Citation: | LI Yu, WU Qiuning, LENG Xuemei, ZOU Huan, SU Weijian. Research on Site Selection and Capacity Determination of Distributed Power Sources in Rural Distribution Networks[J]. RURAL ELECTRIFICATION, 2024, (7): 15-19. DOI: 10.13882/j.cnki.ncdqh.2024.07.004 |
In response to the low technical level and limited consumption capacity of rural distribution networks, as well as the focus of rural users on cost considerations, this paper constructs a distributed power generation site selection and capacity determination model with the objective function of minimizing voltage offset, network loss, and investment cost, starting from the key considerations of power grid safety, stability, and economy. Based on this model, three multi-objective intelligent algorithms (NSGA-Ⅱ, DBO (Dung Beetle) algorithm, MOPSO algorithm improved by niche technology) are used to discuss the site selection of IEEE33 nodes, Verify the effectiveness of the model. At the same time, using MATLAB to develop a forward and backward power flow calculation method, the voltage distribution and network loss of the three calculation results when connected to the system were discussed, and it was found that the MOPSO algorithm based on niche has more advantages in the location and capacity determination of distributed power sources in rural power grids.
[1] |
李忠连. 分布式光伏接入对配电网影响及选址定容优化研究[D]. 东北农业大学. 2021.
|
[2] |
潘超,孟涛,蔡国伟,等. 主动配电网广义电源多目标优化规划[J]. 电工电能新技术,2016,35(3):41−46,75. doi: 10.3969/j.issn.1003-3076.2016.03.007
|
[3] |
董慎学. 含分布式电源的配电网线损研究[D]. 长沙理工大学. 2011.
|
[4] |
郭红霞,任智君. 考虑不同投资主体储能运行策略的主动配电网多目标规划[J]. 智慧电力,2019,47(11):22−28,34. doi: 10.3969/j.issn.1673-7598.2019.11.004
|
[5] |
李扬,冯博,李国庆,等. 计及储能接入影响的主动配电网分布式电源双层规划[J]. 太阳能学报,2017,38(12):3311−3318.
|