Advanced Search

column
First Selection of "Low Voltage" Administration Reactive Power Optimizing Compensation
Wang Yong
2012(1): 5-6. DOI: 10.13882/j.cnki.ncdqh.2012.01.011
Abstract PDF
Application of Unit Device of Automatic Voltage Regulation for SVR Feeders
Zhang Bin
2012(1): 7-8. DOI: 10.13882/j.cnki.ncdqh.2012.s1.003
Abstract PDF
Innovation and Practice of Science and Technology for Power Supply Enterprise in County
Qiu Feng, Shao Jun
2012(1): 9-10. DOI: 10.13882/j.cnki.ncdqh.2012.01.004
Abstract PDF
Application of Load Management System in Kuanshan
Cheng Lun, Feng Di
2012(1): 11-12. DOI: 10.13882/j.cnki.ncdqh.2012.01.013
Abstract PDF
Application of Sequence Control in Substations
Wei Fuqing, Bai Minwei
2012(1): 13-14. DOI: 10.13882/j.cnki.ncdqh.2012.01.005
Abstract PDF
Planning Design and Installation for Power Supply Area from 10 kV Transformers Mounted in Pole
Yin Haifeng, Ma Dongshan
2012(1): 15-16. DOI: 10.13882/j.cnki.ncdqh.2012.01.014
Abstract PDF
Reconstructing 1l0 kV Network Structure to Increase Transmission Capacity for Regional Power Network
Zheng Chanyan
2012(1): 17-18. DOI: 10.13882/j.cnki.ncdqh.2012.01.015
Abstract PDF
New Fixed Method for 800 mm Cross Arm
Jiang Kebin
2012(1): 19-20. DOI: 10.13882/j.cnki.ncdqh.2012.01.016
Abstract PDF
Fault Analysis of Microcomputer Protection Device
Gu Yabing
2012(1): 20-20. DOI: 10.13882/j.cnki.ncdqh.2012.01.017
Abstract PDF
Reason Analysis of Relaying Protection Malfunction for Interconnection Circuit Breaker
Huang Jianzhong
2012(1): 21-22. DOI: 10.13882/j.cnki.ncdqh.2012.01.018
Abstract PDF
Increasing Closing Operation Reliability in Unattended Substation
Wen Xinye, Zheng Yunsong, Jin Jianxin
2012(1): 23-24. DOI: 10.13882/j.cnki.ncdqh.2012.01.019
Abstract PDF
Inquiry of Online Monitoring for Metal-oxide Lightning Arrester
Zhang Xinran, An Hongle
2012(1): 25-26. DOI: 10.13882/j.cnki.ncdqh.2012.01.020
Abstract PDF
Replacement and Reconstruction Mode for l0 kV Feeder Switch-cubicle
Song Dawei
2012(1): 27-27. DOI: 10.13882/j.cnki.ncdqh.2012.01.021
Abstract PDF
Search and Analysis of Fault Point for No-voltage Fault in Buses
Li Huitao, Chen Guohong
2012(1): 28-29. DOI: 10.13882/j.cnki.ncdqh.2012.01.022
Abstract PDF
Fault Analysis of Line Tripping Due to Reactor Fault
Yu Bo, Sun Weihong, Peng Lin, Guo Bixiang
2012(1): 30-31. DOI: 10.13882/j.cnki.ncdqh.2012.01.023
Abstract PDF
Reason Analysis and Preventive Measure for lO kV Large-current Switch-cubicle Fault
Li Wenjia
2012(1): 32-33. DOI: 10.13882/j.cnki.ncdqh.2012.01.024
Abstract PDF
Risk Estimation Method for Power Distribution Network Operation in Fuoshan City
Lu Jinpei
2012(1): 34-35. DOI: 10.13882/j.cnki.ncdqh.2012.01.025
Abstract PDF
Analysis and Preventive Serialization of Typical Examples Breaking Rules and Regulation in Rural Village Power System(Ⅰ)
Liu Bingjiang
2012(1): 36-37. DOI: 10.13882/j.cnki.ncdqh.2012.01.002
Abstract PDF
Digitizing Secondary Design for ll0 kV Substations
Feng Xia
2012(1): 38-39. DOI: 10.13882/j.cnki.ncdqh.2012.01.006
Abstract PDF
Management of Information Network in Power Supply Enterprise Belonging to County Level
Yu Jianfu, Qiu Kai
2012(1): 40-41. DOI: 10.13882/j.cnki.ncdqh.2012.01.007
Abstract PDF
Application of New Technology in Transmission Line Design
Zhang Wentao
2012(1): 42-43. DOI: 10.13882/j.cnki.ncdqh.2012.01.026
Abstract PDF
Remote Online Condition Monitoring System for HV Transmission Line
Cheng Jiangzhou, Feng Zhenghua, Li Cheng
2012(1): 44-45. DOI: 10.13882/j.cnki.ncdqh.2012.01.008
Abstract PDF
Constructionof Dispatch and Control Integralization in Rural Village Power Network
Da Qunfeng
2012(1): 46-47. DOI: 10.13882/j.cnki.ncdqh.2012.01.009
Abstract PDF
Reducing Dropping Times of Pin of Driving Lever for Switchgear
Wang Qingdong
2012(1): 48-49. DOI: 10.13882/j.cnki.ncdqh.2012.01.027
Abstract PDF
Cubical Protective Device of Cable Ditch for Visual Type Substation
Fan Haiji, Wang Li
2012(1): 50-50. DOI: 10.13882/j.cnki.ncdqh.2012.01.028
Abstract PDF
Investigation of Connecting to Secondary Circuit Design for Afterheat Generating Set in Llaoyang Range
Pei Zihui, Dou Wenlei, Zeng Liheng
2012(1): 51-52. DOI: 10.13882/j.cnki.ncdqh.2012.01.029
Abstract PDF
Influence of Synchronizing and Closing Photovoltaic Generating System on Power Flow of Voltage Distribution in Distribution Network
Zhang Shitao, Zhao Di
2012(1): 53-54. DOI: 10.13882/j.cnki.ncdqh.2012.01.030
Abstract PDF
Development of Clipper for Trees Under Distribution Lines
Li Wenfu
2012(1): 55-56. DOI: 10.13882/j.cnki.ncdqh.2012.01.010
Abstract PDF
Advantages of Prestranded Type Damper
Li Guangming
2012(1): 56-56. DOI: 10.13882/j.cnki.ncdqh.2012.01.001
Abstract PDF
Test Questions of Written Examination for Business and Market Service Speciality(1)
2012(1): 57-60.
Abstract PDF