cnki.ncdqh.2016.06.008
Abstract PDF
Applied Simple Talking Related to Fast Identified Technology of Cables Utilized Electro Magnetic Induction Principle
Mao Yuanwei
2016(6): 22-22. DOI: 10.13882/j.cnki.ncdqh.2016.06.009
Abstract PDF
Application of Information Merging Technology in Transformer Fault Diagnoses
Zhao Ruilan
2016(6): 23-25. DOI: 10.13882/j.cnki.ncdqh.2016.06.010
Abstract PDF
Research of Faulty Line Selection in Neutral Point Unearthed Power Distribution Network
Zhao Suijun
2016(6): 26-27. DOI: 10.13882/j.cnki.ncdqh.2016.06.011
Abstract PDF
Protection Against Lightning and Modified Measure Concerned with 110 kV Overhead Transmission Lines
Lin Decheng
2016(6): 28-29. DOI: 10.13882/j.cnki.ncdqh.2016.06.012
Abstract PDF
Reason Analyses of Reclosing Failure for 220 kV Circuit Breakers
Dai Shaoyong, Liu Guotao, Wang Hongyin
2016(6): 30-31. DOI: 10.13882/j.cnki.ncdqh.2016.06.013
Abstract PDF
Analysis and Countermeasure for a TA Exploded Fault
Wang Zhen, Zhao Yingbo, Li Yong, Qin Xiaoli
2016(6): 32-32. DOI: 10.13882/j.cnki.ncdqh.2016.06.014
Abstract PDF
Analyzing of a Case that Reclosing Cannot be Start
Wang Junhua, Ye Shujun, Lv Tao, Zhang Jianye, Wu Xiaobo, Yang Hanqing
2016(6): 33-34. DOI: 10.13882/j.cnki.ncdqh.2016.06.015
Abstract PDF
Simple Talking Related to Problems of Tele-signal Gathering and Processing Method in Dispatching Sub-station
Sun Wencheng
2016(6): 35-36. DOI: 10.13882/j.cnki.ncdqh.2016.06.016
Abstract PDF
Application Related to Intelligent Monitoring Technology in Rural Power Distributing Networks
Fan Xinju, Sun Maozhu
2016(6): 37-38. DOI: 10.13882/j.cnki.ncdqh.2016.06.017
Abstract PDF
Dispatching Control Systems of Intelligent Power Network Belong to District and County Integration
Li Weixun, Zhang Ning, Shi Zheng
2016(6): 39-40. DOI: 10.13882/j.cnki.ncdqh.2016.06.018
Abstract PDF
Differential Protection and Intelligent Optimization of Step Switch for 10 kV Distribution Lines in Rural Power Network
Ruan Xijiang
2016(6): 41-43. DOI: 10.13882/j.cnki.ncdqh.2016.06.019
Abstract PDF
Design and Application of Terminal System of Distributed Station and Place Based on Wi-Fi Combined Network
Zhang Haili, An Zhiguo, Li Yingchun, Meng Yufei
2016(6): 43-44. DOI: 10.13882/j.cnki.ncdqh.2016.06.020
Abstract PDF
Application of High-level Function Used for DC Power Supply in Unattended Substations
Luo Yingkang
2016(6): 45-46. DOI: 10.13882/j.cnki.ncdqh.2016.06.021
Abstract PDF
Increasing Covering Rate of Remote Operating for Substation Equipment
Li Yue, Wang Wenlin
2016(6): 47-47. DOI: 10.13882/j.cnki.ncdqh.2016.06.022
Abstract PDF
Development of Shear Used for High Tee Branch with Insulated Drag-link
Hei Zhiqiang
2016(6): 48-48. DOI: 10.13882/j.cnki.ncdqh.2016.06.023
Abstract PDF
A Distributed Photovoltaic Region Supervisory (Counter-Isolated Island) System Based on Under Multi-Network Mode
Yu Jiangshan, Zeng Guang, Zhang Cheng, Xiao Bensheng, Liu Chunyang
2016(6): 49-50. DOI: 10.13882/j.cnki.ncdqh.2016.06.024
Abstract PDF
Influence of Photovoltaic Generation Synchronizing and Closing Power Network on Reserve Power Source Automatic Connection and Measures in Substations
Qi Bo
2016(6): 51-51. DOI: 10.13882/j.cnki.ncdqh.2016.06.025
Abstract PDF
High-voltage Disconnecting Switch Cabinet Mounted Insulating Barrier
An Xinning, Zhang Jingjie, Lv Kunlu, Liu Min
2016(6): 52-53. DOI: 10.13882/j.cnki.ncdqh.2016.06.026
Abstract PDF
Development Related to Check Device of Oil Temperature Monitoring System for Main Transformers
Xing Haiqing, Wang Qianwei, Xu Yujin
2016(6): 54-55. DOI: 10.13882/j.cnki.ncdqh.2016.06.027
Abstract PDF
Surge Arrestor Application in Rural Village Power Consumption Information Collection
Pan Zhihao
2016(6): 56-58. DOI: 10.13882/j.cnki.ncdqh.2016.06.028
Abstract PDF
Simple Talking Related to Application of Automation in Electrical Engineering
Li Hugang, Zhou Jianning
2016(6): 59-59. DOI: 10.13882/j.cnki.ncdqh.2016.06.029
Abstract PDF
Technical Quality Analysis and Working Process Inquisition for Power Distribution Network Construction Engineering
Wang Shixiong, Wang Li
2016(6): 60-60. DOI: 10.13882/j.cnki.ncdqh.2016.06.030
Abstract PDF
Analysis Related to Problems and Counter Tactics in Repairing and Testing Process for Substation Equipment
Fan Heming
2016(6): 61-61. DOI: 10.13882/j.cnki.ncdqh.2016.06.031
Abstract PDF
Critical Technical Analysis Related to Operation And Maintenance in Intelligent Substation
Wang Bing
2016(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2016.06.032
Abstract PDF