Advanced Search

column
To Innovating Drive to Assist Rapid Rise
Chen Huijun, Chen Sihai
2015(2): 5-6. DOI: 10.13882/j.cnki.ncdqh.2015.02.001
Abstract PDF
Constructing Scheme Related to Compact type Package Substations
Chen Huijun, Chen Sihai
2015(2): 7-9. DOI: 10.13882/j.cnki.ncdqh.2015.02.002
Abstract PDF
A 3G Intelligent Copying kWh Meter Reading System with Unnecessary to Ascent a Height
Chen Huijun, Chen Sihai
2015(2): 10-11. DOI: 10.13882/j.cnki.ncdqh.2015.02.003
Abstract PDF
Design of 110 kV and Above High Voltage Power Cable Lines
Yue Zongkun
2015(2): 12-13. DOI: 10.13882/j.cnki.ncdqh.2015.02.004
Abstract PDF
Reconstruction Related to 220 kV Double-bus and Double-sectionalized Bus Protection in Jiangjiaying 500 kV Substation
Zhu Jiangfeng, Guo Zaifu
2015(2): 14-15. DOI: 10.13882/j.cnki.ncdqh.2015.02.005
Abstract PDF
Applications Related to Carbon Fiber Composite Core Conductors in Transmission Lines
Bai Weiguang
2015(2): 16-17. DOI: 10.13882/j.cnki.ncdqh.2015.02.006
Abstract PDF
Exploration and Practices of Integral Energy Saving Technology in Rural Village Power Network
Luo Ziyu, Liu Jialu, Wang Jia, Yu Wei
2015(2): 18-19. DOI: 10.13882/j.cnki.ncdqh.2015.02.007
Abstract PDF
Reactive Voltage Optimization Based on Power Distribution Network
Ye Weibao, Yang Shaowei, Wu Hua, Zheng Weiwei, Liu Hongbo
2015(2): 20-21. DOI: 10.13882/j.cnki.ncdqh.2015.02.008
Abstract PDF
To Administer "Low Voltage" Using 4 Steps Voltage Regulation and Control
Wang Yuandong, Peng Chaode, Huang Wenjing, Zhang Weiwei
2015(2): 22-23. DOI: 10.13882/j.cnki.ncdqh.2015.02.009
Abstract PDF
Simply and Easy Checkout Method Related to Inserted Depth of Manual Trolley in Switch Cabinet
Chen Wu
2015(2): 24-26. DOI: 10.13882/j.cnki.ncdqh.2015.02.010
Abstract PDF
Reason Analysis and Treatment Means Related to Power Utilization Abnormality Due to Three-phase Four-wire System
Bai Zhijun
2015(2): 27-27. DOI: 10.13882/j.cnki.ncdqh.2015.02.011
Abstract PDF
Back-up Protection Tripping of Main Transformer Resulted from Multi-circuit Faults
Lai Yong, Wan Xinqiang, Wang Yunjie
2015(2): 28-29. DOI: 10.13882/j.cnki.ncdqh.2015.02.012
Abstract PDF
Reason Analyses of Current Transformer Defect in Main Transformer M.V. Side in 220 kV Substation
Wang Yue, Gong Weifeng
2015(2): 30, 31. DOI: 10.13882/j.cnki.ncdqh.2015.02.013
Abstract PDF
Search and Treatment of a Main Transformer Oil Seepage Fault
He Rupeng
2015(2): 31-31. DOI: 10.13882/j.cnki.ncdqh.2015.02.014
Abstract PDF
Event Analysis of Reserve Power Supply Automatic Connection Device Rejecting Operation of 35 kV Bus-tie Circuit Breakers
Cao Guangfu
2015(2): 32-32. DOI: 10.13882/j.cnki.ncdqh.2015.02.015
Abstract PDF
Fault Analysis Related to 35 kV Bus Voltage Transformer Burning
Yan Liwei, Xu Gang, Zhang Bingquan, Fang Chenxi
2015(2): 33-33. DOI: 10.13882/j.cnki.ncdqh.2015.02.016
Abstract PDF
Reason Analyses of 35 kV Main Transformer Fault
Wang Ping, Wang Xingui, Ma Yulin
2015(2): 34-35. DOI: 10.13882/j.cnki.ncdqh.2015.02.017
Abstract PDF
Line Patrol, Operation, Maintenance, Management and Control System Based on GPS
Qiu Juchun, Zhou Xianjun, Sheng Qiulin
2015(2): 36-37. DOI: 10.13882/j.cnki.ncdqh.2015.02.018
Abstract PDF
Application Related to Power Automatic Technology in Power Engineering
Zhao Juqing, Xiang Dihui, Luo Yimin
2015(2): 38-39. DOI: 10.13882/j.cnki.ncdqh.2015.02.019
Abstract PDF
Auxiliary System Used in Standardizing Working in Substations
Ji Wenkui, Fang Jialin, Wang Minwei
2015(2): 40-42. DOI: 10.13882/j.cnki.ncdqh.2015.02.020
Abstract PDF
Applications of Remote Copying kWh Meter Reading System in Power Business and Marketing
Wang Guojian, Wang Lu, Zhao Yan
2015(2): 43-43. DOI: 10.13882/j.cnki.ncdqh.2015.02.021
Abstract PDF
Reducing Fitting Time of Earthing Conductor in 10 kV RMU
Ye Yufeng, He Chunguang, Jiang Chunying, Lu Zhiming
2015(2): 44-44. DOI: 10.13882/j.cnki.ncdqh.2015.02.022
Abstract PDF
To Increasing to be Put in Storage Rate of Used kWh Meters
Chao Wenwei
2015(2): 45-46. DOI: 10.13882/j.cnki.ncdqh.2015.02.023
Abstract PDF
Reducing Replacing Time of Wiring Stubs in Distribution Transformers
Ma Li, Lu Zhuqing, Wei Huixin, Yang Xiujun
2015(2): 47-47. DOI: 10.13882/j.cnki.ncdqh.2015.02.024
Abstract PDF
Power Consumption Information Collecting Cards Used for Customers
Liang Weixing, Dong Yuan
2015(2): 48-48. DOI: 10.13882/j.cnki.ncdqh.2015.02.025
Abstract PDF
Remote Isolated Power Network Checkout in Power Generating System of Distributed Connecting into Network
Dang Ke, Yang Fulei, Zhang Huiming, Yan Gangui
2015(2): 49-51. DOI: 10.13882/j.cnki.ncdqh.2015.02.026
Abstract PDF
Reconstruction Experiences of ZN28-12 Operating Mechanism
Zhang Miaoyi
2015(2): 52-53. DOI: 10.13882/j.cnki.ncdqh.2015.02.027
Abstract PDF
Module Combined Package Substation
Liu Yang, Sun Jian, Yin Runliang, Li Bin
2015(2): 54-55. DOI: 10.13882/j.cnki.ncdqh.2015.02.028
Abstract PDF
Related to Hand-hold Copying Layout Tool in Power Distribution Terminal Site
An Zhiguo, Wu Nalei
2015(2): 56-57. DOI: 10.13882/j.cnki.ncdqh.2015.02.029
Abstract PDF
To Increasing Power Supply Reliability of Power Supply Enterprises Belonging to County Level
Jia Kun
2015(2): 58-58. DOI: 10.13882/j.cnki.ncdqh.2015.02.030
Abstract PDF
Refined Managements of Single Line Diagram of Power Distribution Network
Huang Fangfang, Wang Qi
2015(2): 59-59. DOI: 10.13882/j.cnki.ncdqh.2015.02.031
Abstract PDF
Perfect Measures Used for Power System Relaying Protections
Xing Dacheng
2015(2): 60-60. DOI: 10.13882/j.cnki.ncdqh.2015.02.032
Abstract PDF
Simple Talking Related to Fault Reason and Treating Method in Power Transformers
Fan Heming
2015(2): 61-61. DOI: 10.13882/j.cnki.ncdqh.2015.02.033
Abstract PDF