Advanced Search

column
Development as First and Management for Use to Construct Scientific and Technical Rural Village Power Network——Visitng Deputy General Manager Xu Zhufa from Feixi Power Supply Company
Zhang Fengliang, Yuan Hang
2010(7): 5-6. DOI: 10.13882/j.cnki.ncdqh.2010.07.032
Abstract PDF
Typical Application of "Resource Saving Type, Environment Harmony Type, Industrialization" in Rural Village Power Network
Li Qing
2010(7): 7-8. DOI: 10.13882/j.cnki.ncdqh.2010.07.033
Abstract PDF
Information Resource Conformity in Power Supply Enterprise Belong to County Level
Cui Xiaomeng, Xu Lili
2010(7): 9-10. DOI: 10.13882/j.cnki.ncdqh.2010.07.034
Abstract PDF
Protection Arrangement at New Equipment Starting in Up to 110 kV Power Network
Tang Xianghua, Shi Xiongjie
2010(7): 11-12. DOI: 10.13882/j.cnki.ncdqh.2010.07.001
Abstract PDF
Closed-loop Operation Mode Research for Power Distribution Network
Xu Lin, Zhang Qun, Lu Jiping, , Wang Lei, Zhang Wei
2010(7): 13-15. DOI: 10.13882/j.cnki.ncdqh.2010.07.002
Abstract PDF
Earthing System Design for 35 kV Underground Substation
Luo Yang
2010(7): 15-16. DOI: 10.13882/j.cnki.ncdqh.2010.07.003
Abstract PDF
Essentials of Reforming Construction for Bus Differential Protection in Double Buses Substation
Wang Dayong
2010(7): 17-18. DOI: 10.13882/j.cnki.ncdqh.2010.07.004
Abstract PDF
Testing Method of One after Another Operated Line Protection
Dong Dalong
2010(7): 19-20. DOI: 10.13882/j.cnki.ncdqh.2010.07.005
Abstract PDF
Realization and Application of "Five Preventing Mal-operation System" Based on Topology
MA Yifei, JIN Minggang, ZHANG Jianping
2010(7): 21-22. DOI: 10.13882/j.cnki.ncdqh.2010.07.006
Abstract PDF
Closing Loop Operation Analysis for 10 kV Buses
Xu Honghai
2010(7): 23-24. DOI: 10.13882/j.cnki.ncdqh.2010.07.007
Abstract PDF
Analysis of Standby Power Supply Automatic Connection Device Tripping of Duplicate Supply in Substation
Lu Houxuan
2010(7): 25-26. DOI: 10.13882/j.cnki.ncdqh.2010.07.024
Abstract PDF
Fault Analysis of 220 kV Transmission Line Tripping
Liu Yang
2010(7): 26-27. DOI: 10.13882/j.cnki.ncdqh.2010.07.008
Abstract PDF
Cable Termination Fault Resulted from Construction and Preventing Measures
Zhang Yanyan, Sun Hongwei, Ye Kuan
2010(7): 28-29. DOI: 10.13882/j.cnki.ncdqh.2010.07.009
Abstract PDF
Reinforcement of Dispatching Automation Secondary Safe Prevention Belong to County Level
Jiang Tao
2010(7): 30-32. DOI: 10.13882/j.cnki.ncdqh.2010.07.010
Abstract PDF
Communication Network in Substation for Substation Automation Syste
Chen Lin, Yao Yong
2010(7): 32-34. DOI: 10.13882/j.cnki.ncdqh.2010.07.025
Abstract PDF
Constructing Power Supply Integral Service System Based on WebGIS
Wen Xiangdong, Xu Liguo
2010(7): 35-36. DOI: 10.13882/j.cnki.ncdqh.2010.07.022
Abstract PDF
Integral System of Copying Meter Reading and Collect Fees with Hand Wireless Infrared Ray
Wei Ming
2010(7): 37-38. DOI: 10.13882/j.cnki.ncdqh.2010.07.026
Abstract PDF
Integral System of Electric Energy Quantity Collection and Load Control for Power Distribution Network in Chang Island
Cui Bin, Zhao Zuobin, Zhang Kejie
2010(7): 39-40. DOI: 10.13882/j.cnki.ncdqh.2010.07.027
Abstract PDF
Document Management System for Electric Energy Quantity Based on Web
Shen wei, Wei Mingxin
2010(7): 41-42. DOI: 10.13882/j.cnki.ncdqh.2010.07.023
Abstract PDF
Integral Design of Monitoring and Measuring System Line for Beijing Transmission Line Network
Zhang Liquan, Song Guosheng, Liu Na
2010(7): 43-44. DOI: 10.13882/j.cnki.ncdqh.2010.07.028
Abstract PDF
Rich Achievement of QC Group to Promote High-speed Development for Enterprise
Lu Yang, Xu Dechao, Li Mingjun
2010(7): 45-46. DOI: 10.13882/j.cnki.ncdqh.2010.07.035
Abstract PDF
Improvement of Dismounting and Mounting Tools for Put into and Cut off Type Surge Arrestor
Zhang Zhiqin
2010(7): 47-47. DOI: 10.13882/j.cnki.ncdqh.2010.07.011
Abstract PDF
Reactive Power Optimum Algorithm Based on Network Simplifying, Iterated Solving for Power Distribution Network
Wang Chao, Huang Wei
2010(7): 48-50. DOI: 10.13882/j.cnki.ncdqh.2010.07.012
Abstract PDF
Understanding "Chinese Energy Efficiency Mark", to Choose Energy Saving Appliance
Yu Jie
2010(7): 50-50. DOI: 10.13882/j.cnki.ncdqh.2010.07.030
Abstract PDF
Checking and Replacement of Small-sized Hydro-generator Bearing
Zhan Haofei
2010(7): 51-51. DOI: 10.13882/j.cnki.ncdqh.2010.07.013
Abstract PDF
Technology and Meaning of Biomass Energy Distributed Generation
Tan Zongyun
2010(7): 52-53. DOI: 10.13882/j.cnki.ncdqh.2010.07.014
Abstract PDF
Improvement of High Voltage Current-limiting Fuse Component for 35 kV Voltage Transformers
Bai Liangjun
2010(7): 54-55. DOI: 10.13882/j.cnki.ncdqh.2010.07.015
Abstract PDF
Increasing Anti-short Circuit Ability for Transformer
Yan Dongsheng
2010(7): 55-56. DOI: 10.13882/j.cnki.ncdqh.2010.07.016
Abstract PDF
Increasing Measuring Accuracy for Tong-type Earth Resistance Meter
Zhang Jiayao
2010(7): 57-58. DOI: 10.13882/j.cnki.ncdqh.2010.07.017
Abstract PDF
Design and Application of Analog Device for Watt-hour Meter Misconnection Wiring
Hu Hailong, Zhang Chunting, Ren Yinzhe
2010(7): 58-59. DOI: 10.13882/j.cnki.ncdqh.2010.07.018
Abstract PDF
SAVDC Auto-tracking Compensation Device
He Rupeng
2010(7): 60-60. DOI: 10.13882/j.cnki.ncdqh.2010.07.029
Abstract PDF
An Automatic-tuning Arc Suppression Coil
Lv Hang
2010(7): 61-61. DOI: 10.13882/j.cnki.ncdqh.2010.07.019
Abstract PDF
Repair Technique for Electric Equipmen
Yao Xu
2010(7): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.07.020
Abstract PDF
An Easily Omitted Problem in Electrical Design
Zhao Qiankun
2010(7): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.07.021
Abstract PDF
Repair Process for LV Service Wires
2010(7): 63-64.
Abstract PDF