Advanced Search

column
Central Monitoring System of Power Communication Stations Points in County Area
Xiong Xin
2016(2): 5-8. DOI: 10.13882/j.cnki.ncdqh.2016.02.001
Abstract PDF
USB Power Source System in Power Supply Enterprise in County Level
Xiong Xin, Li Hui, Min Nan, Xiong Shoukang, Hu Yanfen
2016(2): 9-10. DOI: 10.13882/j.cnki.ncdqh.2016.02.002
Abstract PDF
Fault Automatic Positioning and Load Monitoring System for Power Distribution Network
Xiong Xin, Zhou Biao, Li Hui, Zhang Jinxiu, Min Nan
2016(2): 11-12. DOI: 10.13882/j.cnki.ncdqh.2016.02.003
Abstract PDF
Approaching Concerned to Secondary Circuit Reconstruction in 500 kV Substations
Bai Wenguang
2016(2): 13-14. DOI: 10.13882/j.cnki.ncdqh.2016.02.004
Abstract PDF
Technical Research and Realization Based on Multiple-function, Portable Earthing Wire
Wang Yuanfei, Qian Xin
2016(2): 15-16. DOI: 10.13882/j.cnki.ncdqh.2016.02.005
Abstract PDF
Main Transformer-feeder Direct Power Supply Schemes in Rural Village 35 kV Substation
Li Meng
2016(2): 17-18, 21. DOI: 10.13882/j.cnki.ncdqh.2016.02.006
Abstract PDF
Improvement Analyses of Reserve Power Source Automatic Connection Device for 110 kV Power Network
Han Shu
2016(2): 19-21. DOI: 10.13882/j.cnki.ncdqh.2016.02.007
Abstract PDF
Forced Interlock Reconstruction of XGN Switch Cabinet
Zhuo Baocheng, Wang Jinzhu, Pang Dayong
2016(2): 22-22. DOI: 10.13882/j.cnki.ncdqh.2016.02.008
Abstract PDF
Problems and Improvement Methods of Closing and Energy Storage Circuit of ZF4-126 Circuit Breaker
Luo Zhenhua
2016(2): 23-25. DOI: 10.13882/j.cnki.ncdqh.2016.02.009
Abstract PDF
Realization Related to Operate Section Disconnecting Switch of Buses in Equal Potential Using By-pass Disconnecting Switch for Out Lines
Wang Liangui
2016(2): 26-26. DOI: 10.13882/j.cnki.ncdqh.2016.02.010
Abstract PDF
Overheat Fault Treatment of Bolts Along Flange for Transformer
Li Zheng
2016(2): 27-27. DOI: 10.13882/j.cnki.ncdqh.2016.02.011
Abstract PDF
D.C. Earthing Fault Treatment in Substations
Zhang Zhiqiang, Dong Jinyang, Fan Yu, Zhang Yanping
2016(2): 28-29. DOI: 10.13882/j.cnki.ncdqh.2016.02.012
Abstract PDF
Analysis and Recommendation Related to Influence of UHV Transformers on Relaying Protection
Li Qiang
2016(2): 30-31. DOI: 10.13882/j.cnki.ncdqh.2016.02.013
Abstract PDF
Related to Optimizing Tactics of 500 kV Circuit Breaker Not Work and Dead Zone Protections
Ou Weilei
2016(2): 32-33. DOI: 10.13882/j.cnki.ncdqh.2016.02.014
Abstract PDF
Management and Application of Power Customer Addresses Based on Structure
Kong Xufeng, Yu Chengbiao, Lin Shiyong
2016(2): 34-35. DOI: 10.13882/j.cnki.ncdqh.2016.02.015
Abstract PDF
Business Expansion and Electricity Demand Application Optimization Based on SG186 Marketing Business Application System
Huang Xinlei, Liu Yuerong, Guo Juan
2016(2): 36-37. DOI: 10.13882/j.cnki.ncdqh.2016.02.016
Abstract PDF
Design and Realization of Remote Monitoring System of Energy Efficiency Related to Power Utilization of Enterprises
Shi Xiang, Dou Wanghui
2016(2): 38-39. DOI: 10.13882/j.cnki.ncdqh.2016.02.017
Abstract PDF
Intelligent Control Systems Used for Substation Installations
Zeng Guang, Yu Jiangshan, Yu Shuliang, Xiao Bensheng, Song Chengcheng
2016(2): 40-41. DOI: 10.13882/j.cnki.ncdqh.2016.02.018
Abstract PDF
Design and Application Related to Technical Support System for Electric Power Safety Production in Rural Village Area
Mu Ting, Zhu Peng
2016(2): 42-43. DOI: 10.13882/j.cnki.ncdqh.2016.02.019
Abstract PDF
Applications Concerned to Microcomputer in Preventive Electric Incorrect Operations
Meng Fanqi
2016(2): 44-45. DOI: 10.13882/j.cnki.ncdqh.2016.02.020
Abstract PDF
Development Related to Portable Electric Energy Metering Device
Chao Wenwei, Zhou Jie, Mo Xinglong
2016(2): 46-47. DOI: 10.13882/j.cnki.ncdqh.2016.02.021
Abstract PDF
Distributed Photovoltaic and Biomass Energy Generations Boost Intelligent New Rural Village Construction
Li Mingli, Liu Yuanjun
2016(2): 48-50. DOI: 10.13882/j.cnki.ncdqh.2016.02.022
Abstract PDF
Scheme Research of Connecting in Metering Calculating Cost Based on Distributed Photovoltaic Generating System
Zhou Bangzhi
2016(2): 51-53. DOI: 10.13882/j.cnki.ncdqh.2016.02.023
Abstract PDF
An Integrated Signaling Device Based on Operational Amplifier
Xu Jidong, Wang Yinghe, Ai Yuewu, Yang Xu
2016(2): 54-55. DOI: 10.13882/j.cnki.ncdqh.2016.02.024
Abstract PDF
Popularization and Application of Drawing Drum Used for HV and LV Conductor and Cable Laying Work
Wang Xiangwei, Lan Ying
2016(2): 56-57. DOI: 10.13882/j.cnki.ncdqh.2016.02.025
Abstract PDF
Solved Scheme Concerned to Earthing Point in Northern Area Power Network
Ma Zhongwen, Qian Yong
2016(2): 58-58. DOI: 10.13882/j.cnki.ncdqh.2016.02.026
Abstract PDF
Exploration Related to Reconstruction of LV Instrument Transformer with Customer Electricity Rate Control
Huang Ming
2016(2): 59-59. DOI: 10.13882/j.cnki.ncdqh.2016.02.027
Abstract PDF