Advanced Search

column
Reliability Analysis Related to 35 kV Power Network Configurations
Gao Chuanli
2013(12): 5-6. DOI: 10.13882/j.cnki.ncdqh.2013.12.013
Abstract PDF
Converting Supply Related to 10 kV Loads During Substation Reconstruction
Ma Xiaojun
2013(12): 7-8. DOI: 10.13882/j.cnki.ncdqh.2013.12.014
Abstract PDF
Treatment of Karst Cave and Soil Cave and Design Analysis of Foundation Scheme in Substation
Cao Yiyou
2013(12): 9-10. DOI: 10.13882/j.cnki.ncdqh.2013.12.012
Abstract PDF
Applications of Self-adapting Reclosing in UHV Transmission Line with Double Circuits in A Tower
Peng Hua, Luo Keyu, Zhang Yuewen, Zhang Daonong, Zhang Jianhua
2013(12): 11-12. DOI: 10.13882/j.cnki.ncdqh.2013.12.004
Abstract PDF
Temporary Power Supply Mode Faced with Problem and Solution During Substation Reconstruction
Lv Zongyong, Jiang Qingjun
2013(12): 13-14, 23. DOI: 10.13882/j.cnki.ncdqh.2013.12.015
Abstract PDF
Function Improvement of LV Reserve Power Source Automatic Connection Device in Dual Power Supply Customers
Ning Lili
2013(12): 15-16. DOI: 10.13882/j.cnki.ncdqh.2013.12.005
Abstract PDF
Application Related to Modularized Management in Relaying Protection Reconstruction
Bai Feng, Yang Jie
2013(12): 17-18. DOI: 10.13882/j.cnki.ncdqh.2013.12.016
Abstract PDF
Analyses of CosmoPolis New Type Road Lighting System Testing
Zhang Yunpeng
2013(12): 19-20. DOI: 10.13882/j.cnki.ncdqh.2013.12.017
Abstract PDF
Operating and Maintenance of Fiber Optic Cables in Rural Village Power System
Fan Yinwu
2013(12): 23-23. DOI: 10.13882/j.cnki.ncdqh.2013.12.019
Abstract PDF
Measures Reducing 10 kV Line Fault Trip-out Rate
Xie Yi, Lin Runjie
2013(12): 24-25. DOI: 10.13882/j.cnki.ncdqh.2013.12.020
Abstract PDF
Fault Analyses of 10 kV Outgoing Line Protections Rejecting Operating
Zheng Jiewen
2013(12): 26-27. DOI: 10.13882/j.cnki.ncdqh.2013.12.021
Abstract PDF
Application of Management System for Power Loads in Power Distribution Network
Kong Xianju, Di Yinsheng, Zhou Yuhong, Kong Qingze
2013(12): 28-29. DOI: 10.13882/j.cnki.ncdqh.2013.12.022
Abstract PDF
Constructions of MV Power Distribution Communication Network EPON System
Sun Xian, Gong Xiaoli, Liu Peng
2013(12): 30-31. DOI: 10.13882/j.cnki.ncdqh.2013.12.007
Abstract PDF
Networking Scheme Related to MV and LV Power Distribution Communication in County Region
Yan Bilian, Luo Hongling
2013(12): 32-33. DOI: 10.13882/j.cnki.ncdqh.2013.12.008
Abstract PDF
Practical Type Power Distribution Automation Construction Schemes in County Level
Liu Wenye, Yang Honglei, Wang Jinyu, Song Qipeng
2013(12): 34-35. DOI: 10.13882/j.cnki.ncdqh.2013.12.009
Abstract PDF
Topology Tinctorial Function of 10 kV Power Distribution Network Interconnecting Line
Xie Hua
2013(12): 36-37. DOI: 10.13882/j.cnki.ncdqh.2013.12.023
Abstract PDF
Intelligent Platform Area Based on Power Distribution Transformer Monitor Systems
Liu Haifeng, Liu Liming
2013(12): 38-39. DOI: 10.13882/j.cnki.ncdqh.2013.12.010
Abstract PDF
Real Time Report System Based on OPEN3000 Data Base and Electric Energy Quantity Data Interface
You Zhenqi, Hu Yin
2013(12): 40-41. DOI: 10.13882/j.cnki.ncdqh.2013.12.011
Abstract PDF
Intelligent Monitor Systems Related to Substation Operating Environment
Yan Jiaren
2013(12): 42-43. DOI: 10.13882/j.cnki.ncdqh.2013.12.024
Abstract PDF
Portable Displacing Device Used for Overhead Conductors
Wang Li, Zhao Wei
2013(12): 44-44. DOI: 10.13882/j.cnki.ncdqh.2013.12.025
Abstract PDF
To Reduce Line Loss Rate for 35 kV Power Networks
Shen Chengxin, Zhao Hong
2013(12): 45-46. DOI: 10.13882/j.cnki.ncdqh.2013.12.026
Abstract PDF
Protective System Preventive "Isolated Island" with Photovoltaic Generation Distributed Type
Zhou Xiaoning, Zhu Kaiyang, Xu Shigaung, Chen Yonghua
2013(12): 47-48. DOI: 10.13882/j.cnki.ncdqh.2013.12.027
Abstract PDF
Communication Management Technology with Distributed
Jiang Jing, Hang Han, Zhou Yefei
2013(12): 49-49. DOI: 10.13882/j.cnki.ncdqh.2013.12.028
Abstract PDF
Feasibility Analyses of Application of Pulse Charging in off-network Photovoltaic Generation Systems
Dang Ke, Cai Chengcheng, Yan Gangui
2013(12): 50-51. DOI: 10.13882/j.cnki.ncdqh.2013.12.029
Abstract PDF
Unified Planning Related to Water Resource in Middle and Small Rivers
Zhou Jieqing
2013(12): 52-54. DOI: 10.13882/j.cnki.ncdqh.2013.12.002
Abstract PDF
Supporting Special Device Used for HV Power Cables Tests
Li Chen
2013(12): 55-55. DOI: 10.13882/j.cnki.ncdqh.2013.12.030
Abstract PDF
On-line Oil Filtering Device for On-load Tap Changer in Transformers/,
Zhang Dongshun, Yan Qing
2013(12): 56-57. DOI: 10.13882/j.cnki.ncdqh.2013.12.031
Abstract PDF
How to Prevent Miss-operation of Residual Current Protection Device in Rural Village Power Network
Liu Hongliang
2013(12): 58-58. DOI: 10.13882/j.cnki.ncdqh.2013.12.033
Abstract PDF
A Few Thinking Related to Construct Province, Region, and County Integrated Power Network Equipment Repair Management System
Zhao Jianwen
2013(12): 59-59. DOI: 10.13882/j.cnki.ncdqh.2013.12.034
Abstract PDF