Applied Exploration of BlM Technology Based on Internet
Shu Lan, Xie Lihaoran
2016(12): 5-6. DOI: 10.13882/j.cnki.ncdqh.2016.12.001
Abstract PDF
Optimization Related to Perfect Outage Construction Plan for 220 kV Double Buses Double Sectionalizing in 500 kV Substations
Shu Lan, Lan Lan
2016(12): 7-8. DOI: 10.13882/j.cnki.ncdqh.2016.12.002
Abstract PDF
Researches of Anti-lightning Risk Type in Transmission Lines
Shu Lan, Lan Lan
2016(12): 9-11. DOI: 10.13882/j.cnki.ncdqh.2016.12.003
Abstract PDF
Design Technology and Method of Electric Secondary System Working Drawing in Intelligent Substation
Wan Shujuan, Feng Yan, Jin Yanyun
2016(12): 12-13. DOI: 10.13882/j.cnki.ncdqh.2016.12.004
Abstract PDF
Discussion of Necessity Related to Fire-fighting Equipment Intellectualization in Substations
Han Jing
2016(12): 14-16. DOI: 10.13882/j.cnki.ncdqh.2016.12.005
Abstract PDF
Adaptive Fault Ranging Algorithm for Double Circuit Line Based on Reversed Component
Sun Yueqin, Wang Haigang, Xie Min, Guo Mingyu, Wen Junliang
2016(12): 17-19. DOI: 10.13882/j.cnki.ncdqh.2016.12.006
Abstract PDF
Management Index Contrast Related to Outage Time and Outage Time Analysis in Haikou Power Supply Company
Shi Yinyue
2016(12): 20-22. DOI: 10.13882/j.cnki.ncdqh.2016.12.007
Abstract PDF
Fault and Solved Measure in Operation for 10 kV Switch Cabinet
Lin Cunqu
2016(12): 23-25. DOI: 10.13882/j.cnki.ncdqh.2016.12.008
Abstract PDF
Configuration Analysis and Application of Distributing Transformer with High Overload Capacity in Rural Village Power Network
Huang Zhenyu
2016(12): 26-27. DOI: 10.13882/j.cnki.ncdqh.2016.12.009
Abstract PDF
Wetting and Dehumidifying for Switch Cabinet in Power Distribution Network
Xiao Yu
2016(12): 28-28. DOI: 10.13882/j.cnki.ncdqh.2016.12.010
Abstract PDF
Inquiry Related to Repair, Operation and Maintenance Problems in Intelligent Substation
Zheng Tongwei, Hu Yongqiang
2016(12): 29-30. DOI: 10.13882/j.cnki.ncdqh.2016.12.011
Abstract PDF
Typical Fault Analysis and Enlightenment in Xianyang Power Distribution Network
Liu Yang
2016(12): 31-32. DOI: 10.13882/j.cnki.ncdqh.2016.12.012
Abstract PDF
Fault Analysis and Treatment of a H.V. Bushing Oil Leakage in 66 kV Transformers
Bi Changsheng, Ning Bo, Gu Zhuguang, Song Dedong, Zhao Zhiyuan, Chen Shaobo
2016(12): 33-33. DOI: 10.13882/j.cnki.ncdqh.2016.12.013
Abstract PDF
Analysis of Complex Fault Protection Action and Recording of 35 kV Transmission Line with Multipoint Grounding
Haung Xin
2016(12): 34-35. DOI: 10.13882/j.cnki.ncdqh.2016.12.014
Abstract PDF
Optimizing Plan of Dispatching System and Power Supply Integrated Automation
Liu Yan, Wang Shengyuan
2016(12): 36-37. DOI: 10.13882/j.cnki.ncdqh.2016.12.015
Abstract PDF
Constructing Technology of System Platform Used for "Low Voltage" Monitoring and Three Phase Automatic Regulation
Jia Likai
2016(12): 38-39. DOI: 10.13882/j.cnki.ncdqh.2016.12.016
Abstract PDF
Intellectualizing Construction Related to Rural Village Power Networks
Luo Fengbin
2016(12): 40-41. DOI: 10.13882/j.cnki.ncdqh.2016.12.017
Abstract PDF
Single Chip Processor Monitoring System Based on Rural Village Substations
Sheng Bin
2016(12): 42-43. DOI: 10.13882/j.cnki.ncdqh.2016.12.018
Abstract PDF
Design and Application of 10 kV Automatic Power Distribution Networks Based on Power Supply Reliability
Zheng Xiangling
2016(12): 44-45. DOI: 10.13882/j.cnki.ncdqh.2016.12.019
Abstract PDF
Development and Application Related to Intelligent Driving out Bird Device
Hei Zhiqiang
2016(12): 46-46. DOI: 10.13882/j.cnki.ncdqh.2016.12.020
Abstract PDF
Promoting Method of Collecting Successful Rate Based on Data Analysis
Wang Tao
2016(12): 47-47. DOI: 10.13882/j.cnki.ncdqh.2016.12.021
Abstract PDF
Reduction Related to Treatment Time of Earthed Fault for D.C. System
Zhang Feng
2016(12): 48-49. DOI: 10.13882/j.cnki.ncdqh.2016.12.022
Abstract PDF
How to increase safety of electroscope application
Gao Yonghui, Li Li, Liu Hexin
2016(12): 50-50. DOI: 10.13882/j.cnki.ncdqh.2016.12.023
Abstract PDF
A New Adaptive Protection Method Based on Inversed Type Micro-power Network
Yang Xu, Xu Yan, Hai Xiaotao
2016(12): 51-53. DOI: 10.13882/j.cnki.ncdqh.2016.12.024
Abstract PDF
Constructed Method and Implement Innovation for Inserted Type Angle Steel Square Foundation
Song Weiting, Song Weiyang, Zhou Yuanyuan, Hong Jun, Li Jiqiang, Ju Tao
2016(12): 54-56. DOI: 10.13882/j.cnki.ncdqh.2016.12.025
Abstract PDF
Risk assessment method used for power secondary system safety
Li Chengxun, Jia Mingfeng
2016(12): 57-57. DOI: 10.13882/j.cnki.ncdqh.2016.12.026
Abstract PDF
Reason Influenced Cost Rate Calculation of Multi-rate Watt-hour Meter and Solution
Liu Fuqi
2016(12): 58-58. DOI: 10.13882/j.cnki.ncdqh.2016.12.027
Abstract PDF