主变保护改造中10 kV母线不停电的母联传动关键技术研究

Research on Key Technologies of Bus Tie Transmission Without Power Outage for 10 kV Bus During Main Transformer Protection Retrofit

  • 摘要: 文章针对变电站主变保护改造过程中10 kV母线无法停电的问题,开展了不停电改造技术研究。通过采用挑线测电位、加装出口压板、增设中间继电器、利用检修压板以及数字仿真测试仪等技术,在不实际传动母联开关的前提下,完成了主变低后备保护与母联开关跳闸及闭锁回路正确性的验证。同时,针对TV二次电压回路的接入难题,对比了停TV转接与故录屏取电压2种方案在优缺点及风险方面的差异。通过方案比选与优化,最终形成了一套安全高效的不停电改造典型作业方案及相应的风险管理体系。

     

    Abstract: This paper investigates retrofit technology without outage to address the problem that the 10 kV busbar cannot be powered off during main transformer protection retrofit in substations. By adopting techniques such as conductor selection and potential measurement, installation of trip output links, addition of intermediate relays, use of maintenance links, and digital simulation testers, the correctness of the low voltage side backup protection of the main transformer and the tripping and blocking circuits of the bus-tie breaker is verified without physically operating the bus-tie breaker. Meanwhile, for the difficulty of accessing the TV secondary voltage circuit, the advantages, disadvantages, and risks of two schemes, namely TV outage transfer and voltage acquisition from the fault recorder panel, are compared. Through scheme comparison and optimization, a safe and efficient typical work procedure and corresponding risk management system for retrofit without outage are finally developed.

     

/

返回文章
返回