Advanced Search

column
Intelligent Measuring Device Used in Three Phase Combined Instrument Transformer Error
Wang Zhilong, Zhang Chang, Fu Jiajia, Chen Lei, Sun Jun, Jin Xiaoming
2015(12): 5-7. DOI: 10.13882/j.cnki.ncdqh.2015.12.001
Abstract PDF
Improvement Related to Dispatching Automatic System in Dispatching and Control Integration Construction
Du Li, Song Mingmin, Du Liang, Tang Dawei
2015(12): 8-9. DOI: 10.13882/j.cnki.ncdqh.2015.12.002
Abstract PDF
Isolated Commissioning Concerned to Monitoring System in Operating Substation Reconstruction Engineering
Wang Xiaohui
2015(12): 10-12. DOI: 10.13882/j.cnki.ncdqh.2015.12.003
Abstract PDF
Customer Load Simulation and Load Predictive Method in Distributing Station Area Based on Monte-Carlo Method
Zhang Jian, Wang Yi, Fang Hengfu, Sheng Wanxing, Wang Jinli
2015(12): 13-15. DOI: 10.13882/j.cnki.ncdqh.2015.12.004
Abstract PDF
Application of Steel Earthing Material Coated Copper
Wang Yuebin, Wang Wei, Chen Shuhong
2015(12): 16-17. DOI: 10.13882/j.cnki.ncdqh.2015.12.005
Abstract PDF
Realization of Remote Definite Value Setting Functions in Distribution Network
Ma Yanxia, Yang Longyu
2015(12): 18-19. DOI: 10.13882/j.cnki.ncdqh.2015.12.006
Abstract PDF
Crucial Technique Related to Fault Arcing Detection
Zhang Jing
2015(12): 20-21. DOI: 10.13882/j.cnki.ncdqh.2015.12.007
Abstract PDF
Implement of Area Protection Control System Scheme
Zhao Lu, Wang Youxin, Liu Ting
2015(12): 22-24. DOI: 10.13882/j.cnki.ncdqh.2015.12.008
Abstract PDF
Testing and Common Problem Analyses of 220 kV Optical Fiber Longitudinal Current Differential Protections
Chen Jinlong, Yang Jianming
2015(12): 25-26. DOI: 10.13882/j.cnki.ncdqh.2015.12.009
Abstract PDF
Reason Analysis of Equipment Clamp Burning in 35 kV Guanma Line and Chonggao Branch Line
Zhang Hengwu, Li Yong
2015(12): 27-28. DOI: 10.13882/j.cnki.ncdqh.2015.12.010
Abstract PDF
Back Up Measures of Reserve Power Source Automatic Connection Device Failure in Coming Line in Substation
Qi Bo, Li Chunqing, Jin Hongtao
2015(12): 29-29. DOI: 10.13882/j.cnki.ncdqh.2015.12.011
Abstract PDF
Locking Scheme Related to Prevent Miss Operation for Pole-mounted Switch
Liang Ji, Huang Jianlin, Liu Guoyong
2015(12): 30-31. DOI: 10.13882/j.cnki.ncdqh.2015.12.012
Abstract PDF
Full Process Management and Control Tool with Province – region Integration for Relaying Protection
Zhao Ping, Xu Lingjiang, Zheng Yuande, Pan Lingchun
2015(12): 32-33. DOI: 10.13882/j.cnki.ncdqh.2015.12.013
Abstract PDF
Systematical Construction and Related Technology for Integral Data Platform for Power Dispatching
Wang Yijun, Li Jun, Liu Mingdong, Zhao Xueming
2015(12): 34-35. DOI: 10.13882/j.cnki.ncdqh.2015.12.014
Abstract PDF
Critical Technology Related to Dispatching Operation in Intelligent Power Network
Duan Junpu, Zheng Shuangjie
2015(12): 36-37. DOI: 10.13882/j.cnki.ncdqh.2015.12.015
Abstract PDF
Acceptance and Management System of Photograph Recorded Eliminating Defect in Transmission Lines
Su Liangzhi, Qiao Feng
2015(12): 38-39. DOI: 10.13882/j.cnki.ncdqh.2015.12.016
Abstract PDF
Applied Scheme of Monitoring Platform of Operating and Maintenance Used in Power Paying Charge Termination
Fang Liang, Xiang Yuanqi, Che Xuan
2015(12): 40-42. DOI: 10.13882/j.cnki.ncdqh.2015.12.017
Abstract PDF
Cut Down Distribution Transformer Burning Rate
Zhu Chuanmeng, Zhou Hui
2015(12): 43-43. DOI: 10.13882/j.cnki.ncdqh.2015.12.018
Abstract PDF
Cut Down D.C. Earthing Fault Ratio in Substations
Bao Linghua, Li Xiangxiang, Liu Zhaoming, Li Yan
2015(12): 44-44. DOI: 10.13882/j.cnki.ncdqh.2015.12.019
Abstract PDF
To Increase Buchholz Relay Correct Operation Rate for Transformers
Zhang Xiaoming
2015(12): 45-46. DOI: 10.13882/j.cnki.ncdqh.2015.12.020
Abstract PDF
Analyses of Influence of Photovoltaic Power Generation Connecting into Network on Power System Voltage Stability
Xie Yu, Zeng Jie, Chen Xiaoke, Xu Xiaogang
2015(12): 47-48. DOI: 10.13882/j.cnki.ncdqh.2015.12.021
Abstract PDF
Control Tactics of Inverter of Photovoltaic Power Generation Connecting into Network and Active Integrated Filter
Hu Jinxiu, Guo Xiang
2015(12): 49-49. DOI: 10.13882/j.cnki.ncdqh.2015.12.022
Abstract PDF
Improved Algorithm with Photovoltaic Array Overall Maximum Power Point Tracking Under Partial Shadow
Dang Ke, Yan Dong, Yang Fulei, Yan Gangui
2015(12): 50-50. DOI: 10.13882/j.cnki.ncdqh.2015.12.023
Abstract PDF
Optimization Related to Intelligent Residual Current Operating Protector in Mountain Area
Ji Liming
2015(12): 51-52. DOI: 10.13882/j.cnki.ncdqh.2015.12.024
Abstract PDF
Protective Device Used for Hole, Cavity, and Ditch in Working Site
Sui Dongyan, Lu Wei, Zhou Qipeng
2015(12): 53-53. DOI: 10.13882/j.cnki.ncdqh.2015.12.025
Abstract PDF
Doors Mutual Locking Device Used for Middle Laying Switch Cabinet
Chen De, Lian Yifang, Ding Liang, Ru Huidong
2015(12): 54-54. DOI: 10.13882/j.cnki.ncdqh.2015.12.026
Abstract PDF
Digitized Checking Mode Used in Power Consumption
Zhou Tao, Zhang Zhousheng, Liu Junkai
2015(12): 55-55. DOI: 10.13882/j.cnki.ncdqh.2015.12.027
Abstract PDF
Four Step Diagnostics Method Including Acquisition, Operation and Maintenance for Power Line Carrier
Wang Bo, Qi Zhanyu
2015(12): 56-56. DOI: 10.13882/j.cnki.ncdqh.2015.12.028
Abstract PDF