  • 摘要: 110 kV GZ变电站10 kV GX线发生单相断线事故,引发的铁磁谐振过电压导致用户设备损坏,对系统的安全运行造成了严重影响。为加深电力人员对断线谐振的理解,并提出有效的抑制措施,文章对事故现象和发展过程进行分析,建立基于ATP-EMTP仿真软件的断线谐振故障仿真模型,验证故障发生机理分析的准确性,并对所提出的断线谐振抑制措施进行仿真试验。最终,结合即墨区供电公司的实际情况,总结出针对不接地系统断线谐振的规律及相应的应对办法,并提出一套可行且有效的预防措施和对策。本研究旨在为断线谐振问题提供更深入的认识,并针对即墨地区供电系统的实际情况提出解决方案,以保障系统安全稳定运行。

     

    Abstract: This paper examines a single-phase open circuit on the 10 kV Gx Line at the 110 kV Gz Substation. The resulting ferroresonant overvoltage damages customer equipment and seriously affects the safe operation of the power system. To deepen power utility personnel's understanding of line-break-induced ferroresonance and develop effective suppression measures, this paper analyzes the fault phenomena and accident progression. It constructs an ATP-EMTP-based simulation model of line-break-induced ferroresonance to validate the mechanism analysis and tests the proposed suppression measures through simulation. Based on actual operating conditions at Jimo District Power Supply Company, the paper summarizes the characteristics of line-break-induced ferroresonance in ungrounded systems and the corresponding response methods. It also proposes a feasible and effective set of preventive and mitigation measures. This study advances the understanding of line-break-induced ferroresonance and offers solutions tailored to the Jimo power grid, thereby supporting its safe and stable operation.

     

/

返回文章
返回