Advanced Search

column
Keep Forging Ahead with Keen Determination, Innovatory Development, to Actively Construct County Power Supply Enterprise with "One Strong and Three Good"
Yuan Hang, Zhang Fengliang
2010(6): 5-7. DOI: 10.13882/j.cnki.ncdqh.2010.06.040
Abstract PDF
Application of Temperature Measurement System with Distributed Optical Fiber
Song Shitong
2010(6): 7-8. DOI: 10.13882/j.cnki.ncdqh.2010.06.001
Abstract PDF
A Large-range Application of Power Distribution Network Automation in Peng Lai County
Qin Pengli
2010(6): 9-10. DOI: 10.13882/j.cnki.ncdqh.2010.06.028
Abstract PDF
Application of Wireless Private Network in New Type Rural Village Power Network Construction
Sun Jianbo
2010(6): 11-12. DOI: 10.13882/j.cnki.ncdqh.2010.06.032
Abstract PDF
Problem and Counter-measure Resulted From Type Replacement in Protective System
Ji Qinhua, Che Feng
2010(6): 13-13. DOI: 10.13882/j.cnki.ncdqh.2010.06.002
Abstract PDF
Load-flow Calculation in Distribution Power Network with Three Phase Unbalance
Sun Zhen, Qu Ruiqian, Tang Wei
2010(6): 14-15. DOI: 10.13882/j.cnki.ncdqh.2010.06.003
Abstract PDF
Influence to Parameter Testing Due to Split Operation of Lines in One Tower
Lin Jian, Liu Chong, Lin Jian, Zhang Shen, Cai Jianhui, Yang Shouxian
2010(6): 16-17. DOI: 10.13882/j.cnki.ncdqh.2010.06.004
Abstract PDF
Reconstruction of Control Signal for Circuit Breaker
Zhang Lu, Song Qixiang
2010(6): 17-18. DOI: 10.13882/j.cnki.ncdqh.2010.06.005
Abstract PDF
Application of Monitoring System On Line for Oil Pressure in HV Oil Filled Cable
Li Shangguo, Wu Shiping, Tang Jiating
2010(6): 19-20. DOI: 10.13882/j.cnki.ncdqh.2010.06.006
Abstract PDF
Analysis of Voltage Short-time Recovery After Standby Power Supply Automatic Connection
Li peng, Ren Jun, Hou Hongmei
2010(6): 21-21. DOI: 10.13882/j.cnki.ncdqh.2010.06.029
Abstract PDF
Check and Analysis of Partial Discharge in 10 kV Cable Tapping Cabinet
Yuan Qingfang
2010(6): 22-23. DOI: 10.13882/j.cnki.ncdqh.2010.06.008
Abstract PDF
Application of Counter-measurement for Calamity Resulted From Birds in Transmission Lines
Zhou Zhongqiu
2010(6): 23-24. DOI: 10.13882/j.cnki.ncdqh.2010.06.009
Abstract PDF
Analysis of A 35 kV Service Transformer Burning Fault
Yang Jun
2010(6): 25-25. DOI: 10.13882/j.cnki.ncdqh.2010.06.010
Abstract PDF
Reason and Counter-measurement of Fault Due to Conductors Colliding
Zhang Meirong, Yin Li
2010(6): 26-26. DOI: 10.13882/j.cnki.ncdqh.2010.06.011
Abstract PDF
A Disconnecting Switch Fault
Cao Faming
2010(6): 27-27. DOI: 10.13882/j.cnki.ncdqh.2010.06.012
Abstract PDF
Raising of Lightning-protection and Anti-interference Technology for Microprocessor Monitoring System
Feng Libing
2010(6): 28-29. DOI: 10.13882/j.cnki.ncdqh.2010.06.013
Abstract PDF
Leakage Fault for 10 kV Vacuum Circuit Breaker
Zhu Lifeng
2010(6): 29-29. DOI: 10.13882/j.cnki.ncdqh.2010.06.014
Abstract PDF
LV Power Line Carrier Communication Based on OFDM
Ding Wenyan, Sun Zhining
2010(6): 30-31. DOI: 10.13882/j.cnki.ncdqh.2010.06.027
Abstract PDF
Remote Concentrated Copying Kilowatt-hour Meter Reading for Village Power Network in Shunyi Distract
Yu Fei
2010(6): 32-33. DOI: 10.13882/j.cnki.ncdqh.2010.06.033
Abstract PDF
Application of Rechargeable Card System for Electricity Rate in Renqiu City Power Bureau
Li Xiujie, Chen Caijie
2010(6): 34-35. DOI: 10.13882/j.cnki.ncdqh.2010.06.034
Abstract PDF
Full Life Management for Property Based on Radio-frequency Technology
Yao Yanmin, Zhao Hairong
2010(6): 36-37. DOI: 10.13882/j.cnki.ncdqh.2010.06.035
Abstract PDF
Researching Present Situation and Developmental Prospect of Micro-power Network in China
Liu Lijie, Wu Fubao
2010(6): 38-40. DOI: 10.13882/j.cnki.ncdqh.2010.06.015
Abstract PDF
Management System of Tools for Safe Production in Electrical Power
Zhou Houyuan
2010(6): 41-42. DOI: 10.13882/j.cnki.ncdqh.2010.06.030
Abstract PDF
Development and Application of Management System for Relay Protection Setting Sheet
Zhong Congjie
2010(6): 43-43. DOI: 10.13882/j.cnki.ncdqh.2010.06.016
Abstract PDF
QC Group Activity and Meticulous Management for Power Enterprise
Li Chengguo
2010(6): 44-45. DOI: 10.13882/j.cnki.ncdqh.2010.06.036
Abstract PDF
Tactics Stopping Remote Control Rejecting-operation for Capacitor
Pan Pengfei
2010(6): 45-46. DOI: 10.13882/j.cnki.ncdqh.2010.06.017
Abstract PDF
Inquiry of Compensating Mode of Dynamic Reactive Power Optimization in Substation
Gao Zhenjiang, Zhang Lixin, Wu Jinzhao
2010(6): 47-48. DOI: 10.13882/j.cnki.ncdqh.2010.06.031
Abstract PDF
Realizing Save Energy and Reducing Loss Using Economic Operating Means in Rural Area Power Network
Liu Yi, Wang Jinyu
2010(6): 48-49. DOI: 10.13882/j.cnki.ncdqh.2010.06.018
Abstract PDF
Analysis of Public Transformer Line Loss Rate and Enquiry of Reducing Loss Measures
Chen Keyu
2010(6): 50-51. DOI: 10.13882/j.cnki.ncdqh.2010.06.019
Abstract PDF
Systematically Analyzing Power Network, to Quantize Reconstructing Plan
Guo Ruifeng, Wu Zhibin, Li Zhimai, Zhang Yongfei
2010(6): 52-53. DOI: 10.13882/j.cnki.ncdqh.2010.06.020
Abstract PDF
New Method Innovating Line Loss Management—"Compared Means Based on Average Electrical Energy Quantity Loss of Household"
Mao Zhongmin
2010(6): 53-54. DOI: 10.13882/j.cnki.ncdqh.2010.06.021
Abstract PDF
Recommendation of Reactive Power Management for Distribution Network in Mount Area
Yao Hongbing, Yuan Heping
2010(6): 55-55. DOI: 10.13882/j.cnki.ncdqh.2010.06.022
Abstract PDF
Realizing Harmonic Development for Small Hydro-electric Power in New Period
Tong Jiandong
2010(6): 56-57. DOI: 10.13882/j.cnki.ncdqh.2010.06.037
Abstract PDF
Disposal of DC System Insulation Reduction in Wong Wu Shi Hydro-electric Power Station
Sun Jianxue
2010(6): 58-59. DOI: 10.13882/j.cnki.ncdqh.2010.06.023
Abstract PDF
Problem and Solving Proposition of Project Replacing Fuel By Small Hydro-electric Power in Implement
Lu Xinyang, Lu Xingao
2010(6): 59-60. DOI: 10.13882/j.cnki.ncdqh.2010.06.038
Abstract PDF
Polarity and Connection Symbol for Power Transformer
Li Xuhui, Zhu Feng, Chen Daopin
2010(6): 61-61. DOI: 10.13882/j.cnki.ncdqh.2010.06.024
Abstract PDF
Reason Resulting in 35 kV and 10 kV Power Cable Fault
Shen Haihong, Liang Lizhi
2010(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.06.026
Abstract PDF
Analysis of Miss-operation of Pressure Relief Device for 110 kV Main Transformers
Cui Hongraiao, Liang Bo
2010(6): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.06.025
Abstract PDF
Some Small Inventions in Pinggu District Power Supply Company
Feng Lixiang
2010(6): 63-63. DOI: 10.13882/j.cnki.ncdqh.2010.06.039
Abstract PDF