Advanced Search

column
To Strengthening Management in Inside and to Establish Images in Outside
Tao Zunqun
2015(6): 5-6. DOI: 10.13882/j.cnki.ncdqh.2015.06.001
Abstract PDF
Photo-voltaic Power Generating Project Installed in Roof Located in Hongse Homeland
Tao Zunqun
2015(6): 7-9. DOI: 10.13882/j.cnki.ncdqh.2015.06.002
Abstract PDF
Pilot Engineering Related to Power Communication Network in County Region
Xiao Wenbiao
2015(6): 10-11. DOI: 10.13882/j.cnki.ncdqh.2015.06.003
Abstract PDF
Resolved Ways of "Low Voltage" Problem in Rural Power Network End
Zhou Jing
2015(6): 12-13. DOI: 10.13882/j.cnki.ncdqh.2015.06.004
Abstract PDF
Correct Selection and Application Related to Contacting Hardware in Rural Power Network Lines
Yu Lei
2015(6): 14-15. DOI: 10.13882/j.cnki.ncdqh.2015.06.005
Abstract PDF
Planning Design of Reconstruction in Rural Village Power Network Belong to 10 kV and Below
Fan Qingbo, Shao Na
2015(6): 16-17. DOI: 10.13882/j.cnki.ncdqh.2015.06.006
Abstract PDF
Lightning Overvoltage Fault Analysis for 110 kV Main Transformers
Li Fenghai, Liu Lijun, Gao Yuhang, Ye Xiaochen
2015(6): 18-20. DOI: 10.13882/j.cnki.ncdqh.2015.06.007
Abstract PDF
Lightning Preventive Technology Related to Intelligent Residual Current Operating Protector
Chen Zhu, Li Qing, Tang Youming
2015(6): 21-21. DOI: 10.13882/j.cnki.ncdqh.2015.06.008
Abstract PDF
Applications of Lightning Stroke Champing Protection for Lines in 10 kV Line Layout Points
He Fei, Xu Hui, Jiang Kun, Huang Hua, Shi Shan, Yang Xia
2015(6): 22-24. DOI: 10.13882/j.cnki.ncdqh.2015.06.009
Abstract PDF
Research and Reconstruction Related to Lightning Preventive Problems in Overhead Transmission Lines
Zuo Jianyong
2015(6): 25-27. DOI: 10.13882/j.cnki.ncdqh.2015.06.010
Abstract PDF
Non-excitation Tap Changer Faults in 10 kV A.C. Transformers
Tao Mingjie
2015(6): 28-29. DOI: 10.13882/j.cnki.ncdqh.2015.06.011
Abstract PDF
Analysis and Treatment Related to Insulation Abnormality in Final Screen of Main Transformers Bushing
Li Shoupeng, Zhu Nianjie, Li Ziguo
2015(6): 30-30. DOI: 10.13882/j.cnki.ncdqh.2015.06.012
Abstract PDF
Analysis of Discharge Gap Breakdown in Transformer Neutral
Wang Kaiqi, Wang Dongsheng
2015(6): 31-32. DOI: 10.13882/j.cnki.ncdqh.2015.06.013
Abstract PDF
Analysis and Counter-measures of Frequent Tripping Faults of Zero Sequence Protection
Wang Xianhua
2015(6): 33-34. DOI: 10.13882/j.cnki.ncdqh.2015.06.014
Abstract PDF
Integral Monitoring Subsystem Used in Intelligent Power Distribution Platform Region
Yu Yang
2015(6): 35-37. DOI: 10.13882/j.cnki.ncdqh.2015.06.015
Abstract PDF
Design of Intelligent Platform Region Termination Based on OMAPL138
Yue Renchao, Sun Jiandong, Liu Xiaoming
2015(6): 38-39. DOI: 10.13882/j.cnki.ncdqh.2015.06.016
Abstract PDF
Analytic Platform Based on Real-time Mapped Fault Vector in Station
Liu Ran
2015(6): 40-41. DOI: 10.13882/j.cnki.ncdqh.2015.06.017
Abstract PDF
Application Related to Intelligent Assemblies in Coming City Substation
Yang Yun, Yao Weijin, Li Yan
2015(6): 42-43. DOI: 10.13882/j.cnki.ncdqh.2015.06.018
Abstract PDF
Rural Power Integrated Information System
Huang Qihua
2015(6): 44-46. DOI: 10.13882/j.cnki.ncdqh.2015.06.019
Abstract PDF
Reducing Carried out Time of Dispatching Command Ticket
Wang Zezhou
2015(6): 47-47. DOI: 10.13882/j.cnki.ncdqh.2015.06.020
Abstract PDF
To Use Online Monitoring of Transmission Lines in Order to Increase Line Operating Reliability
Chen Xianqing
2015(6): 48-49. DOI: 10.13882/j.cnki.ncdqh.2015.06.021
Abstract PDF
Voltage Control Method Increasing LVRT Ability in Direct Current Side of Photo-voltaic Power Generating Station
Cai Changqing, Hu Jin
2015(6): 50-51. DOI: 10.13882/j.cnki.ncdqh.2015.06.022
Abstract PDF
Measures Increasing Power Supply Reliability in Island Region in Sea
Zhang He, Zhou Nan, Mei Di, Yang Guangzhong, Xu Fubin
2015(6): 52-54. DOI: 10.13882/j.cnki.ncdqh.2015.06.023
Abstract PDF
Application of Open Type GIS in Oil Field Power Network
Mou Xiaoping, Zhang Fan, Han Zhiqiang
2015(6): 55-56. DOI: 10.13882/j.cnki.ncdqh.2015.06.024
Abstract PDF
10 kV Insulated Punching Line Clamp
Huang Hao
2015(6): 57-58. DOI: 10.13882/j.cnki.ncdqh.2015.06.025
Abstract PDF
Perfect Measure Preventive Incorrect Operation for 10 kV Packaged Switch Cabinet
Huang Guozhao
2015(6): 59-59. DOI: 10.13882/j.cnki.ncdqh.2015.06.026
Abstract PDF
Characteristic and Selection of Cable Used for Constructional Electric Engineering
Li Jinqian, Zhang Shaohui
2015(6): 60-60. DOI: 10.13882/j.cnki.ncdqh.2015.06.027
Abstract PDF
Simple Talking Related to Application and Maintenance for Low Voltage Acquisition System
Lv Haixia, Zheng Xiangling, Fang Lianhe
2015(6): 61-61. DOI: 10.13882/j.cnki.ncdqh.2015.06.028
Abstract PDF
Measures Reducing Earthed Resistances
Chen Hongyu
2015(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2015.06.029
Abstract PDF