Advanced Search

column
Comprehensive Administration of "Low Voltage" for Rural Power Distribution Network in Yuncheng County
Zhao Xianlun
2011(10): 5-6. DOI: 10.13882/j.cnki.ncdqh.2011.10.006
Abstract PDF
Administration of "Low Voltage" for Rural Power Network
Li Xiaoyu, Shao Yueping
2011(10): 7-8. DOI: 10.13882/j.cnki.ncdqh.2011.10.007
Abstract PDF
Reinforcing Electric Power by Science and Technology to Climb Peak
Wang Xiaojun, Wang Bin
2011(10): 9-10. DOI: 10.13882/j.cnki.ncdqh.2011.10.008
Abstract PDF
Supporting System for Rural Power Consumer Service
Zheng Senquan, Wang Xin, Tian Xiaoye
2011(10): 11-12. DOI: 10.13882/j.cnki.ncdqh.2011.10.009
Abstract PDF
Video Management Information System
Li Xiaoping, He Wenge, Wang Xin, Wang De
2011(10): 13-14. DOI: 10.13882/j.cnki.ncdqh.2011.10.010
Abstract PDF
Working Mechanism of Quality Supervision for Engineering Project of Reconstruction and Escalation in Rural Village Power Network
Yao Guoqing
2011(10): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.10.011
Abstract PDF
Exploration and Practice of Management and Control for Engineering Project in Rural Village Power Network
Li Tao, Peng Daiwen
2011(10): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.10.012
Abstract PDF
Application of Information Sub-station for Relaying Protection
Tang Lei, Xu Zhen, Qi Guochang, Wu Youzhong
2011(10): 19-20. DOI: 10.13882/j.cnki.ncdqh.2011.10.017
Abstract PDF
Cross-configuration of Secondary Winding in Current Transformer for Protection Use
Li Chunliang, He Liping
2011(10): 21-22. DOI: 10.13882/j.cnki.ncdqh.2011.10.018
Abstract PDF
Analysis of Display for Voltage to Ground for DC Circuit
Pang Wei
2011(10): 23-24. DOI: 10.13882/j.cnki.ncdqh.2011.10.019
Abstract PDF
Special Problem of 10 kV Power Distribution Line Protections
Li Yonggang, Li Jing
2011(10): 25-26. DOI: 10.13882/j.cnki.ncdqh.2011.10.020
Abstract PDF
Process Analysis of Mistake in Primary Connection for Metering
Bi Weiqing
2011(10): 27-28. DOI: 10.13882/j.cnki.ncdqh.2011.10.021
Abstract PDF
Connecting Made of Lightning Protection Device for Power Distribution Transformers
Yang Xinjie
2011(10): 29-29. DOI: 10.13882/j.cnki.ncdqh.2011.10.022
Abstract PDF
Analysis of Refusing Operation for Two-tripping Coil Switch
Xu Zhen, Cheng Jinming, Sun Jianghuai
2011(10): 30-30. DOI: 10.13882/j.cnki.ncdqh.2011.10.023
Abstract PDF
Counter-measure for Large-area Outage in Regional Power Network
Cai Guichao
2011(10): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.10.024
Abstract PDF
Improvement of Secondary Circuit for Relaying Protection
Wang Quanfei, Cai Xiuzhong, Guo Fei
2011(10): 33-34. DOI: 10.13882/j.cnki.ncdqh.2011.10.025
Abstract PDF
Simple Analysis of Miss-operation for Differential Protection for Main Transformer
Ke Wei, Li Jun, Xia Minjuan, Tian Damao
2011(10): 35-36. DOI: 10.13882/j.cnki.ncdqh.2011.10.026
Abstract PDF
Application of FMT Technology in LV Power Line Carrier Communication System
Wang Xianglong, Ding Weiguang, Ding Wenyan
2011(10): 37-38. DOI: 10.13882/j.cnki.ncdqh.2011.10.027
Abstract PDF
Application of Theoretic Calculation and Analysis System Based on Network for Line Loss
Pan Xing, Huang Xiaoming, Wang Zheng, Zha Lei
2011(10): 39-41. DOI: 10.13882/j.cnki.ncdqh.2011.10.028
Abstract PDF
Application of Intelligent Supervisory Control Technology in Rural Village Power Distribution Network
Yang Jialu
2011(10): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.10.013
Abstract PDF
Investigation of Developing Tendency for Network Dispatch Automatization
Fan Lili
2011(10): 44-44. DOI: 10.13882/j.cnki.ncdqh.2011.10.029
Abstract PDF
Simple Discussion for Intelligent Network Development
Fang Qing
2011(10): 45-46. DOI: 10.13882/j.cnki.ncdqh.2011.10.014
Abstract PDF
New Type Preventing Fallen Safe Belt
Wu Di, Huang Lihua
2011(10): 47-48. DOI: 10.13882/j.cnki.ncdqh.2011.10.001
Abstract PDF
Increasing Intact Rate for Portable Short-circuit Earthing Conductor
Li Haizhou, Cheng Aimin, Zhang Gaixing, Wang Peng
2011(10): 49-50. DOI: 10.13882/j.cnki.ncdqh.2011.10.002
Abstract PDF
Analysis for Wind Power Generation Synchronizing Operation in Beijing Power Network
Zhang Yinbao, Liu Ying, Lv Da, Wang Bo, Sha Licheng
2011(10): 51-52. DOI: 10.13882/j.cnki.ncdqh.2011.10.030
Abstract PDF
Research Based on AGC for Wind, Hydraulic Complementary Power Generation System
Weng Shasha, Yun Tianji
2011(10): 53-55. DOI: 10.13882/j.cnki.ncdqh.2011.10.031
Abstract PDF
Application of Outdoor HV Vacuum Load Isolator
Liu Baoling, Yan Ying
2011(10): 56-57. DOI: 10.13882/j.cnki.ncdqh.2011.10.032
Abstract PDF
Improvement of Wiving Terminal-cap for HV Current-limiting Fuse
Sun Zhanhui
2011(10): 58-58. DOI: 10.13882/j.cnki.ncdqh.2011.10.033
Abstract PDF
Application of Office Soft Ware in Engineering Budget Drawing Out
Wu Jianneng
2011(10): 59-59. DOI: 10.13882/j.cnki.ncdqh.2011.10.015
Abstract PDF
Pactical Method for Information Network Reconstruction
Wang Liguo
2011(10): 60-60. DOI: 10.13882/j.cnki.ncdqh.2011.10.016
Abstract PDF
What are "Dummy Voltage", "Inducted Electricity" and "Drain Voltage"
Yang Tao
2011(10): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.10.034
Abstract PDF
Electric Circuit Fault in Auxiliary Room Due to Leakage Cannot be Ignored/
Peng Rongcai
2011(10): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.10.003
Abstract PDF
Simple Discussion for Safe Power Utilization in Bath Room
Wang Hualei
2011(10): 62-62. DOI: 10.13882/j.cnki.ncdqh.2011.10.035
Abstract PDF