Earlier Stage Research and Early Stage Application of "Low Voltage" Integral Monitoring System
Jin Zhe, Li Jun, Cui Zheng
2011(4): 5-7. DOI: 10.13882/j.cnki.ncdqh.2011.04.014
Abstract PDF
Application of Adjustable Capacity Transformer and Large-sized and Small-sized Transformer
Deng Zhen, Xiang Dong
2011(4): 7-9. DOI: 10.13882/j.cnki.ncdqh.2011.04.015
Abstract PDF
Application of Wide-range off-circuit Voltage Regulation Distrbution Transformers
Zhan Tao, Liu Chunguang, Guan Huaming, Yang Yi
2011(4): 10-11. DOI: 10.13882/j.cnki.ncdqh.2011.04.016
Abstract PDF
Innovating Development, Facing Difficulty Working, to Construct First-class Enterprise----Management Sidelights of Qing Yang Power Supply Company in an Hui Province
He Chengjun, Li Hui, Zhang Jinxiu
2011(4): 12-13. DOI: 10.13882/j.cnki.ncdqh.2011.04.003
Abstract PDF
Application and Analysis of Dual Channel System for Dispatch Automatization
Xu Xuefeng, Ye Jianguo, Zhou Biao, Xiong Xin
2011(4): 14-16. DOI: 10.13882/j.cnki.ncdqh.2011.04.017
Abstract PDF
Application of ASON Technology in Power Supply Enterprise Under County
Zhou Biao, Ye Jianguo, You Jun, Li Hui, Zhang Jinxiu
2011(4): 16-18. DOI: 10.13882/j.cnki.ncdqh.2011.04.018
Abstract PDF
Design and Disposal of Substation Foundation in Karst Area
Yang Zhuomin
2011(4): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.04.013
Abstract PDF
Planning Design of Auxiliary Line for 3D Satellite Map
Wu Yanzhuo, Zhao Dongsong
2011(4): 21-21. DOI: 10.13882/j.cnki.ncdqh.2011.04.019
Abstract PDF
Measure Increasing Power Supply and Expanding Marketing in Feng Run District Power Bureau
Chen Haiyan
2011(4): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.04.004
Abstract PDF
Practical Method of Reactive Power Compensation Capacity Arrangement for Distribution Transformers
Meng Xiaoli, Sheng Wanxing, Wang Jinli
2011(4): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.04.020
Abstract PDF
Checking Method of D.C System Battery in Substation
Zhao Chunshan, Yu Na
2011(4): 25-26. DOI: 10.13882/j.cnki.ncdqh.2011.04.021
Abstract PDF
Discussion of Reserve Power Source Automatic Throw-in Blocking
Huang Hua, Tang Xianghua
2011(4): 27-28. DOI: 10.13882/j.cnki.ncdqh.2011.04.005
Abstract PDF
On-load Items in Live Distribution Line Work
Sun Hongwei, Hu min, Di Meihua, Gao Tianbao
2011(4): 29-30. DOI: 10.13882/j.cnki.ncdqh.2011.04.022
Abstract PDF
Calculation of Three Phase Load-flow in Power Distribution Network
Xu Zhen, Qu Ruiqian, Tang Wei
2011(4): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.04.023
Abstract PDF
Scheme of A.C Short Circuit for Melting Ice in 10 kV Lines
Pan Xuhui
2011(4): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.04.001
Abstract PDF
Reason Analysis of Line Electrification After 10 kV Circuit Breaker Opening
Liu Bin, Ding Zhigao, Xue Yong
2011(4): 35-36. DOI: 10.13882/j.cnki.ncdqh.2011.04.024
Abstract PDF
Short-line Short-circuit Fault in Low-voltage Side of 110 kV Main Transformer
Liu Hua
2011(4): 36-37. DOI: 10.13882/j.cnki.ncdqh.2011.04.025
Abstract PDF
Setting and Improving Scheme of Relaying Protection Under Fault in Multi-lines on Same Pole
Wang Xiuru
2011(4): 38-39. DOI: 10.13882/j.cnki.ncdqh.2011.04.026
Abstract PDF
Lightning Stroke Fault of Disconnecting Switch in 35 kV Substation
Zhang Zhende, Li Wei, Zhao Pengyue
2011(4): 40-41. DOI: 10.13882/j.cnki.ncdqh.2011.04.027
Abstract PDF
Construction of Power Communication Network in Shangyi District
Mi Zengqiang, Wang Lidong
2011(4): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.04.006
Abstract PDF
Application Prospect of Terahertz Technology in Power System
Gui Jianting, Xu Qinyuan, Chen Changchun, Wang Yunke, Xu Tao, Wang Jue
2011(4): 43-44. DOI: 10.13882/j.cnki.ncdqh.2011.04.028
Abstract PDF
Exploitation and Application of Rush Repair System for Electrical Power
Wang Fayi, Xu Tongyu, Li Jinghong
2011(4): 45-46. DOI: 10.13882/j.cnki.ncdqh.2011.04.029
Abstract PDF
Real-time Networking Technology Between Bank and Power Supply Company
Gao Shuxin
2011(4): 47-48. DOI: 10.13882/j.cnki.ncdqh.2011.04.007
Abstract PDF
State Maintenance of Secondary Equipment for Substation
Shi Zhihong, Hu Wei
2011(4): 48-49. DOI: 10.13882/j.cnki.ncdqh.2011.04.008
Abstract PDF
Construction of Distribution Power Network GIS Based on SmallWorld Platform
Fu Junyuan
2011(4): 50-51. DOI: 10.13882/j.cnki.ncdqh.2011.04.009
Abstract PDF
Development of Fast Verifying Wire Device for Relaying Protection
Tang Jianmin, Chen Weijun, Xia Hongjun
2011(4): 52-53. DOI: 10.13882/j.cnki.ncdqh.2011.04.030
Abstract PDF
Shortening Average Power Supply Time for Temporarily Digging Well Customer in Rural Village Area
Liu Jindong, Zhang Yuanping
2011(4): 54-55. DOI: 10.13882/j.cnki.ncdqh.2011.04.010
Abstract PDF
Self-powered System for Passive Testing in Field
Wang Li, Chen Guohong, Yang Jie
2011(4): 56-56. DOI: 10.13882/j.cnki.ncdqh.2011.04.011
Abstract PDF
Existing Condition and Counter-measure of Hydroelectric Dispatch Management Working in FU Song
Wang Yisheng
2011(4): 57-58. DOI: 10.13882/j.cnki.ncdqh.2011.04.012
Abstract PDF
Comparison of Energy-storage Technologies Applicable to Distributed Power Generation
Qiang Zhanyun, Ju Jianyong, Wu Fubao, Yin Shugang, Zhang Yajuan
2011(4): 58-60. DOI: 10.13882/j.cnki.ncdqh.2011.04.031
Abstract PDF
Checking and Repair for Density Relay
Si Huilin
2011(4): 61-62. DOI: 10.13882/j.cnki.ncdqh.2011.04.032
Abstract PDF
ZN63A-12 Circuit Breakers
Chen Chao, Song Dexiang
2011(4): 62-63. DOI: 10.13882/j.cnki.ncdqh.2011.04.033
Abstract PDF
Fast Removal Method and Attentive Items for Single Phase Earthing Fault
Li Xinglong, Wang Xiaoming, Zhang Yong
2011(4): 64-64. DOI: 10.13882/j.cnki.ncdqh.2011.04.034