Advanced Search

column
Constructing New Type Rural Village Power Network through Science and Technology Guidance
Jin Zhanqi, Hou Chuang, Yang Yanjie
2010(5): 5-6. DOI: 10.13882/j.cnki.ncdqh.2010.05.037
Abstract PDF
HV and LV Power-line Carrier Remote Copying kWh Meter Reading System in Suning Electric Power Bureau
Fan Baozhen
2010(5): 7-7. DOI: 10.13882/j.cnki.ncdqh.2010.05.035
Abstract PDF
Raising Reactive Power Optimizing Management Level through Scientific Planning
Yan Huipu
2010(5): 8-9. DOI: 10.13882/j.cnki.ncdqh.2010.05.026
Abstract PDF
Particulars and Enlightenments of 500 kV Substations in Japan
Zhao Kai
2010(5): 10-11. DOI: 10.13882/j.cnki.ncdqh.2010.05.025
Abstract PDF
Electric Power Dispatch and Safe Operation of Power Grid
Chen Ya, Yang Qian, Xing Guangjie
2010(5): 12-13. DOI: 10.13882/j.cnki.ncdqh.2010.05.024
Abstract PDF
Planning Thinking of Power Supply Reliability in Rural Village Power Network
Xia Zhongxian
2010(5): 14-15. DOI: 10.13882/j.cnki.ncdqh.2010.05.023
Abstract PDF
Testing Setting of Automatic Connection Time for LV Dual Power Supply
Zheng Qingwei
2010(5): 16-17. DOI: 10.13882/j.cnki.ncdqh.2010.05.034
Abstract PDF
Improvement of Checking Method for Secondary Circuit in Voltage Transformer
Feng Li, Gong Weiqiang
2010(5): 17-18. DOI: 10.13882/j.cnki.ncdqh.2010.05.022
Abstract PDF
Application of Blocking Device Preventing Incorrect-operation in Substation
Tang He, Xiang Yang
2010(5): 19-20. DOI: 10.13882/j.cnki.ncdqh.2010.05.033
Abstract PDF
Perfection of Back Gate Interlocking for HV Switch Cabinet
Yang Weiguo
2010(5): 21-21. DOI: 10.13882/j.cnki.ncdqh.2010.05.021
Abstract PDF
Application of Grounding Protection Intelligential Device for Branching Line
Jia Xuefeng, Yao Yuanzheng, Liu Nan, Wang Shaokun, Ning Aihua, Liu Xuejia
2010(5): 22-22. DOI: 10.13882/j.cnki.ncdqh.2010.05.020
Abstract PDF
Solving Scheme of Phase-sequence Displacement for Loop Network Power Supply
Jiang Zhijian, Wang Lin, Yu Jianfang, Han Weijie
2010(5): 23-23. DOI: 10.13882/j.cnki.ncdqh.2010.05.019
Abstract PDF
Correctly Installing Grounding Wire, to Prevent Incorrect-operation Fault Occurring
Wu Jingfeng, Zeng Zhipeng
2010(5): 24-25. DOI: 10.13882/j.cnki.ncdqh.2010.05.018
Abstract PDF
Reason and Preventing Measure for Bus-bar Differential Protection Malfunction
Shi Guoping
2010(5): 26-26. DOI: 10.13882/j.cnki.ncdqh.2010.05.017
Abstract PDF
Inquire of Compressing Outage Time of Distributing Line
Chen Feng
2010(5): 27-27. DOI: 10.13882/j.cnki.ncdqh.2010.05.016
Abstract PDF
Statistical Analysis and Improving Measure of Operating Fault for Power Distribution Network
Luo Xinghua, Tang Shaolin, Wang Wenbin, Wang Tiansuo
2010(5): 28-29. DOI: 10.13882/j.cnki.ncdqh.2010.05.015
Abstract PDF
Present Situation and Improving Measure of Safe Power Utilization for Substation of Consumer
Chen Huafang, Chen Keyu
2010(5): 29-30. DOI: 10.13882/j.cnki.ncdqh.2010.05.014
Abstract PDF
Immediately Copying kWh Meter Reading Technology
Huang Guosheng
2010(5): 31-32. DOI: 10.13882/j.cnki.ncdqh.2010.05.032
Abstract PDF
Application of PDA Navigation Technology in Copying Power kWh Meter Reading
Liu Qingliang, Wang Lantao
2010(5): 32-34. DOI: 10.13882/j.cnki.ncdqh.2010.05.031
Abstract PDF
Application of GPRS Communication Technology in Automatic System
Cui Meng, Li Lin, Zhao Chunsheng
2010(5): 35-36. DOI: 10.13882/j.cnki.ncdqh.2010.05.027
Abstract PDF
Total Safe Protective Scheme of Dispatch Automatic System
Du Yu, Lai Xuhong
2010(5): 37-38. DOI: 10.13882/j.cnki.ncdqh.2010.05.013
Abstract PDF
Lead Sealing Management Information System
Tian Yongliang, Gan Lin
2010(5): 39-41. DOI: 10.13882/j.cnki.ncdqh.2010.05.030
Abstract PDF
Collective Reckoning and Management Scheme of Electric Charge in Rural Village
Mu Wei
2010(5): 41-42. DOI: 10.13882/j.cnki.ncdqh.2010.05.036
Abstract PDF
Improvement of Connecting Mode for Segmental Conductor
Li Jiazhen
2010(5): 43-44. DOI: 10.13882/j.cnki.ncdqh.2010.05.012
Abstract PDF
Short-circuit Grounding Wire with Intelligential Pronounced Alarm
Wu Zhimin, Wu Zhiqiang
2010(5): 45-46. DOI: 10.13882/j.cnki.ncdqh.2010.05.029
Abstract PDF
Reason Analysis and Settling Method of Line Loss Abnormity in Area Supplied by Pole-mounted Distribution Transformer
Shi Wen, Li Mu
2010(5): 47-48. DOI: 10.13882/j.cnki.ncdqh.2010.05.011
Abstract PDF
Disposal of Divided Current Fault of Secondary Current Circuit in HV Electric Energy Metering Device
Huang Liwen
2010(5): 49-49. DOI: 10.13882/j.cnki.ncdqh.2010.05.010
Abstract PDF
Reason and Counter-measure of Output Reduction of Unit in Gaozhou Hydro-power Station
Zhang Yougui
2010(5): 50-50. DOI: 10.13882/j.cnki.ncdqh.2010.05.009
Abstract PDF
Improvement of Service Power Connection in Minfeng Hydro-power Station
Kong Hutai
2010(5): 51-51. DOI: 10.13882/j.cnki.ncdqh.2010.05.008
Abstract PDF
Particulars and Application of 66 kV Dry Type Current Transformer
Wei Jun, Shi Yang
2010(5): 52-52. DOI: 10.13882/j.cnki.ncdqh.2010.05.007
Abstract PDF
Reform of Shunt Reactor in 220 kV Substations
Guo Zhuqing, Shi Zinan
2010(5): 53-54. DOI: 10.13882/j.cnki.ncdqh.2010.05.006
Abstract PDF
Application of ZCW-126 Open Type Gas-insulated Switchgear
Mei Liangjie
2010(5): 55-56. DOI: 10.13882/j.cnki.ncdqh.2010.05.005
Abstract PDF
Pressure Regulation System of Natural Gas in Qianwan Power Plant
Chen Zhiwei
2010(5): 58-59. DOI: 10.13882/j.cnki.ncdqh.2010.05.004
Abstract PDF
Application of Excel in Reactive Power Compensation Calculation for Power Distribution Network
Li Xinchun, Sun Minhui
2010(5): 60-61. DOI: 10.13882/j.cnki.ncdqh.2010.05.003
Abstract PDF
Knowledge about Putting Wire through Distribution Box
Yue Quanbao, Wang Linna
2010(5): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.05.002
Abstract PDF
Artificial Mistakes Shall Not Be Occurred in Protection Against Lightning
Lin Zhihe
2010(5): 62-62. DOI: 10.13882/j.cnki.ncdqh.2010.05.001
Abstract PDF
Replacing Work for Residual Current Operating Protector
2010(5): 63-64.
Abstract PDF