Advanced Search

column
Soft Administering for "Low Voltage" Problems in Rural Village Power Network
Zhang Huijie, Dong Lizhao
2011(12): 5-6. DOI: 10.13882/j.cnki.ncdqh.2011.12.003
Abstract PDF
Application of New Products in "Low Voltage" Administering
Wu Chunlin, Liu Ying, Yan Xijun
2011(12): 7-7. DOI: 10.13882/j.cnki.ncdqh.2011.12.012
Abstract PDF
Increasing Power Supply Reliability for Customs in Power Supply System
Lin Guoming
2011(12): 8-9. DOI: 10.13882/j.cnki.ncdqh.2011.12.013
Abstract PDF
Live Checking of Partial Discharge for Switch Cabinet in 10 kV Power Distribution Network
Zhang Jian
2011(12): 10-12. DOI: 10.13882/j.cnki.ncdqh.2011.12.014
Abstract PDF
Best Practical Mode for Regional Power Distribution Automatization
Zhao Wenbo
2011(12): 13-14. DOI: 10.13882/j.cnki.ncdqh.2011.12.004
Abstract PDF
Safe Management for New One Round of Reconstruction and Upgrade Engineering for Rural Power Network
Ji Yuxi, Wang Yali, Yang Lizhou, Li Mengren
2011(12): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.12.005
Abstract PDF
Application of Steel Structure in Substation Construction
Wang Chao
2011(12): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.12.011
Abstract PDF
Erection of Track and Working Platform of Steel Pipe Scaffold
Zhou Qingquan, Zhu Pengfei
2011(12): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.12.006
Abstract PDF
Simple Analysis for Regional Power Supply Reliability Raise
Guo Tianyu
2011(12): 21-21. DOI: 10.13882/j.cnki.ncdqh.2011.12.015
Abstract PDF
Popularization of Typical Power Supply Mode in Huai An District
Xiao Wenbiao
2011(12): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.12.007
Abstract PDF
Inquiry for MOA Live Testing Technology
Wang Xingui, Ma Yulin
2011(12): 26-26. DOI: 10.13882/j.cnki.ncdqh.2011.12.016
Abstract PDF
Reason Analysis and Improvement for D.C Resistance Testing Error
Jin Jinyuan
2011(12): 27-28. DOI: 10.13882/j.cnki.ncdqh.2011.12.017
Abstract PDF
Saving Power Technology in Distribution Transformer Operation
Qu Gerong
2011(12): 29-30. DOI: 10.13882/j.cnki.ncdqh.2011.12.018
Abstract PDF
Analysis of Secondary Voltage Fluctuation for TYD 35 Voltage Transformer
Wang Dezhi
2011(12): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.12.019
Abstract PDF
Analysis of Differential Quick-break Trip Mal-operation for Mmain Transformer
Hao Zhiyu, Huang Lu, Yang Jing, Bai Xueyan, Guo Weihong, Zhang Ruiyun
2011(12): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.12.020
Abstract PDF
Reason Analysis of Electrical Switch Trip in a Resident Quarter
Zhang Yan, Chen Miao
2011(12): 35-36. DOI: 10.13882/j.cnki.ncdqh.2011.12.021
Abstract PDF
Application of L.V Concentric Copying kWh Meter Reading System in Rural Village
Liu Ju
2011(12): 37-38. DOI: 10.13882/j.cnki.ncdqh.2011.12.009
Abstract PDF
Resolving Influence of Low Temperature on Carrier Communication in Resident Quarter By Technical Improvement
Zhang Yonghua, Tian Qiang
2011(12): 39-41. DOI: 10.13882/j.cnki.ncdqh.2011.12.022
Abstract PDF
Application of Remote Concentric Copying kWh Meter Reading
Wei Jun, Shi Yang
2011(12): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.12.023
Abstract PDF
Analysis and Selection of Communication Mode for L.V Copying kWh Meter Reading System in a Small Resident Quarter
Tang Yongjiu, Kong Weidong, Yu Xi
2011(12): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.12.024
Abstract PDF
New Technology of Installation for Incoming and Outgoing Lines (Multi-wires Per Phase)
Zhang Xiaoming
2011(12): 46-47. DOI: 10.13882/j.cnki.ncdqh.2011.12.025
Abstract PDF
Raising Power Factor of 10 kV Lines
Qiu Weidong
2011(12): 48-49. DOI: 10.13882/j.cnki.ncdqh.2011.12.026
Abstract PDF
Movable Photo-voltaic Power Generating System
Cai Hao, Huang Wei, Pang Lacheng, Li Jianjun, Li Jihe
2011(12): 50-52. DOI: 10.13882/j.cnki.ncdqh.2011.12.027
Abstract PDF
The Application of HDVC Light on the Integration of Wind Energy
Fang Qing
2011(12): 53-54. DOI: 10.13882/j.cnki.ncdqh.2011.12.028
Abstract PDF
Integrated Electroscopy and Earthing Handcart for Switch-cabinet with Mid-position Circuit-breaker
Wang Huiliang, Tong Xiaohan, Chen Jiangang, Ouyang Bo, Ouyang Zhu
2011(12): 55-55. DOI: 10.13882/j.cnki.ncdqh.2011.12.029
Abstract PDF
Maintenance and Operation for Vacuum Circuit-breaker in Rural Village Power Distribution Network
Zhang Ning, Zhao Hongning
2011(12): 56-56. DOI: 10.13882/j.cnki.ncdqh.2011.12.030
Abstract PDF
"Four Measures" to Firm Safe Fire Wall
Zhao Aimin, Bao Zhu
2011(12): 57-57. DOI: 10.13882/j.cnki.ncdqh.2011.12.010
Abstract PDF
Nine Preventing Measures to Clear Tree Obstacle for Electrician
Kong Lingwen
2011(12): 57-57. DOI: 10.13882/j.cnki.ncdqh.2011.12.002
Abstract PDF