110 kV变电站继电保护设备安装调试施工技术研究

Research on Installation, Debugging and Construction Technology of Relay Protection Equipment in 110 kV Substation

  • 摘要: 为保障变电站安装运行,开展110 kV变电站继电保护设备安装调试施工技术的研究。根据规范,敷设变电站继电保护设备等电位接地铜排,以高压开关柜为例,进行安装位置的调整与固定;设计母线槽对插连接方式,进行母线连接与二次接线调试;辅助自动化测试工具,设计继电保护设备的自动化调试方案。实践结果表明,设计的方法在应用后,不仅可以保证设备安装位置偏差在允许范围内,还能实现设备的电气绝缘,保证绝缘电阻达到设计值标准。

     

    Abstract: To ensure the installation and operation of substations, this study investigates the installation and commissioning construction technology of relay protection equipment in 110 kV substations. According to standards, equipotential grounding copper bars for substation relay protection equipment are laid, with high-voltage switchgear used as an example for adjusting and fixing installation positions. The busbar joint connection method is designed, followed by busbar connection and secondary wiring commissioning. An automated debugging scheme for relay protection equipment is developed with the aid of automatic testing tools. Practical results demonstrate that the proposed method not only ensures equipment installation position deviations remain within allowable limits but also achieves electrical insulation, with insulation resistance meeting design value requirements.

     

/

返回文章
返回