Advanced Search

column
Transformer Fitted with On-load Tap Changer
Xu Dongliang, Yang Qingwei, Ling Caihong, Chen Jing
2011(7): 5, 7. DOI: 10.13882/j.cnki.ncdqh.2011.07.013
Abstract PDF
Power Utilization Management for Staging off Low Voltage Peak Load in Rural Village
Yue Peishu, Yang Jian, Ge Cunhua
2011(7): 6-7. DOI: 10.13882/j.cnki.ncdqh.2011.07.003
Abstract PDF
To Constructing New Type Scientific and Technical Enterprise, to Service for Local Economic Development
Su Juan, Chen Zhen, Yu Yu
2011(7): 8-9. DOI: 10.13882/j.cnki.ncdqh.2011.07.004
Abstract PDF
Integrated System of Power Supply Service and Dispatch Management
Hu Aiqing, Lu Xuqing
2011(7): 10-11. DOI: 10.13882/j.cnki.ncdqh.2011.07.005
Abstract PDF
Navigational Service System for Intelligent Copying kWh Values
Shen Jiancheng
2011(7): 12-13, 15. DOI: 10.13882/j.cnki.ncdqh.2011.07.014
Abstract PDF
To Carry Forward Automatic Construction for Power Distribution Network
Qian Chengbing, Su Juan, Dong Zhiling
2011(7): 14-15. DOI: 10.13882/j.cnki.ncdqh.2011.07.015
Abstract PDF
Complete Power Supply Scheme of Charging Station for Electro-mobile
Sun Fuguo, Tian Jianshe
2011(7): 16-16. DOI: 10.13882/j.cnki.ncdqh.2011.07.016
Abstract PDF
Measuring Location of Pole and Tower Foundations for Transmission Lines
Yuan Cunbing
2011(7): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.07.017
Abstract PDF
To Raise Qualified Rate of Voltage, to Reducing Efficiently Power Network Loss
Zhu Lin
2011(7): 19-19. DOI: 10.13882/j.cnki.ncdqh.2011.07.018
Abstract PDF
Fault Analysis of Indicating Lamp Not Work after Circuit Breaker Closing
Hao Xiaohui, Sun Qi
2011(7): 20-21. DOI: 10.13882/j.cnki.ncdqh.2011.07.019
Abstract PDF
Fault Analysis and Disposal for Buchholz
Li Ying, Wang Guozhou
2011(7): 21-21. DOI: 10.13882/j.cnki.ncdqh.2011.07.020
Abstract PDF
Single Phase Earthing Fault of 10 kV Lines
Lin Wen, Cheng Zhibing
2011(7): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.07.021
Abstract PDF
Improvement of Not Passing Through Bus-tie Circuit Breaker Closing Block for Charging Protection
Wang Qing
2011(7): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.07.022
Abstract PDF
Revised Inquiry of Site Operating Regulation Modularization in Substation
Hu Yongqiang
2011(7): 26-27. DOI: 10.13882/j.cnki.ncdqh.2011.07.023
Abstract PDF
Reason Analysis of Large Amplitude Change of Gas Density for SF6 Instrument Transformer
Han Xiangfeng
2011(7): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.07.024
Abstract PDF
Reason Analysis of Protection Inserter Damage Due to Equipment Acceptance
Qi Mao
2011(7): 30, 32. DOI: 10.13882/j.cnki.ncdqh.2011.07.025
Abstract PDF
Miss Operation Analysis of Reserve Power Source Automatic Connection Device for 110 kV Inner-bridge Connection
Yang Junchao, Lian Jingbing
2011(7): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.07.006
Abstract PDF
Reason Analysis and Disposal for 35 kV Cable Fault
Song Xianfu
2011(7): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.07.026
Abstract PDF
Problems Due to Electrification of Surge Arrester in 10 kV Voltage Transformer Cabinet
Dong Zhengsen
2011(7): 35, 37. DOI: 10.13882/j.cnki.ncdqh.2011.07.027
Abstract PDF
A No-voltage Analysis for 35 kV Whole Substation
Huang Jianzhong
2011(7): 36-37. DOI: 10.13882/j.cnki.ncdqh.2011.07.028
Abstract PDF
A Simple Analysis of Voltage Transformer Paralleling Device Burn-out Fault
Jiang Tao, Li Quanpeng, Wang Xinping
2011(7): 38-38. DOI: 10.13882/j.cnki.ncdqh.2011.07.029
Abstract PDF
Automatic Drainage Water System for Substation Flood Prevention
Hui Dongjun, Mao Feng
2011(7): 39-39. DOI: 10.13882/j.cnki.ncdqh.2011.07.001
Abstract PDF
Supervisory Scheme of Auxiliary Facilities for Intelligent Substation
Wu Jinglei, Ma Xuezhi
2011(7): 40-42. DOI: 10.13882/j.cnki.ncdqh.2011.07.007
Abstract PDF
Application of Digitalized Technology for Substation in Jiang Su Province Power Network
Cao Xiaomei, Cao Hongxia
2011(7): 43-44. DOI: 10.13882/j.cnki.ncdqh.2011.07.008
Abstract PDF
Main Station System of Protection Information Based on DL/T 860 Technology
Jiang Yucheng
2011(7): 45-46, 48. DOI: 10.13882/j.cnki.ncdqh.2011.07.009
Abstract PDF
Unitized Management for Power Consumption Files of Low Voltage Consumer
Guo Bingzhao
2011(7): 47-48. DOI: 10.13882/j.cnki.ncdqh.2011.07.010
Abstract PDF
Prevention and Cure of Permanent Magnet High Field Steal Power
Lv Xiangbo
2011(7): 49-50, 52. DOI: 10.13882/j.cnki.ncdqh.2011.07.030
Abstract PDF
Reason Analysis of Tending Towards High Electricity Quantity Unbalance Rate in 110 kV Busbar
Chen Xinxue, Xinxue Zhiqin, Du Yu
2011(7): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.07.031
Abstract PDF
To Improve Excitation Property of Current Transformer
Qin Zongshu, Tan Cailing
2011(7): 53-54. DOI: 10.13882/j.cnki.ncdqh.2011.07.032
Abstract PDF
Solar Energy Photovoltaic Power Generation Project Participated by Power Company
Li Qin, Zhu Jie, Wei Jiaxiang
2011(7): 55-56. DOI: 10.13882/j.cnki.ncdqh.2011.07.011
Abstract PDF
Improved Design of Earthing Wire for Substation in Rural Village Power Network
Yan Xiaodong, Zhou Lei
2011(7): 57-57. DOI: 10.13882/j.cnki.ncdqh.2011.07.033
Abstract PDF
Duplex Wireless Intercommunication Safety Cap
Jin Jianyun, Zhang Fengguo
2011(7): 58-60. DOI: 10.13882/j.cnki.ncdqh.2011.07.012
Abstract PDF
Reconstruction for GW4-10 Disconnecting Switch
Lv Xiaogang
2011(7): 60-60. DOI: 10.13882/j.cnki.ncdqh.2011.07.034
Abstract PDF
Application of 10 kV Power Load Switch
Han Zongwen, Han Wei
2011(7): 61-62. DOI: 10.13882/j.cnki.ncdqh.2011.07.035
Abstract PDF
8 Main Points of Technical Measures for Increasing Power Supply Reliability
Wang Ruihua
2011(7): 63-63. DOI: 10.13882/j.cnki.ncdqh.2011.07.036
Abstract PDF
Improvement of Line Patrol Method for 10 kV Line Fault
Xie Tongfu, Jin Xin
2011(7): 64-64. DOI: 10.13882/j.cnki.ncdqh.2011.07.037
Abstract PDF