Advanced Search

column
Optimizing Tap Management to Distribution Transformers Based on Voltage Drop Theoretical Calculation
Zhan Tao, Xu Chuamin, Gao Fei
2012(6): 5-7. DOI: 10.13882/j.cnki.ncdqh.2012.06.011
Abstract PDF
Reasons and Solutions of"Low Voltage"
Yang Zhihong, Li Mingwei
2012(6): 8-8. DOI: 10.13882/j.cnki.ncdqh.2012.06.012
Abstract PDF
Pay ARention to"Four tnsistences" to Promote Enterprise Developmentf
Liu Meiyu, Lan Xiaowei, Wang Pingping
2012(6): 9-10. DOI: 10.13882/j.cnki.ncdqh.2012.06.003
Abstract PDF
Testing Method Under Lead Wire Reserving Related to 500 kV Surge Arrestors
Lin Defeng, Xu Shuang
2012(6): 11-12. DOI: 10.13882/j.cnki.ncdqh.2012.06.013
Abstract PDF
Reduce Contacts Heating Rate for Equipment
Yan Yong, , Tian Xiao
2012(6): 13-15. DOI: 10.13882/j.cnki.ncdqh.2012.06.004
Abstract PDF
Related to Perspective and Short-term Load Forecast
Cheen Binfa, Lin Kai, Li Qiang
2012(6): 16-18. DOI: 10.13882/j.cnki.ncdqh.2012.06.014
Abstract PDF
Networking Mode and Constructing Principle Related to Distribution Power Network in Haining City
Yang Qiyong
2012(6): 19-20. DOI: 10.13882/j.cnki.ncdqh.2012.06.015
Abstract PDF
Developing Planning Related to 1 10 kV Cable Networks for Shunyi Region
Yang Jianling, Zhang Hongjun
2012(6): 21-22. DOI: 10.13882/j.cnki.ncdqh.2012.06.016
Abstract PDF
Regulating and Testing Scheme of Electric Equipment for 10 kV Residential Areas
Wu Yi
2012(6): 23-24. DOI: 10.13882/j.cnki.ncdqh.2012.06.017
Abstract PDF
Diagnostic Method Related to Solid Insulation Ageing for Transformers
Sun Jie
2012(6): 25-26. DOI: 10.13882/j.cnki.ncdqh.2012.06.018
Abstract PDF
Fault Analysis Related to Higb Back-up Relaying Operation for Transformers
Wang Lianfeng, Qi Bo
2012(6): 27-27. DOI: 10.13882/j.cnki.ncdqh.2012.06.019
Abstract PDF
Reflect on Due to a Virtual Grounding Event
Yuan Hui
2012(6): 28-28. DOI: 10.13882/j.cnki.ncdqh.2012.06.020
Abstract PDF
Practical Mode of Voltage Step-down Mixed Operation for Long Distance and Various Voltage Level Cables
Zhao Zuobin, Zhang Kejie
2012(6): 29-30. DOI: 10.13882/j.cnki.ncdqh.2012.06.021
Abstract PDF
Analysis and Preventive Serialization ofTypical Examples Breaking Rule and Regulation in Rural Village Power Sys—tem(6)
Liu Bingjiang, Xu Fuqiang
2012(6): 31-32. DOI: 10.13882/j.cnki.ncdqh.2012.06.001
Abstract PDF
High Level Application Related to Automatic Systems in Digitalized Substations
Weng Shasha, Yun Tianji
2012(6): 33-35. DOI: 10.13882/j.cnki.ncdqh.2012.06.005
Abstract PDF
Relaying Protection Remote Management and Fault Information Dynamic Web Page Issue System
Yang Xiaoyan
2012(6): 36-37. DOI: 10.13882/j.cnki.ncdqh.2012.06.006
Abstract PDF
Dispatch Centralization and its Technical Supporting System for Power Distribution Network
Lu Jinpei
2012(6): 38-40. DOI: 10.13882/j.cnki.ncdqh.2012.06.022
Abstract PDF
Micro-power Networks Teehniques
Yin Zhaowu, Zhang Limei
2012(6): 41-42. DOI: 10.13882/j.cnki.ncdqh.2012.06.023
Abstract PDF
Intelligent Auxiliary Systems for Standardizing Work in Rural Village Power System Fields
Yu Guanzuo
2012(6): 43-44. DOI: 10.13882/j.cnki.ncdqh.2012.06.024
Abstract PDF
Pantograph Type Testing Wiring Device in Above Ground
Li Changing, Zhou Ziming, An Pingyue
2012(6): 45-46. DOI: 10.13882/j.cnki.ncdqh.2012.06.025
Abstract PDF
Increasing Replacing Rate of Wiring end Cap for 35 kV Outdoor Cut—out
Zhao Liping, Wang Meng, Zhang Hongxia, Liu Zhen
2012(6): 47-48. DOI: 10.13882/j.cnki.ncdqh.2012.06.026
Abstract PDF
Research of Protective Scheme Related to Photovoltaic Power Distribution Systems from Roof Multi-point Access
Hao Yi, Du Xin, Zhang Enling
2012(6): 49-51. DOI: 10.13882/j.cnki.ncdqh.2012.06.027
Abstract PDF
Electric Energy Quality Analysis Related to Distributed Photovoltaic Generating Power Synchronizing and Closing
Feng Yuan
2012(6): 52-53. DOI: 10.13882/j.cnki.ncdqh.2012.06.028
Abstract PDF
Parallel Research Related to Natural River Course and Artificial Tail Water Course in Foziling Pumped-storage Power Station
Qiao Wanxia, Zhou Jieqing
2012(6): 54-55. DOI: 10.13882/j.cnki.ncdqh.2012.06.010
Abstract PDF
Small Innovations in Pingxiang Power Supply Company
Liu Chunfeng
2012(6): 56-60. DOI: 10.13882/j.cnki.ncdqh.2012.06.007
Abstract PDF
New Methods that Remotely Restart Power Source for Communication Management Device
Teng Xiaohui, Hao Jianjun, Wang Zhiqiang, Ai Yengfu, Li Bingguang
2012(6): 61-61. DOI: 10.13882/j.cnki.ncdqh.2012.06.008
Abstract PDF
Installing Requirements for SF6 Insulated Switchgear Construction
Zhuang Longxi, Chen Jianjun
2012(6): 62-62.
Abstract PDF
"Five Combinations"to Assure Loss Reduction and Benefit Increment in Qingyang Power Bureau
Wang Na
2012(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2012.06.029
Abstract PDF