Advanced Search

column
To Serve to Peasant, Village and Agriculture in Order to Construct Strong Rural Village Power Network
Chen Guangxuan, Zhu Ting
2014(3): 5-6. DOI: 10.13882/j.cnki.ncdqh.2014.03.004
Abstract PDF
Constructing Mode of Intelligent Power Distribution Platform Region in Gaomi City
Li Mingsheng, Ren Shujie
2014(3): 7-8. DOI: 10.13882/j.cnki.ncdqh.2014.03.005
Abstract PDF
Power Distribution Platform Region Reconstruction of Business, Power Distribution and Dispatch Integration in Rural Village Power Network
Ren Shujie, Yang Chuanzhong, Yang Xichun
2014(3): 9-10. DOI: 10.13882/j.cnki.ncdqh.2014.03.006
Abstract PDF
Cooperation with Development of Energy Saving, Reducing Loss and Power Network Planning
Zhao Guangfeng, Zhu Xiubo, Tian Xin
2014(3): 11-14. DOI: 10.13882/j.cnki.ncdqh.2014.03.007
Abstract PDF
Main Station Related to Power Distribution Automation System in County Level
Wang Weiwei
2014(3): 15-17. DOI: 10.13882/j.cnki.ncdqh.2014.03.009
Abstract PDF
Whole Solvent Related to New Type Intelligent Power Distribution Platform Region
Shi Xiuli, Cheng Tiejun
2014(3): 18-20. DOI: 10.13882/j.cnki.ncdqh.2014.03.010
Abstract PDF
Problem and Solvent Appeared of Earthing Compensation and High-speed Arc-suppression System in Operating
He Junliang, Yang Xiaowei
2014(3): 21-22. DOI: 10.13882/j.cnki.ncdqh.2014.03.011
Abstract PDF
Practice and Testing of Fault Detecting Method for Submarine Cables
Zhang Yishuai
2014(3): 23-24. DOI: 10.13882/j.cnki.ncdqh.2014.03.001
Abstract PDF
Analysis Related to Metering Error Owing to Instrument Transformer Incorrect Wiring in LV Distribution Transformer Platform
Jia Haixia, Jia Yun
2014(3): 25-26. DOI: 10.13882/j.cnki.ncdqh.2014.03.012
Abstract PDF
Composite Fault Tripping Reason Analyzed Using Oscillograph
Huang Jianzhong
2014(3): 27-29. DOI: 10.13882/j.cnki.ncdqh.2014.03.013
Abstract PDF
Analysis and Preventive Measure Related to Frequent Tripping Problem of Two Step Residual Current Operating Protector in Rainy Weather
Wang Shanqing
2014(3): 30-31. DOI: 10.13882/j.cnki.ncdqh.2014.03.014
Abstract PDF
Inquiry of Reason Analysis and Correcting Measure Related to Transmission Line Pole and Tower Inclination
Gao Tao
2014(3): 32-34. DOI: 10.13882/j.cnki.ncdqh.2014.03.015
Abstract PDF
Application of Large Data in Power Supply Companies Belonging to County Level
Deng Chunyu, Guo Yang, Li Junni, Wang Boyi
2014(3): 35-36. DOI: 10.13882/j.cnki.ncdqh.2014.03.036
Abstract PDF
Storage Intelligent Management System in Power Supply Bureau
Jiang Nengming
2014(3): 37-38. DOI: 10.13882/j.cnki.ncdqh.2014.03.035
Abstract PDF
Implementing Method Related to Intelligent Payment
Huang Sixing
2014(3): 39-40. DOI: 10.13882/j.cnki.ncdqh.2014.03.017
Abstract PDF
Real-time Monitoring and Measuring System for Active Power Unbalance Rate in 10 kV Bus
Meng Zhaoxing, Liang Haibin
2014(3): 41-42. DOI: 10.13882/j.cnki.ncdqh.2014.03.018
Abstract PDF
Dispatch Automation System Based on District and County Integration of Remote Terminal Switching on Type
Ma Yan, Wang Xinjian
2014(3): 43-44. DOI: 10.13882/j.cnki.ncdqh.2014.03.019
Abstract PDF
Supervisory Control System Related to Power Environment in Substations
Chai Yinquan
2014(3): 45-47. DOI: 10.13882/j.cnki.ncdqh.2014.03.020
Abstract PDF
Rise of Outage Plan Enforcement Rate
Zhang Xinghua
2014(3): 48-48. DOI: 10.13882/j.cnki.ncdqh.2014.03.021
Abstract PDF
Simple and Easy Machine Used in Conductor Paying-out
Sun Yi, Liu Haifeng, Wu Hengchao, Ling Weirong, Lu Xiaolong
2014(3): 49-49. DOI: 10.13882/j.cnki.ncdqh.2014.03.022
Abstract PDF
Electric Equipment Reconstruction Related to Zhaoshandu Water Power Plant
Liu Hao
2014(3): 50-51. DOI: 10.13882/j.cnki.ncdqh.2014.03.002
Abstract PDF
Reducing Drainage System of Solar Collector in 110 kV Substation
Xu Wenwen, Dang Lingping
2014(3): 52-53. DOI: 10.13882/j.cnki.ncdqh.2014.03.023
Abstract PDF
Contrast of Pre-stranded Wire Spacers of Two Bundled Conductors
Liu Yunfeng
2014(3): 54-54. DOI: 10.13882/j.cnki.ncdqh.2014.03.025
Abstract PDF
Research Related to No-load Three Phase Current Injection Device
Sun Xiaoming, Li Sen, Feng Yongjun, Wang Panxing
2014(3): 55-56. DOI: 10.13882/j.cnki.ncdqh.2014.03.026
Abstract PDF
A Movable Barn Used to Store Insulation Tools
Wu Xinwen, Shao Wenjin, Zhou Menglin
2014(3): 57-58. DOI: 10.13882/j.cnki.ncdqh.2014.03.027
Abstract PDF
How to Rise Percent of Pass Related to Switching Operation
Hong Weiguo
2014(3): 59-59. DOI: 10.13882/j.cnki.ncdqh.2014.03.028
Abstract PDF
Reconstructing Scheme Reducing Earthing Resistance in 110 kV Substation Earthing Network
Li Ming
2014(3): 60-60. DOI: 10.13882/j.cnki.ncdqh.2014.03.029
Abstract PDF
Solvent of Voltage Faults in Power Network
Yan Zilong, Li Bing
2014(3): 61-61. DOI: 10.13882/j.cnki.ncdqh.2014.03.030
Abstract PDF