Advanced Search

column
Integral Administrating Related to''Low Voltage''in Rural Villages
Liu Yadong
2012(8): 5-6. DOI: 10.13882/j.cnki.ncdqh.2012.08.013
Abstract PDF
Single/Three Phase Mixed Power Supply Mode
Lv Fangliang
2012(8): 7-9. DOI: 10.13882/j.cnki.ncdqh.2012.08.014
Abstract PDF
New Writings Plotted on by Science and Technology
Zhao Yang, Yu Congli, Zeng Juan
2012(8): 10-12. DOI: 10.13882/j.cnki.ncdqh.2012.08.002
Abstract PDF
Multi-Service Transfer Platform and Its Application in County Power Supply Enterprise
Chen Ke
2012(8): 13-15. DOI: 10.13882/j.cnki.ncdqh.2012.08.015
Abstract PDF
Data Disaster Recovery Systern
Zha Qing’an, Su Mao
2012(8): 16-16. DOI: 10.13882/j.cnki.ncdqh.2012.08.003
Abstract PDF
Digitized Resolving Scheme Related to 110 kV Substations
Huang Huasheng, Huang Zixi
2012(8): 17-18. DOI: 10.13882/j.cnki.ncdqh.2012.08.004
Abstract PDF
Set-up Voltage Measures Related to Extra-long Distance Power Supply for 35 kV Transmission Lines
Zhang Li, Lu Guohua, Jia Haixia
2012(8): 19-20. DOI: 10.13882/j.cnki.ncdqh.2012.08.016
Abstract PDF
Application Related to LED in Road Lightings
Zhang Yunpeng
2012(8): 21-22. DOI: 10.13882/j.cnki.ncdqh.2012.08.017
Abstract PDF
Method Reducing Testing Drift in HV Equipment tgδ Test
Huang Weijian
2012(8): 23-24. DOI: 10.13882/j.cnki.ncdqh.2012.08.018
Abstract PDF
Diagnostic Method Related to Transformer Insulations
Hu Yongqiang
2012(8): 25-26. DOI: 10.13882/j.cnki.ncdqh.2012.08.019
Abstract PDF
Detecting Principle Related to Interface Switch Earthing for Customers
Li Qiang
2012(8): 27-28. DOI: 10.13882/j.cnki.ncdqh.2012.08.020
Abstract PDF
Dynamic Compensation Filter Based on Pure Form Method
Guan Shengli, Hong Guang, Jian Li, Li Zengbao
2012(8): 29-30. DOI: 10.13882/j.cnki.ncdqh.2012.08.005
Abstract PDF
Reason Analysis Related to 110 kV Transformer Bushing Faults
Li Gang, Wang Can
2012(8): 31-32. DOI: 10.13882/j.cnki.ncdqh.2012.08.021
Abstract PDF
Pollution Flashover Fault Analysis and Preventing Measures in Jiangqiao Substation
Wu Zhen
2012(8): 33-33. DOI: 10.13882/j.cnki.ncdqh.2012.08.022
Abstract PDF
Standby Automatic Putting into Operation Event Resulted in Restart Paralleling Device Outage
Zou Ge, Zhu Yuxi
2012(8): 34-35. DOI: 10.13882/j.cnki.ncdqh.2012.08.006
Abstract PDF
Measure ofOverstep Tripping in Industry and Enterprise Power Supply System
Luo Wei, Wen Shaolin, Zhu Bo
2012(8): 36-37. DOI: 10.13882/j.cnki.ncdqh.2012.08.023
Abstract PDF
Analysis and Preventive Serialization ofTypical Examples Breaking Rule and Regulation in Rurgl Village Power System(8)
Liu Bingjiang, Shi Ying
2012(8): 38-39. DOI: 10.13882/j.cnki.ncdqh.2012.08.024
Abstract PDF
Detecting Auxiliary System Related to Power Distribution Network Faults
Yang Ruhui, Huang Weiqiong, Yang Gengjie
2012(8): 40-41. DOI: 10.13882/j.cnki.ncdqh.2012.08.007
Abstract PDF
Remote Intelligent Patrol and Alarm Systems Related to Power Distribution Rooms
Kang Wenwen, Xu Xiaohui, Yang Hua, Ni Li
2012(8): 42-43. DOI: 10.13882/j.cnki.ncdqh.2012.08.008
Abstract PDF
Emergency Detecting System Related to Flood Prevention in Underground Station for Power Distribution Network
Wu Tianqi
2012(8): 44-46. DOI: 10.13882/j.cnki.ncdqh.2012.08.009
Abstract PDF
Reducing Received Error Rate for Fore Report Papers in Dispatching Automatic System
Shi Jifang, Jiang Tao
2012(8): 47-48. DOI: 10.13882/j.cnki.ncdqh.2012.08.025
Abstract PDF
Intelligent Control System to Prevent Condenses Dew in New Type Switchgears
Wang Jianping, Li Shoupeng
2012(8): 47-48. DOI: 10.13882/j.cnki.ncdqh.2012.08.010
Abstract PDF
How to Further Reduce Water Consumption in Wujin Gorge Hydropower Station
Du Chuang
2012(8): 51-52. DOI: 10.13882/j.cnki.ncdqh.2012.08.012
Abstract PDF
Research Closing into System Related to Photovoltaic Generation Demonstrating Project
Li Lingrui, Gao Xiaojing, Wang Wei
2012(8): 53-54. DOI: 10.13882/j.cnki.ncdqh.2012.08.026
Abstract PDF
Calculating Method Related to Line.10ss Rate for Power Distribution Line with Small—size Hydro Power Synchroniz—ing and Closing
Zhao Jingli, Song Baoyan
2012(8): 55-56. DOI: 10.13882/j.cnki.ncdqh.2012.08.027
Abstract PDF
Application of Maintenance.free Iron Lithium Phosphate Battery DC Panels in Substations
Peng Jiao, Xie Dihui, Pan Mingbo
2012(8): 57-58. DOI: 10.13882/j.cnki.ncdqh.2012.08.029
Abstract PDF
Some Key Technical Problems Related to New Power Distribution Room Construction
Miao Xu
2012(8): 61-61. DOI: 10.13882/j.cnki.ncdqh.2012.08.031
Abstract PDF
Zongyang Power Supply Company: "Low Voltage"is Administered Through Five Measures
Ye Hui
2012(8): 62-62. DOI: 10.13882/j.cnki.ncdqh.2012.08.011
Abstract
Five Barriers Shall be Held on Rural Village Power Distribution Transformer Management
Liu Guijun
2012(8): 62-62. DOI: 10.13882/j.cnki.ncdqh.2012.08.032
Abstract PDF