提高低压用户负荷曲线采集成功率

Improving the Success Rate of Load Curve Acquisition for Low-voltage Users

  • 摘要: 随着新型电力系统快速发展,低压台区高频采集需求日益增长。然而,受低压配电线路结构复杂、设备条件限制及现场环境干扰等因素影响,低压用户负荷曲线采集成功率提升困难,无法达到预期的采集效果。文章从用电信息采集系统各环节入手,分析了影响低压用户负荷曲线采集成功率的主要原因,提出远程通信网络优化、本地通信升级、大台区拆分等优化措施。通过现场应用,验证了所提措施能够有效提升低压用户负荷曲线采集成功率,对推动配网台区高频采集通信技术发展具有重要意义。

     

    Abstract: With the rapid development of new power systems, the demand for high-frequency acquisition in low-voltage distribution station areas is increasing. However, affected by the complex structure of low-voltage distribution lines, equipment constraints, and on-site environmental interference, it is difficult to improve the success rate of load curve acquisition for low-voltage users, and the expected acquisition effect cannot be achieved. Starting from all links of the power information acquisition system, this paper analyzes the main causes affecting the success rate of data acquisition for low-voltage users and proposes optimization measures such as remote communication network optimization, local communication upgrading, and large station area splitting. Field application verifies that the proposed measures can effectively improve the success rate of data acquisition for low-voltage users, which is of great significance for promoting the development of high-frequency acquisition communication technology in distribution network station areas.

     

/

返回文章
返回