Advanced Search

column
To Innovate with Keen Determination, Diligent Starting an Undertaking to Construct a Strong and Intelligent Electric Power Network
Zhang Fengliang
2010(9): 5-7. DOI: 10.13882/j.cnki.ncdqh.2010.09.031
Abstract PDF
Intelligent and Dynamic Management System for Earthing Wires in Substation Site
Zhu Shenghong, Gu Weihua
2010(9): 8-9. DOI: 10.13882/j.cnki.ncdqh.2010.09.001
Abstract PDF
Application of Parallel Bundled Conductors
Zhou Jinliang, Qian Fengqiang
2010(9): 9-10. DOI: 10.13882/j.cnki.ncdqh.2010.09.032
Abstract PDF
Integrating System of Dispatch, Monitor and Distribution Automations in Power Network Belonging to County Level
Mo Jiajie, Xu Guangnian
2010(9): 11-12. DOI: 10.13882/j.cnki.ncdqh.2010.09.023
Abstract PDF
Construction Situation of Intelligent Power Network Haiyan County
Liu Zhangyin
2010(9): 12-13. DOI: 10.13882/j.cnki.ncdqh.2010.09.033
Abstract PDF
Constructing Model and Operating Effect of 35 kV Small Size Unattended Substations
Chen Xinxue, Sun Kejian
2010(9): 14-14. DOI: 10.13882/j.cnki.ncdqh.2010.09.024
Abstract PDF
Optimizing Operating Management Model for Substation to Raise Power Network Operating Stability
Xu Jie
2010(9): 15-15. DOI: 10.13882/j.cnki.ncdqh.2010.09.002
Abstract PDF
Application of Optimum Design for 110 kV Substations
Lu Xinhong
2010(9): 16-17. DOI: 10.13882/j.cnki.ncdqh.2010.09.003
Abstract PDF
Reconstructing Analysis of MV and LV Distribution Network in Beijing Area
Jia Qian
2010(9): 18-19. DOI: 10.13882/j.cnki.ncdqh.2010.09.004
Abstract PDF
Realized form and Application Analysis of VQC
Zhang Haisheng
2010(9): 20-21. DOI: 10.13882/j.cnki.ncdqh.2010.09.025
Abstract PDF
Influence to Reducing Line Loss Due to Reactive Power Compensation Switching Mode of 10 kV Lines
Tan Dongming, Li Ming
2010(9): 22-23. DOI: 10.13882/j.cnki.ncdqh.2010.09.005
Abstract PDF
New Method of Verifying System Installation for Power Consumption Termination
Yao Liwen
2010(9): 23-24. DOI: 10.13882/j.cnki.ncdqh.2010.09.026
Abstract PDF
Cleverly Improving SCADA System to Realize Selection for Earthing Wires
Huang Sixing
2010(9): 25-25,18. DOI: 10.13882/j.cnki.ncdqh.2010.09.006
Abstract PDF
Introduction of LV Line Loss Split-phase Management in Yi County
Xu Yuexiang, Li Yang
2010(9): 26-27. DOI: 10.13882/j.cnki.ncdqh.2010.09.007
Abstract PDF
Fault Analysis of Slowly-opening during Closing Energy-storage for 10 kV Circuit Breakers
Qian Hao, Xiang Weimin, Zhao Luyang, Zhang Peng, Fan Huiliang
2010(9): 28-29. DOI: 10.13882/j.cnki.ncdqh.2010.09.008
Abstract PDF
A Fault Analysis of HV Cable Termination Detonation
Zhu Hongfeng, Xie Haibin
2010(9): 30-31. DOI: 10.13882/j.cnki.ncdqh.2010.09.009
Abstract PDF
Grounding-fault Localization of DC System in Substation
Zhang Jintang
2010(9): 32-32. DOI: 10.13882/j.cnki.ncdqh.2010.09.010
Abstract PDF
Reason Analysis and Settling Measure of Protection Mal-function of Earthing Transformer in 110 kV Substations
Wang Yong
2010(9): 33-34. DOI: 10.13882/j.cnki.ncdqh.2010.09.011
Abstract PDF
Analysis and Processing of Remote Control Fault in Unattended Substation
Teng Xiaohui
2010(9): 35-36. DOI: 10.13882/j.cnki.ncdqh.2010.09.027
Abstract PDF
Speedy Localizing System for Distribution Power Line Fault
Li Wenzhi, Wang Haijiang
2010(9): 36-38. DOI: 10.13882/j.cnki.ncdqh.2010.09.028
Abstract PDF
Commissioning in Site of "Power Network Dispatch Automation System" Using 101(104)protocol
Zhang Shiyong, Chen Chun, Jia Dachang, Chen Yunlun
2010(9): 39-40. DOI: 10.13882/j.cnki.ncdqh.2010.09.012
Abstract PDF
Workflow Platform Based on SAP System
Shen Qing
2010(9): 41-43. DOI: 10.13882/j.cnki.ncdqh.2010.09.022
Abstract PDF
Construction of Power Business and Marketing Information System
Li Xiujie
2010(9): 43-45. DOI: 10.13882/j.cnki.ncdqh.2010.09.034
Abstract PDF
Construction of Risk Management Information System for Power Network Enterprise
Zhao Huiqin
2010(9): 46-47. DOI: 10.13882/j.cnki.ncdqh.2010.09.035
Abstract PDF
Power Network Fault Diagnosis Based on Duplex Datum Sources
Zhang Yi
2010(9): 48-49. DOI: 10.13882/j.cnki.ncdqh.2010.09.029
Abstract PDF
Reducing Probability of Unbalance Between Phase Conductors During Laying Conductors
Wang Xinying, Han Minghua
2010(9): 50-50,56. DOI: 10.13882/j.cnki.ncdqh.2010.09.013
Abstract PDF
Research and Emulation of Tracking Control for Maximum Power Point in Photovoltaic Generation
Hong Daojian, Wang Rijun, Shi Tao, Wu Fubao
2010(9): 53-54. DOI: 10.13882/j.cnki.ncdqh.2010.09.015
Abstract PDF
To Make Rural Hydraulic Power to Better Service for Local Economic Development
Liu Chunyin, Wang Qing, Zhu Fangjun
2010(9): 55-55. DOI: 10.13882/j.cnki.ncdqh.2010.09.036
Abstract PDF
Improvement of Tight Bolt of Driving Device's Sliding Contact Slot for Circuit Breaker Shutter
Wang Haiming
2010(9): 56-56. DOI: 10.13882/j.cnki.ncdqh.2010.09.016
Abstract PDF
New Faulted Phase Conductor Selector Device for Small Current Earthing System Based on PC104
Li Xuhui
2010(9): 57-58. DOI: 10.13882/j.cnki.ncdqh.2010.09.017
Abstract PDF
Application of Receive and Transmit Device for Fiber Optic in Power Communication Network
Zhu Xuebin
2010(9): 58-59. DOI: 10.13882/j.cnki.ncdqh.2010.09.021
Abstract PDF
Renovation of Hidden Trouble Influencing Safety
Hu Shuiping
2010(9): 60-60. DOI: 10.13882/j.cnki.ncdqh.2010.09.018
Abstract PDF
Technical Improvement of Outline Wiring Mode for LV Current Transformers
Lu Qilin
2010(9): 61-61. DOI: 10.13882/j.cnki.ncdqh.2010.09.019
Abstract PDF
Replacement and Installation Working for LV Bundle Conductors
2010(9): 63-64.
Abstract PDF