"Low Voltage" Problem of Power Network in Farming and Stock Breeding Area are Brought Under Control
Shi Changming, Mao Guoli, Xing Lixia
2011(11): 5-6. DOI: 10.13882/j.cnki.ncdqh.2011.11.031
Abstract PDF
Multiple Measures are Adopted to Overcome"Low Voltage"
Chen Zhisi
2011(11): 7-8. DOI: 10.13882/j.cnki.ncdqh.2011.11.032
Abstract PDF
Working Experience for Scientific and Technical Progress in Yiwu City Power Supply Bureau
2011(11): 9-10. DOI: 10.13882/j.cnki.ncdqh.2011.11.007
Abstract PDF
County Level Dispatch PAS/DTS System Based on District-county United Model
Wu Minmin, Yang Xin
2011(11): 11-11. DOI: 10.13882/j.cnki.ncdqh.2011.11.008
Abstract PDF
Construction of Dispatch-control-distribution Integration Dystem
Cao Fei
2011(11): 12-13. DOI: 10.13882/j.cnki.ncdqh.2011.11.009
Abstract PDF
Investigation of Intellectualizing Reconstruction for LV Power Network in Rural Village
Liu Jian, Zhou Fangyou, Liu Dongqi, Yu Shengli
2011(11): 14-15. DOI: 10.13882/j.cnki.ncdqh.2011.11.010
Abstract PDF
Cost Management Shall be Paid Great Attention in Reconstructing Escalation for Rural Village Power Network
Wang Hua, Liu Haixia
2011(11): 16-17. DOI: 10.13882/j.cnki.ncdqh.2011.11.011
Abstract PDF
Planning and Construction for Power Distribution Network in City Proper
Zhang Baoling, Wu Di, Guo Jingtao, Wang Baojuan
2011(11): 18-19. DOI: 10.13882/j.cnki.ncdqh.2011.11.033
Abstract PDF
Reason Analysis of Unbalance Rate Over-error for Electric Quantity in Buses
Wang Chengyi
2011(11): 20-21. DOI: 10.13882/j.cnki.ncdqh.2011.11.034
Abstract PDF
Mal-operation Analysis of Unbalance Voltage Protection for Capacitors
Liu Xuezhong, Huang Jingbo
2011(11): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.11.035
Abstract PDF
Gas Leakage Fault for Gas Insulated Switchgear
Ling Hui
2011(11): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.11.036
Abstract PDF
Measure to Avoid Heating, Burning in Connected Position of Equipment
Liu Chunqiang
2011(11): 25-25. DOI: 10.13882/j.cnki.ncdqh.2011.11.022
Abstract PDF
Measures to Increase Earthing Engineering Quality
Wang Jinshui
2011(11): 26-26. DOI: 10.13882/j.cnki.ncdqh.2011.11.023
Abstract PDF
Fault Analysis of Short Circuit in a l10 kV GIS Bus
Yu Guoqiang, Wang Yu
2011(11): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.11.025
Abstract PDF
Incorrect Operation Analysis of for a Differential Protection
Liu Chao, Qi Bo
2011(11): 30-30. DOI: 10.13882/j.cnki.ncdqh.2011.11.026
Abstract PDF
Increasing Reclosing Successful Rate for Substation
Lai Qinghui, Huang Yunying, Chen Wenquan
2011(11): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.11.012
Abstract PDF
Pre-control of Dangerous Point for Switching Operation in Switching Substation
Ding Liming
2011(11): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.11.037
Abstract PDF
On-line Intellectual Monitoring System for Inside Cubicle in Substation
Sun Huawei, Yuan Hongzhou, Guo Wei, Bai Yang
2011(11): 35-36. DOI: 10.13882/j.cnki.ncdqh.2011.11.013
Abstract PDF
Operation and Maintenance of Intellectual Copying kWh Reading, Accounting, Collecting Fee and Basic Material
He Jiesong, Huang Xionglie
2011(11): 37-38. DOI: 10.13882/j.cnki.ncdqh.2011.11.014
Abstract PDF
Operation and Maintenance of Intellectual Management System for LV Power Distribution
Tang Xiaoyan
2011(11): 39-39. DOI: 10.13882/j.cnki.ncdqh.2011.11.015
Abstract PDF
Development of Digitizing Substation Seeing From a Substation
Wang Wenzheng, Shen Yueming, Chen Ji
2011(11): 40-41. DOI: 10.13882/j.cnki.ncdqh.2011.11.016
Abstract PDF
Artificial Training Management Mode for Call Out Center
Zhong Hongwei
2011(11): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.11.017
Abstract PDF
Reducing Fault Rate of Power Optic Communication System
Yan Qihai, Song Weixing, Miao Yulei
2011(11): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.11.038
Abstract PDF
Lift of Operational Rate for Telecontrol Termination
Pan Pengfei
2011(11): 46-47. DOI: 10.13882/j.cnki.ncdqh.2011.11.018
Abstract PDF
Increasing Safety of Work High Above Ground in Substation Site
Gao Yonghui, Liu Hexin
2011(11): 48-48. DOI: 10.13882/j.cnki.ncdqh.2011.11.002
Abstract PDF
Micro-hydraulic Electric Power Construction in Fu Jian Province
Zhang Li, Liu Chenfang
2011(11): 49-50. DOI: 10.13882/j.cnki.ncdqh.2011.11.019
Abstract PDF
Influence Analysis on Power Distribution Network Due to Small Hydraulic Electric Power Synchronizing and Close
Hu Xiuzhen, Zhai Weifang, Zhang Yongjun
2011(11): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.11.020
Abstract PDF
Selection of Generating Unit Quantity in Kensiwate Hydraulic Power Station
Wu Xianzhong, Wang Feng, Qiu Xinyuan
2011(11): 53-53. DOI: 10.13882/j.cnki.ncdqh.2011.11.021
Abstract PDF
Application of Pre-stranded Type Fitting in Power Network Construction
He Yanbin, Sun Zhongfeng
2011(11): 56-57. DOI: 10.13882/j.cnki.ncdqh.2011.11.028
Abstract PDF
Requirements of MV-LV Relaying Protection Coordination in Power Distribution Room Belonging to Customer
Wu Xiaohai, Ding Lijia
2011(11): 58-58. DOI: 10.13882/j.cnki.ncdqh.2011.11.029
Abstract PDF
New Method to Prevent Person Injured and Deathful Casualty
Lu Bin
2011(11): 59-59. DOI: 10.13882/j.cnki.ncdqh.2011.11.001
Abstract PDF
Some Few Attentive Matters for Safe Power Utilization in Family