Citation: | ZHU Jie. Analysis of Continuous Faults in a 10 kV Transmission Line and Discussion on Measures to Improve Power Supply Reliability[J]. RURAL ELECTRIFICATION, 2024, (11): 53-56, 61. DOI: 10.13882/j.cnki.ncdqh.2405A015 |
the wet weather during plum rain season has posed a great threat to the reliable running of substations in coastal areas. Particularly, it is quite rare that 7 10 kV distribution lines connected to 2 110 kV substations breakdown continuously. Thus, failure analysis on this phenomenon would make significant sense to coastal power supply companies for re-examine these potential threats and make measures to improve power supply reliability in distribution network.
[1] |
王明华,张国锋,刘建军. 110 kV同塔双回线路两次同时雷击跳闸原因分析及防范措施[J]. 农村电气化,2019,5(3):38−39.
|
[2] |
张津. 配电线路常见故障跳闸原因分析及预防措施探讨[J]. 中国设备工程,2022(S2):313−314.
|
[3] |
张知宇,张威,操晨润,等. 某220 kV变电站线路开关遥控合闸故障分析[J]. 农村电气化,2022(10):48−51.
|
[4] |
ZHU D, ZENG W, SU J . Construction of transformer substation fault knowledge graph based on a depth learning algorithm[J]. International Journal of Modeling Simulation and Scientific Computing, 2023.14(1). DOI: 10.1142/S1793962323410179.
|
[5] |
BHATTACHARY A B, SINGH M. Performance analysis of adaptive smart controllers for islanded microgrid[J]. International journal of emerging electric power systems, 2022. DOI: 10.1515/ijeeps-2020-0249.
|
[6] |
RANJAN M, SHANKAR R. A cascade fractional type-II fuzzy control approach for enhancing frequency stability in a smart grid system with diverse energy resources[J]. Iranian Journal of Science and Technology, Transactions of Electrical Engineering,2023(4):47.
|
[7] |
陆政君,范春菊,赵铎,等. 不同电压等级同杆双回线断线故障分析方法[J]. 电网技术,2021(4):1588−1595.
|
[8] |
LI Mingrui, et al. A fast power control method based on high-speed communication for the continuous co-phase traction power system[J]. iEnergy,2022,1(4):395−399. doi: 10.23919/IEN.2022.0054
|