变电站零米层以下工程BIM数字化设计实践

BIM-based Digital Design Practice for Substation Projects Below the Zero-meter Level

  • 摘要: 变电站零米层以下区域涵盖大量隐蔽工程,包括地下管线、接地网、基础在内,传统二维设计模式存在隐患难排查、施工阶段返工多等问题。文章以浙江省某110 kV变电站为依托,结合BIM与MR技术搭建覆盖全专业的三维数字孪生模型,梳理出设计-建模-校验-优化-交付的闭环工作流程,完成了从仅交付施工图纸到交付可直接使用的数字资产的转变,为变电站全生命周期智慧管理打下了基础。

     

    Abstract: The area below the zero-meter level of a substation contains many concealed works, including underground pipelines, grounding grids, and foundations. The traditional two-dimensional design approach has problems such as difficulty in identifying potential hazards and frequent rework during construction. Based on a 110 kV substation in Zhejiang Province, this study uses BIM and mixed reality technologies to develop a three-dimensional digital twin model covering all disciplines. It establishes a closed-loop workflow covering design, modeling, verification, optimization, and delivery. This workflow realizes the transition from delivering construction drawings alone to delivering directly usable digital assets and lays a foundation for intelligent lifecycle management of substations.

     

/

返回文章
返回