基于扩大内桥接线式变电站在综自改造中的电压并列问题分析处理

Analysis and Treatment of Voltage Parallel Problem Based on Expanding Internal Bridge Connection Substation in Integrated Automation Transformation

  • 摘要: 针对一起扩大内桥接线式变电站110 kV系统配置三段母线、两台母线压变,在综自改造中的原电压并列设计方案未满足保护及自动装置采样而出现的问题分析与处理,提供了一种新的接线处置方案,并对原、现设计的接线方案的差异性及后期运维中的注意事项提供分析说明,防止运维操作过程中出现母线电压无法采集影响保护及自动装置的异常事件,对后期运维人员在电压并列装置改造过程提供参考和借鉴。

     

    Abstract: Aiming at the problem that the original voltage parallel design scheme does not meet the protection and automatic device sampling in the comprehensive self-transformation of the 110 kV system configuration of the three-section bus and two-bus voltage transformer in the 110 kV system of the expanded inner bridge connection substation, a new wiring disposal scheme is provided. The difference between the original and current design wiring schemes and the matters needing attention in the later operation and maintenance are analyzed and explained to prevent the abnormal events that the bus voltage cannot be collected and affect the protection and automatic device during the operation and maintenance operation. It provides reference for the later operation and maintenance personnel in the voltage parallel device transformation process.

     

/

返回文章
返回