Advanced Search

column
To Deepen Establishment, to Increase Quality and Efficiency, in Order to Make Efforts to Initiate Developed New Situation for Company
Tang Yiwen
2014(9): 5-6. DOI: 10.13882/j.cnki.ncdqh.2014.09.038
Abstract PDF
Application Related Fault Locating System in Emergency Repair for Lines
Tang Yiwen
2014(9): 7-9. DOI: 10.13882/j.cnki.ncdqh.2014.09.039
Abstract PDF
Load Calculation of Power Distribution Network Based on Time-sequence Database
Geng Xinhui, Zhang Jiaqi, Han Tao
2014(9): 10-11. DOI: 10.13882/j.cnki.ncdqh.2014.09.040
Abstract PDF
Practical Technologies of Static Safety Calibration in Large Power Network Dispatching Plan
Lv Pin, Lv Zhaojie
2014(9): 12-14. DOI: 10.13882/j.cnki.ncdqh.2014.09.041
Abstract PDF
Design and Optimization Related 110 kV Package Substation Schemes
Guo Xiaofang
2014(9): 15-16. DOI: 10.13882/j.cnki.ncdqh.2014.09.042
Abstract PDF
Problems and Resolution Related to Commissioning Acceptance for Intelligent Substations
Zhang Peng
2014(9): 17-18. DOI: 10.13882/j.cnki.ncdqh.2014.09.043
Abstract PDF
Moisture-proof Maintenance Related Outdoor Terminal Box in Qingxi Substation
Xie Fuqiang
2014(9): 19-20. DOI: 10.13882/j.cnki.ncdqh.2014.09.045
Abstract PDF
Practice and Application Related Lightning Prevention of Remote Power Copying kWh Reading System
Jiang Hongliang, Zhu Jun, Jia Zhencheng
2014(9): 21-23. DOI: 10.13882/j.cnki.ncdqh.2014.09.047
Abstract PDF
Treatment and Improving Measure of Missing Phase Fault in Communication Power Supply
Liang Sen, Li Zhi
2014(9): 24-25. DOI: 10.13882/j.cnki.ncdqh.2014.09.048
Abstract PDF
Aging Purging Test of 110 kV GIS Equipment in Site
Jing Gangliang
2014(9): 26-26. DOI: 10.13882/j.cnki.ncdqh.2014.09.049
Abstract PDF
Discharge Logical Perfective Scheme of Reserve Power Supply Automatic Throw-in Device in Light Lines
Li Chunliang
2014(9): 27-27. DOI: 10.13882/j.cnki.ncdqh.2014.09.050
Abstract PDF
Breaking Down Reason Analysis Related Composite Insulators in 110 kV Transmission Lines
Gao Mingxiang
2014(9): 28-28. DOI: 10.13882/j.cnki.ncdqh.2014.09.051
Abstract PDF
Reason Analysis of H.V. Fuse Frequent Blowout Faults in Voltage Transformers
Ma Lidong, Du Zhong
2014(9): 29-30. DOI: 10.13882/j.cnki.ncdqh.2014.09.052
Abstract PDF
Analysis and Treatment Related 110 kV Resonant Over-voltages
Gu Liqiang
2014(9): 31-32. DOI: 10.13882/j.cnki.ncdqh.2014.09.053
Abstract PDF
Burn-out Reason Analysis Related #1 Earthing Transformer in Yangxiong Mount in Qiubei County
Tan Yan, Tao Wenzhu, Wen Xing
2014(9): 33-34. DOI: 10.13882/j.cnki.ncdqh.2014.09.054
Abstract PDF
On-line Monitoring System Used in Pole-mounted Distribution Transformer Area
Yuan Xiaodong
2014(9): 35-36. DOI: 10.13882/j.cnki.ncdqh.2014.09.055
Abstract PDF
Application of User Information Service Cards in Power Systems
Wang Guojian, Cheng Baiyan, Zhao Yan
2014(9): 37-38. DOI: 10.13882/j.cnki.ncdqh.2014.09.056
Abstract PDF
Geographic Information Management Systems Used for Power Distribution
Peng Chunyu
2014(9): 39-40. DOI: 10.13882/j.cnki.ncdqh.2014.09.057
Abstract PDF
Central Copying kWh Meter Reading Scheme Used in Residential Area
Dong Yuan, Liang Weixing
2014(9): 41-41. DOI: 10.13882/j.cnki.ncdqh.2014.09.058
Abstract PDF
Leading Tackle-blocks of Cable Drum in 500 kV Cable Laying
Zhang Haisheng, Zhang Jingcheng, Huang Pai, Li Yan, Zhao Quanlai
2014(9): 42-43. DOI: 10.13882/j.cnki.ncdqh.2014.09.059
Abstract PDF
Increasing Schedule Measured in Field for Plane and Cross-sectional Diagrams
Zhu Qinggui, Han Qing, Wu Fengying, Xin Shouzhe, Li Jinbiao
2014(9): 44-45. DOI: 10.13882/j.cnki.ncdqh.2014.09.060
Abstract PDF
Composite Preventive Bird Trouble Device Used for 10 kV Overhead Distribution Lines
Li Hongwei, Lu Jin, Cao Jinshan, Fan Yanan
2014(9): 46-48. DOI: 10.13882/j.cnki.ncdqh.2014.09.061
Abstract PDF
Increasing Checking Efficiency of Fittings of Switchcabinet that Switch is Arranged in Middle Position
Liang Guiwen
2014(9): 49-50. DOI: 10.13882/j.cnki.ncdqh.2014.09.062
Abstract PDF
Economy Evaluation Related to Make Use of Waste Wind to Store Heat for Heating
Li Wei, Jiang Lu
2014(9): 51-53. DOI: 10.13882/j.cnki.ncdqh.2014.09.063
Abstract PDF
Fault and Treatment of SF6 Density Relay
Ren Baozhong, Zhang Jian, Zhang Zhonglei, Xie Yanbin, Li Zongjie
2014(9): 54-55. DOI: 10.13882/j.cnki.ncdqh.2014.09.064
Abstract PDF
A Technical Measure Used for Protect kWh Meter Transformers
Zhou Heping
2014(9): 56-57. DOI: 10.13882/j.cnki.ncdqh.2014.09.065
Abstract PDF
Thinking Related Equipment Cyclic Repair in Substation
Li Hanhua
2014(9): 58-58. DOI: 10.13882/j.cnki.ncdqh.2014.09.067
Abstract PDF
Application Related Ultraviolet Image in Electric Equipment Repairs
Shang Liang, Xu Cheng
2014(9): 59-59. DOI: 10.13882/j.cnki.ncdqh.2014.09.068
Abstract PDF
Measures Increasing 10 kV End Voltage for Distribution Lines
Meng Qinghe
2014(9): 60-60. DOI: 10.13882/j.cnki.ncdqh.2014.09.069
Abstract PDF
Simple Talking Related to Be Considered Essential Factors in Distribution Planning
Huang Jia, Liang Yong
2014(9): 61-61. DOI: 10.13882/j.cnki.ncdqh.2014.09.070
Abstract PDF
Some Experiences in Rural Village Power Network Management
Chai Yanhua, Zhang Zhenhui
2014(9): 62-62. DOI: 10.13882/j.cnki.ncdqh.2014.09.071
Abstract PDF