Reconstruction of Auto-connected Voltage Regulation for Aged and Old Transformers
Ling Yonghua, Sheng Junying, Fang Yingchun, Xu Dongliang
2011(2): 5-7. DOI: 10.13882/j.cnki.ncdqh.2011.02.012
Abstract PDF
Voltage Quality Management and Checking and Appraisal System
Li Xiaojun, Jin Zhe, Cui Zheng, Li Jun
2011(2): 7-9. DOI: 10.13882/j.cnki.ncdqh.2011.02.013
Abstract PDF
Application of Power Distributionizing for 35 kV Voltage
Zhan Tao, Cheng Zhengfu, Wang Kunhua
2011(2): 10-12. DOI: 10.13882/j.cnki.ncdqh.2011.02.003
Abstract PDF
Application of Optical Fiber Communication System in Power Supply Enterprise Belonging to County Level
Su Jiangang
2011(2): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.02.005
Abstract PDF
Combined System Preventing Mal-operation for Central Stations
Jie Zhizhao
2011(2): 17-19. DOI: 10.13882/j.cnki.ncdqh.2011.02.014
Abstract PDF
Automation of Power Distribution Network in Power Supply Enterprise Belonging to County Level
Xie Lixin
2011(2): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.02.006
Abstract PDF
Selection of 10 kV Distribution Transformers
Ren Zongli
2011(2): 21-21. DOI: 10.13882/j.cnki.ncdqh.2011.02.015
Abstract PDF
Analysis Simplifing Voltage Class in Rural Power Network
Sun Jianjun
2011(2): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.02.007
Abstract PDF
Reconstruction Method and Attention Matters for Installation of Residual Current Protective Device in TN-C Earthing System
Zhou Ya, Wang Xueling
2011(2): 23-23. DOI: 10.13882/j.cnki.ncdqh.2011.02.016
Abstract PDF
Experience of Operation and Management in Shang Luo Power Network
Yue Disong, Wang Bin, Dai Shang'an
2011(2): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.02.017
Abstract PDF
Eliability Analysis of Service Power System for Substations
Lu Jiandong, Sun Hua
2011(2): 26-27. DOI: 10.13882/j.cnki.ncdqh.2011.02.018
Abstract PDF
Analysis and Counter-measure of Ratio of Capacity, Load in Gong Yi Power Network
Xu Zhonghui, Wang Shaohui, Zhi Yafeng
2011(2): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.02.019
Abstract PDF
Fault Positioning Technology Using Dividing Switch and Injecting Signal for Power Distribution Network
Zheng Wenxiu
2011(2): 30-31. DOI: 10.13882/j.cnki.ncdqh.2011.02.020
Abstract PDF
Low Voltage Protection for Shunt Capacitors
Wang Baoqing
2011(2): 32-33. DOI: 10.13882/j.cnki.ncdqh.2011.02.021
Abstract PDF
Check and Analysis of Active Neutral Line for a 10 kV Distribution Transformer
Yang Ti
2011(2): 34-35. DOI: 10.13882/j.cnki.ncdqh.2011.02.022
Abstract PDF
Tripping Reason Analysis of Main Transformer in Jun Zhai Substation, Fan County
Xia Jiulong, Zhang Hongbo
2011(2): 36-37. DOI: 10.13882/j.cnki.ncdqh.2011.02.023
Abstract PDF
Analysis of Tripping Due to Lightning Stroke for HV Transmission Lines
Guo Tao
2011(2): 38-39. DOI: 10.13882/j.cnki.ncdqh.2011.02.024
Abstract PDF
Application of Visible Dispatch System
Li Lianhui
2011(2): 40-41. DOI: 10.13882/j.cnki.ncdqh.2011.02.025
Abstract PDF
Reconstruction of Dispatch and Control Integration in County Level
Zhang Shaozhang
2011(2): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.02.008
Abstract PDF
Application of Graphic Fault Analysis, Setting and Emulation Software in Setting Calculation
Liu Gaohui, Liu Min, He Lizhu, Lu Shengping, Wu Yanjun, Zhao Jun
2011(2): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.02.009
Abstract PDF
To Realize Ordered Power Utilization Management Using Electrical Information Collecting System
Teng Lingao
2011(2): 46-47. DOI: 10.13882/j.cnki.ncdqh.2011.02.026
Abstract PDF
Carrying Out Technical Ability Training Related to Overhead Line in a Smaller Site
Jiang Chuandong, Xu Xiaohui, Zhao Rui
2011(2): 48-49. DOI: 10.13882/j.cnki.ncdqh.2011.02.027
Abstract PDF
Reducing Forced Outage Number of Times of Primary Equipment Due to Heat in Substation
Zhang Zhenzhen, Yi Huaiqiang
2011(2): 50-50. DOI: 10.13882/j.cnki.ncdqh.2011.02.028
Abstract PDF
Abuses Analysis and Processing Method for Revoked Watt-hour Meter Management
Liu Minghui
2011(2): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.02.029
Abstract PDF
Development of Automatic Recovery Power Supply for Load Control Termination
Zhang Bo, Miao Yingjie, Zhu Lili
2011(2): 52-53. DOI: 10.13882/j.cnki.ncdqh.2011.02.010
Abstract PDF
Mode Selection Design of Independent Photovoltaic Electric Generation System for Customer in Shan Xi Area
Duan Yuhan
2011(2): 54-55. DOI: 10.13882/j.cnki.ncdqh.2011.02.030
Abstract PDF
Developing Mode Research of Distributed Energy Resources Under Intelligent Power Network Frame
Wang Shiqian, Lin Li
2011(2): 56-57. DOI: 10.13882/j.cnki.ncdqh.2011.02.031
Abstract PDF
New Technology for Special Tightening Tools Replacing Battery on Line
Zhou Shiming
2011(2): 58-58. DOI: 10.13882/j.cnki.ncdqh.2011.02.032
Abstract PDF
Fault Analysis of Composite Switch for LV Reactive Power Compensation
Chen Guoqi, Zhou Ke
2011(2): 59-60. DOI: 10.13882/j.cnki.ncdqh.2011.02.033
Abstract PDF
Seven Measures to Prevent Getting an Electric Shock in Rainfall
Wan Hongwei
2011(2): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.02.001
Abstract PDF
Operating State Analysis and Repairing Recommendation for Capacitor Switch
Lu Fei
2011(2): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.02.034
Abstract PDF
Arrangement and Basic Operating Principle of Shunt Capacitor Bank
Ge Nan
2011(2): 62-63. DOI: 10.13882/j.cnki.ncdqh.2011.02.035
Abstract PDF