Advanced Search

column
Experimental Unit Research of Three-level Combined Adjustment for Substations, Line and Distribution Transformer Voltages
Zhang Peijie, Yu wei, Chang Song, Jiang Zuyuan, Wang Honghao
2011(1): 5-8. DOI: 10.13882/j.cnki.ncdqh.2011.01.001
Abstract PDF
35 kV Distribiutionizing Construction
Wu Ping, An Siqing, Cheng Shengping, Shao Mingsheng
2011(1): 9-10. DOI: 10.13882/j.cnki.ncdqh.2011.01.002
Abstract PDF
Application of Voltage Regulator in MV Lines
Yu Xiaomu, Wang Jifeng, Zhai Xiaofan, He Fuwei
2011(1): 11-12. DOI: 10.13882/j.cnki.ncdqh.2011.01.003
Abstract PDF
Creating First-class Enterprises, Building up Brilliance
Liu Rushui
2011(1): 13-14. DOI: 10.13882/j.cnki.ncdqh.2011.01.033
Abstract PDF
Application of Wireless Wide-band Connected into System in Intelligent Power Network
Zhang Feng
2011(1): 15-16. DOI: 10.13882/j.cnki.ncdqh.2011.01.025
Abstract PDF
Intelligentization Reconstruction of Area Supplied by Pole—mounted Distribution Transformers and Application
Wang Shuai, Zhang Feng
2011(1): 17-18. DOI: 10.13882/j.cnki.ncdqh.2011.01.004
Abstract PDF
Automation of Power Distribution Lines in Rural Villages
Hao Xiaodong, Zhang Ganzhen
2011(1): 18-19. DOI: 10.13882/j.cnki.ncdqh.2011.01.026
Abstract PDF
Attention Problems in Construction for Box Type Substation
Gao Xiang
2011(1): 20-21. DOI: 10.13882/j.cnki.ncdqh.2011.01.005
Abstract PDF
Reconstruction of Small-size 35 kV Substation in Rural Village
Li Yuanjiang
2011(1): 22-23. DOI: 10.13882/j.cnki.ncdqh.2011.01.006
Abstract PDF
Elementary Discussion about Power Network Construction Related to Forest Area
Wang Zhiyong, Du Guangyue
2011(1): 24-25. DOI: 10.13882/j.cnki.ncdqh.2011.01.034
Abstract PDF
Utilization of Control Chart Method in Calibration and Verification of Kilowatt-hour Meters
Wang Jin
2011(1): 25-26. DOI: 10.13882/j.cnki.ncdqh.2011.01.007
Abstract PDF
Technical Solution about Integral Energy Saving in Rural Village Network
Xin Yong, Liang Ying
2011(1): 27-28. DOI: 10.13882/j.cnki.ncdqh.2011.01.023
Abstract PDF
Measure to Reduce Outage Time for Customers
Lin Li
2011(1): 28-29. DOI: 10.13882/j.cnki.ncdqh.2011.01.008
Abstract PDF
Management Mode for Unattended Substation
Li Xiaogang
2011(1): 30-30. DOI: 10.13882/j.cnki.ncdqh.2011.01.027
Abstract PDF
Measure Reducing Power Network Loss for Economic Undeveloped County Town
Huang Lvgeng
2011(1): 31-32. DOI: 10.13882/j.cnki.ncdqh.2011.01.009
Abstract PDF
Measure Limiting Single-phase Short Circuit Current for 500 kV Wan Cheng Substation
Liu Hongjun, Wu Dongsheng, Chen Shiyuan
2011(1): 32-33. DOI: 10.13882/j.cnki.ncdqh.2011.01.010
Abstract PDF
Construction, Function and Influence of Reactive Power Compensation in all Power Networks
Zhao Qiming, Ren Zhiqiang, Gao Weiqing, Zhang Lei
2011(1): 34-35. DOI: 10.13882/j.cnki.ncdqh.2011.01.011
Abstract PDF
Reason Analysis on Post-accelerating Trip of Distance Protection after One Manual Closing Circuit-breaker in a 110 kV Transmission Line
Zhang Danjie, Liu Xiaozhong, Zhang Peng
2011(1): 36-37. DOI: 10.13882/j.cnki.ncdqh.2011.01.012
Abstract PDF
A Fault Analysis of Main Transformer Due to Rubber Bag Breaking in Conservator
Wang Hongbin
2011(1): 38-38. DOI: 10.13882/j.cnki.ncdqh.2011.01.013
Abstract PDF
Reason Analysis for Two Points Earthing in Secondary Circuit of Current Transformer
Wang Chuqi, Qin Xiaolai, Peng Luyu
2011(1): 39-40. DOI: 10.13882/j.cnki.ncdqh.2011.01.014
Abstract PDF
Reason Analysis for Reclosing Operation Lose of 10 kV Lines
Gu Aibin, Liu Yangming
2011(1): 41-42. DOI: 10.13882/j.cnki.ncdqh.2011.01.028
Abstract PDF
Example Analysis for Tele-mechanical Fault of Power Communication
Fang Xiang
2011(1): 42-43. DOI: 10.13882/j.cnki.ncdqh.2011.01.015
Abstract PDF
Real-time Collecting Fee System for Wireless POS Link up Networks
Ding Zhengsheng
2011(1): 44-45. DOI: 10.13882/j.cnki.ncdqh.2011.01.029
Abstract PDF
Application of IEC 61850 Standard in Substation
Zeng Zhigang
2011(1): 46-47. DOI: 10.13882/j.cnki.ncdqh.2011.01.030
Abstract PDF
Feasibility Research of CDMA Wireless Communication Mode
Wang Huiliang, Chen Xing, Ou Yang zhu
2011(1): 48-49. DOI: 10.13882/j.cnki.ncdqh.2011.01.024
Abstract PDF
Production Data Centralization and Management System Belonging to Provincial Level Power Network
Guo Lu, Yu Zenglin, Lv Huanji, Cui Zhiguo, Wu Fubao, Xu Honghai
2011(1): 50-51. DOI: 10.13882/j.cnki.ncdqh.2011.01.035
Abstract PDF
Reducing Failure Rate for Cable Joint of 35 kV Substation
Wang Weilin
2011(1): 52-53. DOI: 10.13882/j.cnki.ncdqh.2011.01.016
Abstract PDF
Reducing Number that Power Facilities Are Stolen
Zhang Guoqing, Zheng Na, Zheng Li, Jiang Bo, Fan Huijun
2011(1): 53-54. DOI: 10.13882/j.cnki.ncdqh.2011.01.017
Abstract PDF
Construction and Benefit of Alpine Type Wind Power Field
Tang Jinyuan
2011(1): 56-58. DOI: 10.13882/j.cnki.ncdqh.2011.01.019
Abstract PDF
Development of Portable Type Ultrasonic Alarm
Chen Junliang
2011(1): 59-61. DOI: 10.13882/j.cnki.ncdqh.2011.01.031
Abstract PDF
Improvement of Temperature Control Device in High Voltage Switchgear Room
Liu Zhi'an
2011(1): 61-61. DOI: 10.13882/j.cnki.ncdqh.2011.01.020
Abstract PDF
Some Wrong Things in Earthing of LV Area Supplied by Pole-mounted Distribution Transformers
Song Shuwei
2011(1): 62-62. DOI: 10.13882/j.cnki.ncdqh.2011.01.021
Abstract PDF
A Example About HV Cable Fault Identification
Li Zhongxia
2011(1): 63-64. DOI: 10.13882/j.cnki.ncdqh.2011.01.022
Abstract PDF