Advanced Search

column
Trial Engineering of Business, Distribution and Dispatch in Penglai City Rural Power Network
Wang Tongyao, Wu Xinpeng
2013(3): 5-6. DOI: 10.13882/j.cnki.ncdqh.2013.03.002
Abstract PDF
Automatic Construction Related to New Type Power Distribution Network
Yang Zhendong
2013(3): 7-8. DOI: 10.13882/j.cnki.ncdqh.2013.03.003
Abstract PDF
Construction and Application of McWiLL Radio Special Network in Power Communication
Zhong Weishi
2013(3): 9-10. DOI: 10.13882/j.cnki.ncdqh.2013.03.005
Abstract PDF
Attend to Problems in Design of -connection for 110 kV Lines
Bai Weiguang, Guo Jing
2013(3): 11-12. DOI: 10.13882/j.cnki.ncdqh.2013.03.018
Abstract PDF
Construction of Power Networks of in Central Town
Zhu Mingzhu
2013(3): 13-14. DOI: 10.13882/j.cnki.ncdqh.2013.03.006
Abstract PDF
High Voltage Power Transmission Engineering in High Elevation Cold Area in Northeast China
Li Xiaoqi
2013(3): 15-17. DOI: 10.13882/j.cnki.ncdqh.2013.03.019
Abstract PDF
Induced Overvoltage Withstanding Test Method Related to Optimized Electromagnetic Voltage Transformers
Zhan Aidong, Liu Tiecheng, Zhang Shifeng, Zhu Zhipeng
2013(3): 18-20. DOI: 10.13882/j.cnki.ncdqh.2013.03.020
Abstract PDF
Fault Inspection and Treatment Related to Current Transformer Secondary
Ying Dongqin, Peng Shuming
2013(3): 21-21. DOI: 10.13882/j.cnki.ncdqh.2013.03.021
Abstract PDF
Fault Removing Method Related to High Frequency Protection
Xia Zhenzhi, He Lianke
2013(3): 22-23. DOI: 10.13882/j.cnki.ncdqh.2013.03.022
Abstract PDF
A Special Type 110 kV Reserve Power Supply Automatic Put in to Operation Device
Sun Zhihui
2013(3): 24-25. DOI: 10.13882/j.cnki.ncdqh.2013.03.008
Abstract PDF
Measure Restraining Residual Current Protective Device Malfunction and Miss Operation
Wang Qing
2013(3): 26-27. DOI: 10.13882/j.cnki.ncdqh.2013.03.023
Abstract PDF
Typical Fault Analysis Related to Power Distribution Transformers
Zhang Limin, Zhang Yanyan, Yu Xijuan, Hang Yang, Yuan Qingfang, Zhang Zhixin
2013(3): 28-29. DOI: 10.13882/j.cnki.ncdqh.2013.03.024
Abstract PDF
Reason Analysis Related to Differential Protection Operation When Main Transformer Put into Operation
Wang Yonghui
2013(3): 30-31. DOI: 10.13882/j.cnki.ncdqh.2013.03.025
Abstract PDF
Fault Analysis Related to Protection Over-step Tripping Due to Lightning Stroke
Wang Wei
2013(3): 32-33. DOI: 10.13882/j.cnki.ncdqh.2013.03.026
Abstract PDF
Analysis Related to Metering Device Fault Due to Small-sized Harmonic Source
Sun Kun, Yang Li
2013(3): 34-34. DOI: 10.13882/j.cnki.ncdqh.2013.03.027
Abstract PDF
Automatic Equipment of Power System Communication and its Topologic Management
Cui Li
2013(3): 35-36. DOI: 10.13882/j.cnki.ncdqh.2013.03.028
Abstract PDF
Solvent Scheme Related to Power Distribution Automatic Technology in Rural Village Power Network
Wu Dongfa
2013(3): 37-38. DOI: 10.13882/j.cnki.ncdqh.2013.03.010
Abstract PDF
Operating and Maintenance Related to Reactive Voltage Control System
Yuan Yingli
2013(3): 39-40. DOI: 10.13882/j.cnki.ncdqh.2013.03.011
Abstract PDF
Individual Termination in Substations Based on Andriod System
Ge Huan, Zou Runhuan
2013(3): 41-42. DOI: 10.13882/j.cnki.ncdqh.2013.03.029
Abstract PDF
Passive Wireless Temperature Monitoring System for 10 kV Switching Place
Gao Yongkuan, Cao Haidong
2013(3): 43-45. DOI: 10.13882/j.cnki.ncdqh.2013.03.012
Abstract PDF
Reducing Fault Patrol Time of 10 kV Lines in Chashan Place
Yu Hua
2013(3): 46-47. DOI: 10.13882/j.cnki.ncdqh.2013.03.030
Abstract PDF
Reducing Failure Rate Related to OA System
Qiao Qiufeng, Chao Yuefeng
2013(3): 48-48. DOI: 10.13882/j.cnki.ncdqh.2013.03.013
Abstract PDF
Raising Power Supply Timely Rate Related to Power Cables -connection
Wang Laicheng
2013(3): 49-50. DOI: 10.13882/j.cnki.ncdqh.2013.03.031
Abstract PDF
Application and Common Fault Treatment of KZL-2 Type Exciting Device in Small-sized Hydro Power Station
Zhou Zhongsheng
2013(3): 51-52. DOI: 10.13882/j.cnki.ncdqh.2013.03.016
Abstract PDF
Solar Energy Photovoltaic Power Generating Controller Design Based on CPLD
Wang Anchun
2013(3): 53-54. DOI: 10.13882/j.cnki.ncdqh.2013.03.032
Abstract PDF
Electric Automatic Technology and Application in Hydro Power Station
Xu Junsheng
2013(3): 55-56. DOI: 10.13882/j.cnki.ncdqh.2013.03.017
Abstract PDF
New Type Cutting Pliers Used to Overhead Insulating Conductor
Yan Xiaodong
2013(3): 57-57. DOI: 10.13882/j.cnki.ncdqh.2013.03.034
Abstract PDF
Principle Drawing Up Site Inspection Planning of Watt-hour Meters
Bu Zhiwen
2013(3): 60-60. DOI: 10.13882/j.cnki.ncdqh.2013.03.037
Abstract PDF
Line Loss Management Related to Rural Village Power Network
Fang Jishen
2013(3): 61-61. DOI: 10.13882/j.cnki.ncdqh.2013.03.038
Abstract PDF