Attaching importance to particulars, optimizing management, promoting actively power supply reliability
Jin Zhou Power Supply Company
2010(2): 5-7. DOI: 10.13882/j.cnki.ncdqh.2010.02.034
Abstract PDF
Defining aim, reinforcing management, promoting overall managerial level of power supply reliability
BaoDi Power Supply Company
2010(2): 7-9. DOI: 10.13882/j.cnki.ncdqh.2010.02.001
Abstract PDF
Analysis and prevention of wind drift of jumper on tension towers
Xie Yunhao
2010(2): 10-11. DOI: 10.13882/j.cnki.ncdqh.2010.02.004
Abstract PDF
Main points of equal-strength design for rural village power engineering
Jiang Kebin
2010(2): 12-12. DOI: 10.13882/j.cnki.ncdqh.2010.02.003
Abstract PDF
Construction cost control in basic capital construction stage
Liu Yan
2010(2): 13-14. DOI: 10.13882/j.cnki.ncdqh.2010.02.031
Abstract PDF
Substation standardization management
Wang Xiaolan
2010(2): 15-15. DOI: 10.13882/j.cnki.ncdqh.2010.02.002
Abstract PDF
Application of digital reserve power supply automatic connection in power network
Zhou Xiaoqing
2010(2): 16-17. DOI: 10.13882/j.cnki.ncdqh.2010.02.025
Abstract PDF
Applied in the Grid of Intelligent arc-suppression coil
Xu Dapeng, Chen Guolong, Li Haibo, Pao Zailin
2010(2): 18-19. DOI: 10.13882/j.cnki.ncdqh.2010.02.010
Abstract PDF
Application of on-line monitoring for CVT in fault diagnosis
Yan Ling, Cao Jinping
2010(2): 19-20. DOI: 10.13882/j.cnki.ncdqh.2010.02.009
Abstract PDF
Breaker Error Action and Correction
Shi Luning, Sun Guangyong, Yang Xinyu, Jiang Weiming
2010(2): 21-21. DOI: 10.13882/j.cnki.ncdqh.2010.02.008
Abstract PDF
Analysis of operation reason of differential protection for main equipment
Xiao Qingrong
2010(2): 22-22. DOI: 10.13882/j.cnki.ncdqh.2010.02.007
Abstract PDF
Explosion reason and counter-measure of metal oxide surge arresters
Liu Mei
2010(2): 23-24. DOI: 10.13882/j.cnki.ncdqh.2010.02.006
Abstract PDF
Analysis and processing of voltage abnormality in 35 kV earthing system
Zhang Lin
2010(2): 25-26. DOI: 10.13882/j.cnki.ncdqh.2010.02.005
Abstract PDF
Handle official business automatic management system for rural village power safety producing network
Pan Xing, Guo Hongwei
2010(2): 27-28. DOI: 10.13882/j.cnki.ncdqh.2010.02.024
Abstract PDF
Terminal network configuration optimization of automatic system main station of dispatching station in County
Yu Bin
2010(2): 28-29. DOI: 10.13882/j.cnki.ncdqh.2010.02.018
Abstract PDF
Constructing mode of centralized dispatch automatization system in the Ningxia Hui Autonomous region
Zhang Pengcheng, Wu Fubao, Hou Yanli
2010(2): 30-31. DOI: 10.13882/j.cnki.ncdqh.2010.02.017
Abstract PDF
Design and practice of copying kWh meter reading system with low cost
Yang Dongming, Liu Junhua
2010(2): 32-32. DOI: 10.13882/j.cnki.ncdqh.2010.02.029
Abstract PDF
Boosting power business and market development using management system in site
Lin Chaohua, Ye Fangbin
2010(2): 33-33. DOI: 10.13882/j.cnki.ncdqh.2010.02.036
Abstract PDF
Time synchronous system of power network in County level based on GPS
Ji Lanfang
2010(2): 34-35. DOI: 10.13882/j.cnki.ncdqh.2010.02.028
Abstract PDF
Development of residual current operating protector with lack-phase protection
Li Zhaoyang, Zhou Miao, Li Yijun, Lu Tao
2010(2): 36-38. DOI: 10.13882/j.cnki.ncdqh.2010.02.016
Abstract PDF
Boosting scientific development of rural village power enterprise by QC activity
Zuo Jigang
2010(2): 38-39. DOI: 10.13882/j.cnki.ncdqh.2010.02.035
Abstract PDF
Simple analysis of calculating method of power network loss due to harmonics in LV power distribution network
Fu Yueli, Liu Xia
2010(2): 40-41. DOI: 10.13882/j.cnki.ncdqh.2010.02.015
Abstract PDF
Benefit analysis of power distribution network after power network improvement in Bai Tu Gang region
Wu Yanbao
2010(2): 41-42. DOI: 10.13882/j.cnki.ncdqh.2010.02.014
Abstract PDF
Creation and application of theoretical line loss calculating method
Zhang Ke, Wang Shixiu
2010(2): 43-44. DOI: 10.13882/j.cnki.ncdqh.2010.02.013
Abstract PDF
New power generation mode with energy resources-environment-ecology harmonic development
Yan Peihong, Fan Pengxiang
2010(2): 45-46. DOI: 10.13882/j.cnki.ncdqh.2010.02.012
Abstract PDF
Talking about Reactive power automatic compensation device using voltage regulation again
Ye Huiqiang, Gong Huayong
2010(2): 47-48. DOI: 10.13882/j.cnki.ncdqh.2010.02.027
Abstract PDF
Discussion for 10 kV line automatic reactive power compensating device installation
Cao Faming
2010(2): 48-49. DOI: 10.13882/j.cnki.ncdqh.2010.02.026
Abstract PDF
Application of intelligent test, maintenance instrument for battery
Liu Junping
2010(2): 50-51. DOI: 10.13882/j.cnki.ncdqh.2010.02.011
Abstract PDF
Present application situation and problem analysis for fault oscilloscope
Jiao Zanhui
2010(2): 51-52. DOI: 10.13882/j.cnki.ncdqh.2010.02.023
Abstract PDF
Arrangement and application of GIS in small-scale substation in joined area between village and city
Peng Ming, Hu Yijun
2010(2): 53-54. DOI: 10.13882/j.cnki.ncdqh.2010.02.022
Abstract PDF
Analysis and processing of fault for dispatching automatization system
Deng Ping
2010(2): 55-55. DOI: 10.13882/j.cnki.ncdqh.2010.02.021
Abstract PDF
Perfecting scheme of 5 fault preventing measures for microprocessors
Wang Tai
2010(2): 56-56. DOI: 10.13882/j.cnki.ncdqh.2010.02.020
Abstract PDF
Processing method for unsuccessful remote control
Du Yuqing
2010(2): 56-56. DOI: 10.13882/j.cnki.ncdqh.2010.02.030
Abstract PDF
"0~5" laws of temporary power utilization in site
Chen Chidong
2010(2): 57-58. DOI: 10.13882/j.cnki.ncdqh.2010.02.019
Abstract PDF
Examination questions in 2009 for business and market staff in power supply station from State Grid Corporation of China
2010(2): 59-63.
Abstract PDF