Advanced Search

column
Earlier Stage Research of Voltage Regulation and Monitor System for Small-sized Hydroelectric Generation
Liu Youren, Zhan Tao, Huang Ying, Cheng Zhenyu
2011(5): 5-7. DOI: 10.13882/j.cnki.ncdqh.2011.05.013
Abstract PDF
Administer of "Low Voltage" Problems Under Integral Transformers in Rural Village Area
Wu Zhijun
2011(5): 7-8. DOI: 10.13882/j.cnki.ncdqh.2011.05.003
Abstract PDF
Application of Digital Low Voltage Compensation Device
Ling Zhihui, Zhu Jianguo, Zhu Zhaohui, Pan Wenjun
2011(5): 9-10. DOI: 10.13882/j.cnki.ncdqh.2011.05.004
Abstract PDF
Scientific and Technical Innovation, to Step Forward Intelligent Power Network Era
Yao Xueheng
2011(5): 11-11. DOI: 10.13882/j.cnki.ncdqh.2011.05.005
Abstract PDF
Improvement Measures for Integrated Automation Substation
Yang Yang
2011(5): 12-13. DOI: 10.13882/j.cnki.ncdqh.2011.05.006
Abstract PDF
Automatized Communication Mode for Power Distribution Network Belonging to County Level
Li Tiyin, Liu Yongshang, Bao Zhengmin
2011(5): 14-15. DOI: 10.13882/j.cnki.ncdqh.2011.05.014
Abstract PDF
Laying Conductor Technology Using Remote Controlled Airship in Transmission Lines
Du Guangyue, Wang Zhiyong
2011(5): 16-17. DOI: 10.13882/j.cnki.ncdqh.2011.05.015
Abstract PDF
Application of GIS Equipment in Substation
Liu Chengzhi, Pan Xiaonan, Wang Jixin
2011(5): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.05.016
Abstract PDF
Existed Problems and SoIvable Schemes in Substation Designs
Chen Zhiwei
2011(5): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.05.017
Abstract PDF
Implementing and Applied Effects of Advanced Phase—sequence verifying Method for Ringed Network
Gong Defeng, Liu Weidong, Li Yanxiang
2011(5): 21-21. DOI: 10.13882/j.cnki.ncdqh.2011.05.007
Abstract PDF
Relaying Protection Reconstruction for 220 kV Busbars in Beijing Power Network
Wang Biao, Cai Qing
2011(5): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.05.018
Abstract PDF
State Monitor for Primary Equipment in Digitization Substation
Li Yuhua, Sun Chao
2011(5): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.05.008
Abstract PDF
Deliberation of Patrol Period for Substation Equipment
Wang Xingui
2011(5): 26-28. DOI: 10.13882/j.cnki.ncdqh.2011.05.019
Abstract PDF
Setting and Commissioning of Differential Protection for Transformers on Site
Sun Yu, Wang Jinjun
2011(5): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.05.020
Abstract PDF
Example Calculation and Preventive Measures of Cases for Conductor Offset Fault Tripping of Line Due to Wind
Wang Liguo, Shen Junhua
2011(5): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.05.021
Abstract PDF
Tripping of Lines Erected in Same Pole Due to Zero Sequence Mutual Induction
Liang Zhen
2011(5): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.05.010
Abstract PDF
Disposal of Multi—point Earthing Fault for 110 kV Transformer Iron Core
Wu Yongwei
2011(5): 34-35. DOI: 10.13882/j.cnki.ncdqh.2011.05.022
Abstract PDF
Main Transformer Burning Fault Due to Switch-cabinet Short-circuit
Shen Haibo, Wang Dongsheng
2011(5): 36-38. DOI: 10.13882/j.cnki.ncdqh.2011.05.023
Abstract PDF
Analysis and Real Example of Electric Fire in Rural Viilages
Jiao Hongwen
2011(5): 38-39. DOI: 10.13882/j.cnki.ncdqh.2011.05.002
Abstract PDF
Green Data Centre Construction for Enterprises
Wang Xiaofei
2011(5): 40-41. DOI: 10.13882/j.cnki.ncdqh.2011.05.024
Abstract PDF
Fault Location on Line Based on Traveling Wave Principle for Power Cables
Liu Tan
2011(5): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.05.025
Abstract PDF
Construction and Maintenance Management of Electricity Quantity Collection System
Chang Yong, Yao Yibin
2011(5): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.05.026
Abstract PDF
Management Information System for Power Distribution Network Based on Information Plafform
Gao Chao
2011(5): 46-47. DOI: 10.13882/j.cnki.ncdqh.2011.05.027
Abstract PDF
Establishment and Application of Temporary Earthing Wire Management System for Substation
Sun Yelong, Wu Shuchen, Guo Shuwei
2011(5): 48-49. DOI: 10.13882/j.cnki.ncdqh.2011.05.028
Abstract PDF
Shortening Constructing Time for Foundation of Polcs and Towers
Li Haizhou, Wang Peng
2011(5): 50-51. DOI: 10.13882/j.cnki.ncdqh.2011.05.029
Abstract PDF
Rainproof Cover of Buchhholz Relay for Transformcrs
Zhao Yuehui
2011(5): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.05.030
Abstract PDF
Influence of Wind Power Set Capacity Increment on Hei Long Jiang Power Network
Meng Yi, Zhong Zhaoxin
2011(5): 53-54. DOI: 10.13882/j.cnki.ncdqh.2011.05.011
Abstract PDF
Distributed Power Generation and Benefit Research
Ji Yunping, Ji Zhongkai
2011(5): 55-56. DOI: 10.13882/j.cnki.ncdqh.2011.05.031
Abstract PDF
Insulated Isolation Bar for 35 kV Phase to Phase
Liang Na, Zhang Mingze
2011(5): 57-57. DOI: 10.13882/j.cnki.ncdqh.2011.05.032
Abstract PDF
New Type Earthing Bar for Temporary Use
Xu Jizhong, Shao Wenge
2011(5): 58-58. DOI: 10.13882/j.cnki.ncdqh.2011.05.033
Abstract PDF
Climbing Pole-free Connecting Wire Clip for Temporary Power Utilization Under Wleetrified Condition
Ling Hua, Wu Qinghua, Zhou Jianfeng, Chen Hanqing
2011(5): 59-60. DOI: 10.13882/j.cnki.ncdqh.2011.05.034
Abstract PDF
Protective Cover for Current Transformers
Cui Hongling
2011(5): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.05.035
Abstract PDF
A Little View about Transmission Line Designs
Wang Jinfeng
2011(5): 62-62. DOI: 10.13882/j.cnki.ncdqh.2011.05.036
Abstract PDF
Maintenance Management Method of Collecting System for Electric Energy Quantity in Area
Li Huajun, Yuan Fengwei
2011(5): 63-63. DOI: 10.13882/j.cnki.ncdqh.2011.05.037
Abstract PDF
Operation, Maintenance and Management for Communication Power Supply System
Dang Yongfeng
2011(5): 64-64. DOI: 10.13882/j.cnki.ncdqh.2011.05.012
Abstract PDF