Analysis of "Low Voltage" Problem in Rural Village
Wang Jinli
2011(9): 5-6. DOI: 10.13882/j.cnki.ncdqh.2011.09.004
Abstract PDF
Analyzing and Calculating Voltage Drop for 10 kV Power Distribution Network Using Excel Analysis
Chen Xiping
2011(9): 7-8. DOI: 10.13882/j.cnki.ncdqh.2011.09.005
Abstract PDF
"Low Voltage" Renovation in Rural Village Area Supplied by Pole-mounted Distribution Transformers
Fu Yuhong, Hou Jianbin, Cai Jinding
2011(9): 9-10. DOI: 10.13882/j.cnki.ncdqh.2011.09.006
Abstract PDF
Power Supply for Changyi County: Founding Brilliant
Li Hengwen
2011(9): 11-12. DOI: 10.13882/j.cnki.ncdqh.2011.09.007
Abstract PDF
Intelligent Power Network Dispatch Center Based on Three-dimensional Visible
Ge Jian, Ming Xiaoxia
2011(9): 13-14. DOI: 10.13882/j.cnki.ncdqh.2011.09.008
Abstract PDF
Optimizing Compensation for 10 kV Reactive Powers
Liu Chengxiang, Jiang Guangyuan
2011(9): 15-15. DOI: 10.13882/j.cnki.ncdqh.2011.09.017
Abstract PDF
Several Recommendations to Implement Rural Village Power Network Escalation Reconstruction Engineering
Zhu Gang
2011(9): 16-17. DOI: 10.13882/j.cnki.ncdqh.2011.09.009
Abstract PDF
Management Problem for Rural Village Power Network Escalation Reconstruction Engineering
Liu Minghua
2011(9): 18-19. DOI: 10.13882/j.cnki.ncdqh.2011.09.010
Abstract PDF
Transmission Line Design in High Altitude and Cold Area
Sun Hongbo
2011(9): 20-21. DOI: 10.13882/j.cnki.ncdqh.2011.09.018
Abstract PDF
Disposal of Dielectric Loss Abnormality for Main Transformer Bushing
Rong Baodi
2011(9): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.09.019
Abstract PDF
Existent Problems and Countermeasures in Earthing System for Substation
Wang Fubo
2011(9): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.09.020
Abstract PDF
Practical Mode of Single Tripping Coil, Double-protection Arrangement
Zhou Yongjun, Liu Chao
2011(9): 26-26. DOI: 10.13882/j.cnki.ncdqh.2011.09.021
Abstract PDF
Attentive Matters in Course of Mounting and Dismounting for Surge Arrester
Li Xinglong, Wang Xiaoming, Zhang Yong
2011(9): 27-27. DOI: 10.13882/j.cnki.ncdqh.2011.09.022
Abstract PDF
Managing and Controlling Equipment for Safe Operation by Intelligent Patrol and Checking System
Li Mengxing, Pan Changyi
2011(9): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.09.001
Abstract PDF
Analysis of Line Loss Abnormality and Application of Managememt and Control Form Formalization
Zhao Guanjin
2011(9): 30-31. DOI: 10.13882/j.cnki.ncdqh.2011.09.023
Abstract PDF
Fire Prevention Equipment Management for 35 kV Substations
Zhang Hongchun, Li Weiquan, Zhang Xuefeng
2011(9): 32-33. DOI: 10.13882/j.cnki.ncdqh.2011.09.002
Abstract PDF
Voltage off Limit Due to Larger Load Fluctuation
Liu Xiao, Zhang Ling
2011(9): 34-35. DOI: 10.13882/j.cnki.ncdqh.2011.09.024
Abstract PDF
Fault Analysis of Frequent Starting for Fault Oscilloscope
Zhang Jingping, Wang Jianjie, Yang Bingtao, Ji Chunxiang
2011(9): 36-36. DOI: 10.13882/j.cnki.ncdqh.2011.09.025
Abstract PDF
Automatic Double System of Cluster Dispatch and Control
Lv Lei, Bai Yan, Wei Jie, Chen Kuang, Yin Jialin
2011(9): 37-38. DOI: 10.13882/j.cnki.ncdqh.2011.09.026
Abstract PDF
Correlative Application of Information in Power Supply Company
He Xiao, Chen Binfa, Luo Siping
2011(9): 39-40. DOI: 10.13882/j.cnki.ncdqh.2011.09.011
Abstract PDF
Observation System of Lightning Arrester for 35 kV Transmission Line
Wang Jinshui, Ma Ling, Wang Jianrong
2011(9): 41-42. DOI: 10.13882/j.cnki.ncdqh.2011.09.027
Abstract PDF
Coordinative Development of Global Intelligent Power Network Construction in New Stage
Charlton Adams W.
2011(9): 43-43, 45. DOI: 10.13882/j.cnki.ncdqh.2011.09.012
Abstract PDF
Fault Disposal of Communication System in Early Stage Integrated Automation Substation
Xu Yi
2011(9): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.09.028
Abstract PDF
Technical Scheme of Business and Marketing Intellectualization in Rural Power System
Ding Xiao
2011(9): 46-46. DOI: 10.13882/j.cnki.ncdqh.2011.09.013
Abstract PDF
Present Situation and Developing Trend of Preventing Incorrect Operation System in Central Control Station
Wang Tingting
2011(9): 47-48. DOI: 10.13882/j.cnki.ncdqh.2011.09.014
Abstract PDF
Reducing Voltage Transformer Fault Rate in Unattended Substation
Yuan Haiying
2011(9): 49-50. DOI: 10.13882/j.cnki.ncdqh.2011.09.029
Abstract PDF
Development of Analogical Circuit Breaker
Li Tao
2011(9): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.09.030
Abstract PDF
Engineering Replacing Fuel by Small Hydroelectric Power in Baiwang, Taihu County
Hong Qionglin, Zhao Zewang
2011(9): 53-54. DOI: 10.13882/j.cnki.ncdqh.2011.09.015
Abstract PDF
Preliminary Exploration about Line Loss Sharing in Small Hydroelectric Power Station
Zhang Wei
2011(9): 55-56. DOI: 10.13882/j.cnki.ncdqh.2011.09.016
Abstract PDF
Influence of Residual Heat and Residual Pressure on Power Network
Sun Kun
2011(9): 57-58. DOI: 10.13882/j.cnki.ncdqh.2011.09.031
Abstract PDF
Advantage and Constructed Main Point of Buried Wires
Chen Wei
2011(9): 58-58. DOI: 10.13882/j.cnki.ncdqh.2011.09.032
Abstract PDF
Escalton Reconstruction of Exciting Control Part for Synchronous Generator
Li Cheng, Yang Jiang, Fu Xiaochuan, Qiao Xingyu
2011(9): 59-60. DOI: 10.13882/j.cnki.ncdqh.2011.09.033
Abstract PDF
Phase Modulation-able Multiple Contact Connecting Box Without Climbing Pole and Outage
Zheng Yahui, Zheng Wenlin
2011(9): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.09.034
Abstract PDF
Attentive Matters in Replacement of Line Circuit-breaker by 220 kV by Pass Bus Switching Operation
Xu Luna, Xia Siming
2011(9): 62-62. DOI: 10.13882/j.cnki.ncdqh.2011.09.035