高级检索

一起光伏电站接地变保护误动的原因解析及处理

Cause Analysis and Treatment of Grounding Transformer Protection Misoperation in a Photovoltaic Power Station

  • 摘要: 文章针对某光伏电站发生的一起接地变保护误动,导致35 kV II段母线全停的事故,开展了事故排查与短路电流分析,揭示了接地变保护误动原因及定值配合失效的机理。为防止接地变保护再次误动,依据新能源并网继电保护国家规范与阶段式保护技术要求,从定值配置、时限阶梯配合、保护配置完整性3方面对接地变保护进行系统性优化。经验证,优化方案满足不小于0.3 s的时限级差与时序配合要求,可有效防范保护误动,对光伏电站安全稳定运行提供技术参考。

     

    Abstract: This paper investigates an incident at a photovoltaic power station in which misoperation of grounding transformer protection causes a complete outage of the 35 kV Section II busbar. Through accident investigation and short-circuit current analysis, it reveals the cause of the protection misoperation and the mechanism of setting-value coordination failure. To prevent misoperation of grounding transformer protection from happening again, the grounding transformer protection is systematically optimized in accordance with national standards for new energy grid-connected relay protection and staged protection technical requirements, from three aspects: setting configuration, time-delay graded coordination, and protection configuration integrity. Verification confirms that the optimized scheme satisfies both the time-delay grading requirement of ≥0.3 s and the timing coordination criterion, effectively preventing protection misoperation. This paper provides a technical reference for the safe and stable operation of photovoltaic power stations.

     

/

返回文章
返回